You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Status

  Approved

OwnerAnil Para
Stakeholders

Purpose

The purpose of this document is to define the conversion approach for RE-FX Contract and Lease Management (CLM) master data and balances in S/4 HANA.

Group entities currently using legacy solution shall use S/4 HANA CLM for IFRS 16 Lease Accounting in SyWay. S/4 HANA CLM provides a standardized framework, single source of truth and processes for a streamlined management of lease contracts across all Syensqo group entities directly in S/4 HANA  


Conversion Scope

The scope of this document covers the approach for converting active IFRS 16 Lease Contracts from Legacy Source Systems into S/4HANA following the RE-FX Contracts Master Data Design Standard.

The data from legacy system includes:

  1. IFRS 16 Lease contracts - Lease contract master data and balances
  2. ROU Assets - Right of Use Assets and Balances
  3. Lease Liabilities - Short Term and Long Term Lease Liability Balances
  4. Accrued Lease Liability - Intermediatory Lease liability balance
  5. Business Partners - Vendor Business Partner master data with a specific RE-FX role
  6. Purchase Order - Need a further check on the Lease POs strategy?

The data from legacy system excludes:

  1. Inactive Lease Contracts
  2. Deactivated ROU Assets
  3. Lease contracts will be ended equal to go-live date


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2RE-FX Lease Contracts and ROU Assets1,781S/4 HANAWill be same as Source, unless any deactivation before Go-live
WF2RE-FX Lease Contracts and ROU Assets2,022S/4 HANAWill be same as Source, unless any deactivation before Go-live

Additional Information

Multi-language Requirement

IFRS 16 Lease Contracts will primarily be managed in English

Document Management

N/A

Legal Requirement

There are no legal requirements relevant to data migration of IFRS 16 Lease Contracts

Special Requirements




Target Design

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement
VICNCNBUKRSBUKRSCompany Code4
VICNCNRECNTYPE
Contract Type


VICNCNRECNTXT
Contract Description


VICNCNRELEVANTEVAL
Valuation Relevance


VICNCN

Purchasing Document


VICNCN

Number of Old Contract


VICNCN

Additional Identified






















































































































































Data Cleansing

IDCriticalityError Message/Report DescriptionRuleOutputSource System


























Conversion Process

The high-level process is represented by the diagram below:


Data Privacy and Sensitivity


Extraction

Extract data from a source into . There are 2 possibilities:

  1. The data exists. connects to the source and loads the data into . There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible













Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set





















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.

DCT Rules

Field NameField DescriptionRule












Extraction Dependencies

Item #Step DescriptionTeam Responsible













Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible













Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic









































Transformation Mapping

Mapping Table NameMapping Table Description








Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible













Pre-Load Validation

Project Team

Completeness

TaskAction





Accuracy

TaskAction





Business

Completeness

TaskAction





Accuracy

TaskAction





Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible













Load Phase and Dependencies

Configuration

Item #Configuration Item






Conversion Objects

Object #Preceding Object Conversion Approach

list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram)




Error Handling

Error TypeError DescriptionAction Taken










Post-Load Validation

Project Team

Completeness

TaskAction





Accuracy

TaskAction





Business

Completeness

TaskAction





Accuracy

TaskAction





Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • is in scope based on data design and any exception requested by business.


See also

Change log

Version Published Changed By Comment
CURRENT (v. 4) Apr 08, 2026 15:45 PARA-ext, Anil
v. 118 Mar 30, 2026 17:52 PARA-ext, Anil
v. 117 Feb 13, 2026 15:17 PARA-ext, Anil
v. 116 Feb 11, 2026 12:35 PARA-ext, Anil
v. 115 Dec 08, 2025 12:23 PARA-ext, Anil
v. 114 Dec 08, 2025 09:00 PARA-ext, Anil
v. 113 Dec 05, 2025 19:28 PARA-ext, Anil
v. 112 Dec 05, 2025 16:02 PARA-ext, Anil
v. 111 Dec 05, 2025 15:59 PARA-ext, Anil
v. 110 Dec 05, 2025 12:07 PARA-ext, Anil

Go to Page History

  • No labels