STEP 1

Consult SRM Validators in cost centers with ZZR_WPUR043 

Report SRM Validators in cost centers : Initial Screen




STEP 2

It is compulsory to enter :

  1. Controlling area (=CHEF)
  2. Edit date (=the current date)

It is recommended to use other filters to avoid time-out : cost center, company code, plant code, profit center, enterprise or position

Execute 




STEP 3

The report is displayed

  1. List of cost centers
  2. Position code
  3. Description of the position 
  4. First and last name of the responsible






7 Comments

  1. Position code = HR position code ?

    1. It is a 8 digit code that starts with 5xxxxxxx, so I don't think it is the same as the HR position code. I don't know how it is generated by SRM7. 

       

  2. Hamburger, Joao, would you know who generates and how  that position code in SRM7 ?

  3. It is maintained by IS PtP team (SRM-7 support), based on requests / validations sent by authorized contacts from GBUs (usually WW Controller or delegate).


    Murielle Robert or Diane Kealy could give more details

  4. Can you please investigate: we used position instead of responsible in SRM7 to minimize maintenance of users in cost center. Why don't we use the HR position code in SRM7 ?

    1. Here is the answer I got from Diane Kealy today:

      Hello Joao,
      You are right in your statement about HR classification not being ready for SRM7 implementation.
      I believe that this is planned to move to the HR position codes but I'm not certain of the planning. Murielle knows a lot more about this than me so hopefully she will be able to give some more details.
      Best regards
      Diane

      On 23 February 2016 at 16:26, Hamburger, Joao <joao.hamburger@solvay.com> wrote:
      It was the following:
      we used position instead of responsible in SRM7 to minimize maintenance of users in cost center. Why don't we use the HR position code in SRM7 ?
      I presume that our HR classification of position was not ready when SRM7 was implemented, which led to a parallel coding system. Is that it?
      Do you think that, in the medium term it would be possible to replace the 5xxx codes by the HR position codes, having a single database? Or would there be some technical constraint for that?
      Thanks in advance,
      1. Complementing now with message from Murielle Robert:

        OBERT, Murielle
        12:06 (Há 6 minutos)

        para Diane, mim
        Hello Joao,
        Hello Diane,

        HR structure is different from SRM structure, there is no link between them.
        The SRM position code is provided by SRM tool when creating the position in the SRM structure. It can not be replaced by any other ID in SRM..

        Not sure there is a plan to move to HR position codes (or perhaps I'm not aware !).
        The project we currently have is to get changes from HR (HR system sends SRM system a file with the moves) We analyse it for the SRM users, Distribute this between all people in charge of the structure maintenance, send them a file. So they become aware of the changes that happened in their scope and they can ask for an update of the structure. The expectation is to have more up-to-date structures.

        Cordialement / Regards

        Murielle ROBERT
        SBS INFORMATION SERVICES (IS) APPLICATIONS

        IS PtP - Provisioning

         

         

        So, in short term, we will keep the current SRM-7 position code structure, without migrating to HR codes.