| Status | Approved |
|---|---|
| Owner | |
| Stakeholders |
Purpose
The purpose of this document is to define the conversion approach to maintain the project status in S/4 HANA.
Project and WBS element status consists of System and user statuses which together controls business functions allowed on the object. In the SyWay solution there is integration between the status of the project in PS and the PPM Item.
Conversion Scope
The scope of this document covers the approach for converting active Project status from Legacy Source Systems into S/4HANA.
The status of Projects and WBS elements migrated from Legacy system is aligned with the status Legacy system, the status from legacy may be mapped to either a system or a user status in S/4 Hana.
Projects created in S/4 with status created has the system status released applied, this does not apply to template projects .
Relevancy Criteria
The data from legacy system includes:
- Projects Definition migrated to S/4 Hana where
- Project System Status not Created or Released or
- Project User Status is Maintained
- WBS elements migrated to S/4 Hana where
- Project System Status not Created or Released or
- Project User Status is Maintained
- Projects in S/4 with system status Created
The data from legacy system excludes:
- Projects not migrated to S/4
Projects with created status in S/4
This will allow the posting of actual and the settlement of cost to AUC's as required by
- CNV-9031 Project-Actual GL Line Items (PNL-WBS for AuC)
- CNV-9032 GL Line Items (PNL Internal Order, Statistical/Opex WBS)
Before Posting Financials (Scenario 1):
- Projects in Created Status - Release projects to allow for posting
After Posting Financials (Scenario 2 and 3):
- WBS Elements created in CNV-1022 Portfolio Items - update WBS element status as per the status in legacy system
- This includes system and user status
- Projects Created in CNV-1022 Portfolio items - update project status as per the status in legacy system
- This includes system and user status
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
| WP2 | Project Definitions with Reference to PPM Items | S/4 | ||
| WP2 | WBS elements with Mapping from CNV-1026 | S/4 | ||
| PF2 | Project Definitions with Reference to PPM Items | S/4 | ||
| PF2 | WBS elements with Mapping from CNV-1026 | S/4 | ||
| S/4 | Projects with created in status | S/4 |
Identification
Project Status
Select Object number from table PROJ for PSPID equals Legacy ID
Select Statuses from table JEST using Object Number excluding Created (I0001) or Released (I0002)
WBS Status
Select Object number from table PRPS for PSPHI equals Legacy ID
Select Statuses from table JEST using Object Number excluding Created (I0001) or Released (I0002)
S/4 Projects Status
Select Object number from table PROJ where PSPID <> T*
Select Statuses from table JEST using Object Number where status is Created (I0001)
Additional Information
Multi-language Requirement
Not Applicable
Document Management
Not Applicable
Legal Requirement
Not Applicable
Special Requirements
Not Applicable
Target Design
The technical design of the target for this conversion approach.
Project Level
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| PROJ | PSPID | PS_PSPID | Project Definition | CHAR | 24 | Mandatory |
| System Status | CHAR | Optional | ||||
| User Status | CHAR | Optional | ||||
| JEST | OBJNR | J_OBJNR | Object Number | CHAR | 22 | System Generated |
| JEST | STAT | J_STATUS | Status | CHAR | 5 | System Generated |
| JEST | INACT | J_INACT | Indicator Status is inactive | CHAR | 1 | System Generated |
| JEST | CHGNR | J_CHGNR | Change Number | NUMC | 3 | System Generated |
WBS Level
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| PRPS | POSID | PS_POSID | WBS ID | CHAR | 24 | Information only |
| System Status | CHAR | Optional | ||||
| User Status | CHAR | Optional | ||||
| JEST | OBJNR | J_OBJNR | Object Number | CHAR | 22 | System Generated |
| JEST | STAT | J_STATUS | Status | CHAR | 5 | System Generated |
| JEST | INACT | J_INACT | Indicator Status is inactive | CHAR | 1 | System Generated |
| JEST | CHGNR | J_CHGNR | Change Number | NUMC | 3 | System Generated |
Data Cleansing
All cleansing requirements dealt with in CNV-1024 Project Definition and CNV-1026 WBS - CAPEX, OPEX, Statistical
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|
Conversion Process
The high-level process is represented by the diagram below:
Data Privacy and Sensitivity
Not ApplicableExtraction
Extract data from a source into Syniti Migrate. There are 2 possibilities:
- The data exists. Syniti Migrate. connects to the source and loads the data into Syniti Migrate.. There are 3 methods:
- Perform full data extraction from relevant tables in the source system(s).
- Perform extraction through the application layer.
- Only if Syniti Migrate.; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
- The data does not exist in source system but has already been captured in a Syniti DCT.
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
Extraction Run Sheet
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| 1 | Extract data from source system based on relevancy rule | SyWay Data Team |
| 2 | Ensure DCT for CNV-1024 has been collected | SyWay Data Team |
| 3 | Perform preliminary completeness check, data quality check. | SyWay Data Team |
| 4 | Raise issues as defects if Req # 1 to 2 are not met | SyWay Data Team |
| 5 | Repeat Req # 1 to 3 if required | SyWay Data Team |
Selection Screen
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|
Data Collection Template (DCT)
No requirement for collection| Field Name | Field Description | Rule |
|---|
Extraction Dependencies
| Item # | Step Description | Team Responsible |
|---|---|---|
Transformation
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:
- Perform value mapping and data transformation rules.
- Legacy values are mapped to the to-be values (this could include a default value)
- Values are transformed according to the rules defined in
- Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation
Transformation Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Execute Load and perform Transformation | Data team |
| 2 | Monitor the transformation progress and ensure performance and completion is within allowed timeframe | Data team |
| 3 | Review and Validate Error and Preload Reports | Data Team |
| 4 | Generate data load count. | Data team |
| 5 | Generate Load Files | Data Team |
| 6 | Log errors as defects, if any and address resolutions. Close defects. | Data team |
| 7 | Re-transform and re-validate the Pre-load reports if necessary. | Data team |
| 8 | Validate the transformed file as part of pre-load validation, raise data defects or provide the pre-load sign-off. | Business |
| 9 | Analyze and resolve any pre-load defects logged by business. | Data team |
| 10 | Repeat steps 7 to 10 if necessary | Data team |
| 11 | Proceed to pre-load validations | Data team |
Transformation Rules
The transformation is done in 3 Scenarios.
Scenario 1.
Update the status of projects in S/4 in Created Status- the below transformation assumes BAPI_BUS2001_SET_STATUS or transaction CNMASSSTATUS
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| S/4 | PROJ | PSPID | Project Definition | S/4 Hana | PROJ | PSPID | Project Definition | Copy from Source | |
| S/4 Hana | JEST | STAT | Status | Default to "REL" |
Scenario 2
Update the status of WBS elements migrated through CNV-1026 where mapping exists to legacy data. The below transformation assumes BAPI_BUS2054_SET_STATUS or transaction CNMASSSTATUS
The status from legacy may be mapped to either a system or a user status in S/4 Hana
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| PF2/WP2 | PRPS | POSID | WBS Element | S/4 Hana | PRPS | PSPID | WBS Element | Mapping Table Old WBS Element to New WBS | |
| PF2/WP2 | JEST | STATUS | Status | S/4 Hana | JEST | STATUS | System Status | Mapping: Legacy_PRPS_Status where Legacy status has Hana_System_Status | |
| PF2/WP2 | JEST | STATUS | Status | S/4 Hana | JEST | USER_STATUS | User Status | Mapping: LLegacy_PRPS_Status where Legacy status has Hana_User_Status |
Scenario 3
Update the Project Definitions with Legacy ID's where for legacy data. The below transformation assumes BAPI_BUS2054_SET_STATUS or transaction CNMASSSTATUS
The status from legacy may be mapped to either a system or a user status in S/4 Hana
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| S/4 | PROJ | PSPID | Project Definition | S/4 Hana | PROJ | PSPID | Project Definition | Mapping Table Old WBS Element to New WBS | |
| PF2/WP2 | JEST | STATUS | Status | S/4 Hana | JEST | STATUS | System Status | Mapping: Legacy_PRPS_Status where Legacy status has Hana_System_Status | |
| PF2/WP2 | JEST | STATUS | Status | S/4 Hana | JEST | USER_STATUS | User Status | Mapping: LLegacy_PRPS_Status where Legacy status has Hana_User_Status |
Transformation Mapping
| Mapping Table Name | Mapping Table Description |
|---|---|
| Legacy_PRPS_Status | Mapping System and User Status from Legacy Systems to S/4 Status Source System, Object (PD or WBS), Legacy Status, Hana_System_Status, Hana_User_Status |
WBS Elements | POSID: Old WBS Elements to New WBS Elements |
Transformation Dependencies
List the steps that need to occur before transformation can commence| Item # | Step Description | Team Responsible |
|---|---|---|
Pre-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Business
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Load
The load process includes:
- Execute the automated data load into target system using load tool or product the load file if the load must be done manually
- Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation
Load Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
Load Phase and Dependencies
Configuration
| Item # | Configuration Item |
|---|---|
Conversion Objects
| Object # | Preceding Object Conversion Approach |
|---|---|
| list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram) | |
Error Handling
| Error Type | Error Description | Action Taken |
|---|---|---|
Post-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Business
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Key Assumptions
- Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
- is in scope based on data design and any exception requested by business.