1. Objective and Scope
1.1 Objective of this Procedure
The objective of this procedure is to describe the creation and update of Sites in the BFC tool of SYENSQO Group.
1.2 Scope
This procedure applies to the BFC Administration team.
3. Definitions & Accronyms
BFC - Business Objects Financial Consolidation (Syensqo's Group Consolidation Tool)
BFC_Prod_SCO_SCO - Production database of BFC dedicated to Consolidation and Reporting cycles
BFC_Top_SCO - Customizing database of BFC (companies - scopes - category scenarios - exchange rates - reports...) to the sole usage of BFC Admin team. Updates of customizing subject to piloting to BFC_Prod_SCO_SCO once finalized.
BFC-Admin - BFC Administration Team (team in charge for the Functional Administration of the BFC).
GAR - Group Consolidation Team
HSE - Health, Safety and Environment Provision
GBS FSL SU FA GL - Global Business Services / Finance Service Line /Service Unit Financial Accounting - General Ledger
ERD - Environmental & Rehabilitation Department
GT CALAME - IS application hosting HSE and Restructuring provisions, with interfaces from and to SAP
4. General Overview
4.1 Principle and Context
In BFC, Site is a customized dimension defined in the Dimension Builder module, used to detail HSE and Restructuring provisions.
Restructuring provisions includes all the measures designed to permanently adapt structures, production and employees (production, sales, administrative) to economic changes. Restructuring plans include site closure and/or stop of activity. While the HSE provisions include the prevention and remediation of environmental damages at contaminated sites, and from the closure of authorized activities.
These Balance Sheet provisions are reported in BFC every month in ACTUAL2 reporting category, while they are detailed per Site on a quarterly basis in the same ACTUAL2 category.
The split of HSE and Restructuring provisions by Site is reported in the following package schedules every quarter:
- Schedule: L6310 - Restructuring provisions - By Plan/ Site/ Year
Heading: L15800 - Long-term provisions for restructuring
Heading: L45800 - Short-term provisions for restructuring
- Schedule L6325 - Environmental Provisions / Site
- Heading: L15940 – Long-term provisions for environmental liabilities
- Heading: L45940 – Short-term provisions for environmental liabilities
The HSE provisions figures are computed in the IS application CALAME (GT CALAME) managed by GBS FSL GL team. The information is collected within this tool, that works on a questionnaire basis, allowing the communication between the stakeholders involved in those processes. The Environmental & Rehabilitation Department answers this questionnaire reporting the forecasted cash flows for each Site under its responsibility.
GBS FSL SU FA GL team is in charge to use the interfaces to upload data between CALAME and SAP, and then to upload data from SAP to BFC. Note that both BFC and SAP figures must be aligned with the ones provided via CALAME.
In SAP, the Sites available to be used can be seen in the transaction SM30 - Maintain Table Views within the table ZZF_CALA_SITE - Calame Sites managed by FSL SU FA GL team.
4.2 Responsibility - Authorized Requesters
The creation of a new Site should be approved by the following people:
- Group Financial Controller in GAR team;
- or by Consolidation Manager in GAR team.
4.3 BFC Process Overview
The BFC-Admin Team is responsible:
- To validate that the initial request (usually submitted by FSL SU FA GL) has been approved by GAR
- To validate if the proposed code for the new Site is still available in BFC (i.e. not being used by another site) and if the requested codification can be implemented (i.e. it fits with technical constraints from BFC);
- To create the new Site and to make it available in BFC Production database.
5. Site Creation in BFC
5.1 Site Creation in BFC - Create the New Site Code in BFC_Top_SCO
5.2 Site Creation in BFC - Transport the New Site Code to BFC_Prod_SCO database
In BFC _Top:
In BFC_Prod_SCO:
6. Internal Controls
It is part of the internal controls to archive the evidences of the objects created in the BFC_Top_SCO and transferred to BFC_Prod_SCO, as well as the approval initially obtained from the appropriate people.
The main objective of this procedure is to assure that the request for creation of new Site codes in BFC is duly approved (GAR team) and updated accordingly in the BFC_Prod_SCO database for final usage in the BFC Reporting.
This way it is possible to assure conformity between the data collected in GT Calame, posted in SAP and reported in BFC.
END OF THE PROCEDURE.






















