Draft

Draft procedure is work in progress.

1. Purpose 

This is a comprehensive Procedure document for SyWay SAP systems Patch Maintenance, covering both On-Premise and SaaS/Cloud (Public and Private) deployments. This procedure defines the standardized process for planning, assessing, applying, testing, validating and documenting SAP patches (Support Packages, Security Notes, Kernel patches, Hotfixes etc.) across the landscape. The goal is to minimize security risks, ensure system stability and compliance, reduce downtime, and maintain business continuity while adhering to the shared responsibility model in cloud environments.

1.1 Key Objectives

  • Apply security patches regularly on monthly basis (especially SAP Security Notes released on Patch Day).
  • Manage functional corrections, support packages, Hotfix Collections (HFC), Kernel updates and other Infrastructure patches.
  • Coordinate maintenance across SAP Rise Private Cloud Edition (PCE), BTP, SaaS and components deployed in Azure/AWS CSPs, which are part of SyWay program.

2. Scope 

The process mentioned in this document is applicable to following categories of Applications for both ROW and China specific instances.

CategoryApplication Series - 1Application Series - 2
SAP Rise

SAP S/4HANA

SAP Cloud Connector
SAP Data Provisioning Agent

SAP Web Dispatcher

SAC Agent
OpenText Connector
SAP TM Optimizer
AzureSAP WWI Server
NextLabs Policy Server
OpenText xECM
Syniti Replicate (China)
Syniti Connector (China)
AWS

Syniti Replicate (ROW)

Syniti Connector (ROW)


SAP BTPAsset Performance Management
Profitability and Performance Management
Build Work Zone
Task Center
Cloud Identity Services (IPS+IAS)
Identity Access Governance
Datasphere
SAP Analytics Cloud (SAC)
Integration Suite
Forms Service by Adobe

Business Network Freight Collaboration

Risk and Assurance Management

Business Network Global Track and Trace
Sustainability Footprint Management
Sustainability Control Tower
Group Reporting Data Collection
Advanced Financial Closing
Document Reporting Compliance

SaaS

SuccessFactors

Ariba 

ICertis

Salesforce

Syniti Knowledge Platform

BlackLine

Kinaxis Maestro

WalkMe
OpenText Cloud (Core Capture & Archiving)
Bloomberg
Vertex
EDICOM

3. Guiding Principles

  • Prioritize security notes and aim to complete installation across the landscape within the same month
  • Plan support pack upgrade for applicable systems once a year.  Avoid patching before Major release. 
  • Always test in non-production environments first.
  • Use SAP Cloud ALM for unified visibility across hybrid landscape.
  • Maintain uniform patch levels across landscape where possible.
  • Maintain detailed documentation of all changes for future reference (i.e., SOX and GDPR compliance).
  • Define clear rollback plans in production (backups + transport rollback).
  • Schedule regular Patch Day reviews with relevant stakeholders at regular intervals.
  • For SaaS, subscribe to product community pages and cloud service status for schedule and plan.

4. Maintenance Procedure 

4.1 SAP Rise

4.1.1 Support Package Stack (SPS)

Refer to Upgrade process outlined here. All environments in the landscape as per Upgrade plan.  Refer to below best practices when planning SPS upgrade

  • Side Effect Notes - Review side effects notes released with SPS, assess and take a decision on scope
  • Component Version Notes - Review the notes released with component versions and known bugs released via notes
  • Kernel Patches - Always include Kernel patch along with SPS upgrade
  • Client Tools - Assess and include client tools such as DB clients or SAP GUI client etc.
  • Add-on components - Assess and include add-on components

4.1.2 Kernel Updates 

The frequency of Kernel updates is a balance between maintaining a stable system and staying protected against security threats. Kernel updates should be part of quarterly update cycle (every 3 months) and should be part of maintenance window on a quarterly basis. 

Refer to below key points when planning Kernel update 

  • Monitor the "New" Kernel - Do not download the patch immediately after it is release. It is often a good practice to wait at least 2 weeks after a patch is released.
  • Kernel version - Maintain same kernel version across the landscape
  • Side Effect Notes or Known Bugs - Kernels are usually released with central note listing known bugs or pre-requisite OS patches. Check and take a decision on scope
  • Database client - Kernel update is the best time to refresh DB clients. 

4.1.3 ST-PI and ST-A/PI Plugins

The best practice is to maintain these plugins at the latest or second-latest Support Package  to ensure the data collection modules match the latest cloud ALM features. Unlike Kernel or SPS upgrades, ST-PI and ST-A/PI are "low-risk" plugins, which does not require a system restart. These plugins can be included in quarterly update cycle along with Kernel updates.

4.1.4 Hot News

SAP releases a "Hot News" Security Note (specifically for vulnerabilities with a CVSS score of 9.0 or higher), these Hot News notes will bypass the quarterly/monthly cycles and should be applied immediately in next available maintenance windows. Hot News will usually affect components such as Internet Communication Manager (ICM) or the SAP Gateway

4.1.5 Application add-on Components & Others

In general, SAP application add-on components (such as Open Text, TM Optimizer etc.) and other components (DP Agent, Cloud Connectors, Web Dispatcher) are subjected to SAP Application Life Cycle Maintenance approach and SAP Security Patch Day every month. However, some of these components may have different patching rhythm. The best practice is to include these components into Quarterly Cycle Patch maintenance scope and perform latest or second-latest patch upgrade as of that quarter. 

4.1.6 Security Notes

Below high level steps to be followed each month starting on SAP Patch Day (2nd Tuesday) which are sequenced as per SyWay approach.

4.2 Public Cloud (SaaS)

SAP or Vendor manages and follows the application maintenance through the landscape. Platform team to monitor and communicate with relevant stakeholders to fulfill Syensqo responsibilities.

4.3 Azure/AWS dependent components

Applications installed in Axure/AWS will follow IT patch maintenance life cycle process. More details will be updated in next revision.

5. Roles and Responsibilities

5.1 Shared Responsibility Model

Under RISE with SAP, security responsibilities are divided between SAP Enterprise Cloud Services (ECS) and the customer. That means SAP do not handles all patching automatically

SAP ECS — Infrastructure Layer

Customer — Application Layer

•       OS-level security patching (hyperscaler VMs)

•       Database (HANA) patching & administration

•       Network, compute & storage maintenance

•       HotNews/Emergency notes with no manual steps

•       JAVA component patches (standard contract)

•       System reboots for infrastructure patches

•       24×7 infrastructure monitoring

•       Key management for data at rest

•       Review & risk-assess all SAP Security Notes

•       Request application patches via Service Request

•       Provide downtime windows for scheduled patches

•       Test all implemented notes in DEV and QAS

•       Authorise transport to Production

•       User administration, roles & authorisations

•       Custom ABAP/code security & SoD management

•       RFC access restriction & security configuration

5.2 RACI Matrix

Below is the RACI matrix to be followed for applying the Security Notes on a monthly basis

Activity

SyWay Platform Team

Security

Functional Owner

SAP ECS

Download/Review Security Notes 

R, A


I

I

Perform Impact Assessment

R

R, A

C

C

Note Prioritization

A

R

C

I

Raise Jira

R

A

I

I

Implement note — application layer

R, A

C

I

I

Testing

R, A

R

R

I

Approve & deploy via Active Control

R, A

C

C

I

Post deployment Monitoring

R, A

C

I

I

Documentation & Governance

R

A

I

I

R = Responsible  |  A = Accountable  |  C = Consulted  |  I = Informed

6. Patch types, Frequency and Schedule

6.1 Monthly Candence Meetings

Monthly Cadence meetings are required to inform relevant stakeholders on patch maintenance/schedule. Below are the meeting details

Meeting AgendaParticipantsMeeting date/time
  1. Review the Security Notes scope/assessment and seek approval
  2. Review implementation schedule
  3. Review Monitoring Status of previous month patch deployment
  4. Update on upcoming releases/deployment
Technology Lead, Integration Lead, Cross Release Lead, Platform Lead, Security Lead, ECS CDM/TSM, ABAP Lead, Integration Lead

2nd Thursday of every month. 

Time - to be decided

Duration - 55 mins

6.2 SAP Rise

Patch typeFrequencyImplementation DurationScheduleMaintenance WindowRemarks
HotfixesOn DemandImmediateNext available windowNext available windowAssess, test and deploy immediately
Security NotesMonthly basiswithin month of Patch dayJan, Feb, Mar, Apr, May, June, July, Aug, Sep, Oct, Nov, Dec

China -

Non-Prod - 2nd Friday of each month, 23.00 - 3.00 AM CET

Prod - 4th Sat of each month, 03:00 - 07:00 CET

ROW - 

Sandbox, Dev and IT - 2nd Sat of each month, 03:00 - 07:00 CET

QAS, Parallel run, Training - 3rd Sat of each month, 03:00 - 07:00 CET

Prod - 4th Sat of each month, 03:00 - 07:00 CET

Apply based on assessment and priority. 
KernelQuarterlyWithin the same month of a quarterFeb, May, Aug, NovPlan security notes, Kernel, ST plugins and applicable component upgrades in the same quarterly cycle
ST-PI and A/PIQuarterlyWithin the same month of a quarterFeb, May, Aug, Nov

Application add-on Components & Others

QuarterlyWithin the same month of a quarterFeb, May, Aug, Nov
Support Pack StackYearlyAs per project planAs per planAs per planFollow guidelines specified in section 4 above. 

6.3 Public Cloud (SaaS)

For SaaS applications managed by SAP or other vendors, SAP or vendor manages and applies bi-weekly and quarterly updates as per their application life cycle management process. Platform team to monitor, communicate and coordinate the SaaS application upgrades with relevant stakeholders as per the schedule published by SAP or other vendor.

6.4 Azure/AWS dependent components

The applications hosted in Azure/AWS will follow the Patch maintenance schedule of Syensqo IT. More details will be updated in next revision.

7. Testing

Below are the key points to consider to limit the testing scope by Technology or Functional resources

  • Based on the impact assessment, either limit the scope of testing to impacted functional/technical scenarios or focus on critical scenarios in the system
  • Test in Preview or test tenant for SaaS applications or Integrated Test environment for SAP Rise application
  • Limit the scope of testing to 2-3 days (max)

8. Monitoring and Compliance

8.1 Monitoring

  • Cloud ALM - There are several tools available within Cloud ALM.  Configuration & Security Analysis to be leveraged for component version checks, Health Monitoring to be leveraged for post notes/patch implementation to check security notes implementation across the landscape.
  • Early Watch Alert - EWA is a automated diagnostic service that monitors the health, performance and security of the SAP landscape

8.2 Compliance

Compliance for SAP Security Notes centers around Vulnerability Management  and change control

TypeDefinitionRecommendation
SLA AdherenceSAP standard best practice recommendation is to apply patches based on CVSS score or priority

Hot News - within 5 business days

High Priority - within 30 days

Documentation & Audit trailEvery patch must be linked to associated change control process and details need to be updated as per maintenance procedure stated in this procedure document. Jira request is required. Documentation is to be maintained in Jira. Jira Board for tracking initial notes, scope and deployment status for each month
Segregation of Duties (SoD)The person downloaded/assessed notes should not be the one signing-off on functional testingFunctional owner sign-off required
Landscape consistencyCompliance requires that same patch is applied across all environmentsCloud ALM version