1. Objective and Scope

1.1. Objective of this Operation

A secondary cost element represents postings that occur between controlling objects within CO and from CO to COPA. A secondary cost element is essentially an account that exists only in the CO module, not in FI. When costs are moved (e.g., from one cost center to another using an assessment, or from a cost center to a production order), no postings are made in FI. 

The seconday cost element category is 21, 42 or 43

The codification of a secondary cost element depends on the system: 

  • In PF1 = 98xxxxxxxx
  • In WP1 = 99xxxxxx

Once the cost element is created, the update of secondary cost element is done in very limited cases. 


Exception

Certain secondary cost elements are designated for Lump Sum invoicing, each with a specific coding structure.

The codification depends on the system:

  • In PF2: 92xxxxxxxx
  • In WP2: 99422xxx

Requests related to this should be initiated by the Intercompany Team.

For more information about this process, please refer to the following link:
[Insert link to ppt about the process]

1.2. Scope

In PF2 (Controlling Area: CHEF) & WP2 (Controlling Areas: Z006, Z013, Z025, Z026 and Z028)

2. Definitions

See Finance - Glossary

3. Tasks description

3.1. I perform the secondary cost element changes


STEP 1

Start the transaction using the menu path or transaction code KA02

Double-click 



Change cost element: Initial Screen




STEP 2

Enter the code of the cost element to be updated

Click or 




STEP 3

Perform changes 

save  

A message displays that the cost element has been changed

 


3.2. I communicate a secondary cost element has been updated

I notify the requester.