STEP 1
The Determine Sequence step determines, in which sequence materials are costed, and assigns all materials to a costing level
Click on the icon of column «Parameter»
STEP 2
Go back by clicking
STEP 3
Click on
STEP 4
Click on in the column «Execute»
STEP 5
The log is displayed.
Usually no further checks necessary
STEP 6
Click on below the frame
STEP 7
STEP 8
There should be a green square in column «Status» and the number of materials successful selected in column «Successful».