Step What to check ?Where to check ?How to check ?
#1Check status of all the monthly jobsDscp DiPx batch execution report 
  • emails from DSCP_Solvay

  • In case if a job running with error, open the log file joined to the mail and search for errors messages : 
  • Analyse the root cause of the error and communicate with DIP PP team and interface team to solve it


Workspace SBS - Technical view
  • Check all job status 

#2Run jobs if necessary

Administrator / Macros / Shared macros

(normally must be executed by interface team) 

Normally must be executed by interface team

#3Execute Monthly Task sequenceConfiguration / Task sequences/ Shared sequences

In case there was an error during the automatic execute monthly task sequence only:

In DIP1 

In DIP2

#4Verify the Horizon rotationGBUs workspace Open some views (example DRP views) and check the change of month
#5Check Imported datasStructure / User models / U00 - IN Import

Check data consistency of the most important data : 

I500 Initial Inventory 

      =>For SILICA => Homologated inventory
      plant 7528 in SI DIP = plant 7525 in SAP

I402 End of month unristricted Inventory 

I402 - Actual Shipped at GI 
(Attention for Silica: in case of incoherance, you might check the movements  633; because the movement is from shipped to consignment) 

I400 - Intransit inventory in receipt date

I400 Firm Shipment in shipping

I200 Final Forecast in ETD 

I500 Blocked stock


You need to compare with SAP or DP data to be sure that everything is ok.

Attention for Silica 7528 in Dynasys is 7528 in Dynasys

#6Check general S&OP dataS&OP workspace

Select some  key products (most produced, most sold, basic products) and check some indicators coherence like

Arithmetical inventory

Shipping plan vs Shipping requirements, 

Global Balance reports


#7Specific Silica - Transit inventoryU00 - Actuals Month

Check the Transit inventory SILICA => We must have data for the previous month

Compare results between the 2 parameters as well as the total quantity on M-1 of the parameter I402 - End of month transit inventory SILICA, must be equal to the Sum of all quantities in transit of the paramter  I400 Intransit inventory in receipt date

#8Check SAP Independent requirementsMD63 in SAP

Check between SAP and Dynasys the Forecast exported

=> Take 3 SKUs PW as examples by BU


> Novecare : in DIP, Final Demand after netting (last validated) in CS model

!!! Please take examples from Sites where forecast export is activated!!!

!!! Please take examples when forecast is different from 1 month to another !!!

You can use this specific Grid view to help the monitoring.



In MD63, please fill the Plant/Material and the month to check.



> Special Chem: (in progress)


> TS: in DP, Final Forecast in U99














For DIP3:

#1Check status of all the monthly jobsSBS - Technical views

Before starting the checks, be sure that the dynamic import is finished.

If not → wait until it end

#2

NOVECARE - Cancel Order bookShortcut "0. Reactivate the Open OrderBook"

Check that the boxes are ticked for all the sites except Ospiate (7851R) and Moerdjik (8298R).


#3 NOVECARE - Consistency of dataSimulate Felix account (FLESSARD) and be open A2. SOP Planning

Find a SKUs as example and check the following data:

  • Initial inventory = between DIP and SAP (MB5B)
  • Firm independent requirement= between DIP and SAP (MD04)
  • Firm planned order = between DIP and SAP (MD04)
  • Intransit = between DIP and SAP (MD04)
  • Forecast = between DP and DIP (Final Forecast ETD) (ex of DFU: 98673R@55099R)
  • External purchase from SAP = between DIP and SAP (MD04)
  • Firm receipt ETA = between DIP and SAP (MD04)

Check the projected inventory calculated by the DRP is correct 

Check that the final demand after netting seems ok.

Check that export to QV batch has run without error (SBS technical view)

#4Check SAP Independent requirementsMD63 in SAP

Check between SAP and Dynasys the Forecast exported

=> Take 3 SKUs PW as examples by BU


> Novecare : in DIP, Final Demand after netting (last validated) in CS model

!!! Please take examples from Sites where forecast export is activated!!!

!!! Please take examples when forecast is different from 1 month to another !!!

You can use this specific Grid view to help the monitoring.



In MD63, please fill the Plant/Material and the month to check.

#5CommunicationSend an email to the DIP3 users