Status

  Approved

Owner
Stakeholders

Purpose

The purpose of this document is to define the conversion approach to create TM Schedules in S/4 HANA TM (Transportation management).

Schedules define a sequence of transportation stops such as ports, airports, or gateways, that is valid for a specific period of time. Ships, trucks, or airplanes can move goods at recurring times along the whole sequence or any part of it.

The data for TM Schedules in S/4 would need to be constructed in data collection template (DCT).

Conversion Scope

The scope of this document covers the approach for creating TM Schedules in S/4HANA following the TM Schedules Master Data Design Standard. This includes:

  • Capturing and using the TM Schedule data in data collection template (DCT).
  • Applying transformation logic via Syniti to conform with the S/4 HANA data model.
  • Loading the transformed data into SAP S/4 HANA while ensuring data integrity.

The data from legacy system includes:

  1. N/A (Manual data collection)

The data from legacy system excludes:

  1. N/A (Manual data collection)


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

DCTCreation of TM SchedulesTBDS/4 HANA (TM)TBD















Additional Information

Multi-language Requirement

Schedule description will be made available in English.

Multi language is supported for schedules (KDD055 provides guidelines on the supported languages).  Login via a different language will show the description displayed in the logon language if the language key is maintained.

Document Management

Not Applicable.

Legal Requirement

Not Applicable.

Special Requirements

Not Applicable.




Target Design

The complete information of the key fields that hold the TM Schedules information follows the Master Data Standard document.

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirementNotes
/SCMTMS/D_SCHROTSCH_IDSCH_IDSchedule IDCHAR40Mandatory
/SCMTMS/D_SCHDSCDESCRIPTIONDESCRIPTIONSchedule Description CHAR40Mandatory
/SCMTMS/D_SCHROTSCH_CATSCH_CATSchedule Category CHAR2MandatoryS=Schedule
/SCMTMS/D_SCHROTVAL_FROM_DATEVAL_FROM_DATEValid from dateNUM (DATE)15Mandatory
/SCMTMS/D_SCHROTVAL_TO_DATEVAL_TO_DATEValid to dateNUM (DATE)15Mandatory
/SCMTMS/D_SCHROTSCH_TYPESCH_TYPESchedule typeCHAR4Mandatory
/SCMTMS/D_SCHROTMOTMOT

Transportation mode code



CHAR2Mandatory
/SCMTMS/D_SCHROTPRD_TRANSP_GRPPRD_TRANSP_GRPTransportation GroupCHAR4Conditional
/SCMTMS/D_SCHROTTSP_AIRLCTSP_AIRLCAirline CodeCHAR3Conditional
/SCMTMS/D_SCHROTFLIGHT_NOFLIGHT_NOFlight NumberCHAR5Conditional
/SCMTMS/D_SCHROTAIRCRAFT_TCAIRCRAFT_TCAircraft typeCHAR3Conditional
/SCMTMS/D_SCHROTTSPTSPCarrierCHAR16Mandatory
/SCMTMS/D_SCHROTOPERATING_CARRIEROPERATING_CARRIERExecuting carrierCHAR1Conditional
/SCMTMS/D_SCHROTTSP_SCACTSP_SCACCarrier SCACCHAR4Conditional
/SCMTMS/D_SCHROTLOOP_IDLOOP_IDLoopCHAR40Conditional
/SCMTMS/D_SCHLOCLOC_SEQLOC_SEQSequenceNUM5Mandatory
/SCMTMS/D_SCHLOCLOC_TYPELOC_TYPELocation Type CodeCHAR4Mandatory
/SCMTMS/D_SCHLOCLOC_ROLELOC_ROLERole of the Location in a ScheduleCHAR2Mandatory
/SCMTMS/D_SCHLOCLOC_IDLOC_IDLocationCHAR20Mandatory
/SCMTMS/D_SCHLOCLOG_LOCIATALOG_LOCIATAInternational Air Transport Association: LocationCHAR3Conditional
/SCMTMS/D_SCHLOCTSPTSPCarrierCHAR16Conditional
/SCMTMS/D_SCHLOCTSP_SCACTSP_SCACStandard Carrier Alpha CodeCHAR4Conditional
/SCMTMS/D_SCHLOCOPERATING_CARRIEROPERATING_CARRIERExecuting Carrier of a ScheduleCHAR1Conditional
/SCMTMS/D_SCHLOCAIRCRAFT_TCAIRCRAFT_TCIATA Aircraft Type CodeCHAR3Conditional
/SCMTMS/D_SCHLOCTSP_AIRLCTSP_AIRLCIATA Airline CodeCHAR3Conditional
/SCMTMS/D_SCHLOCSERVICE_STOP_INDICATORSERVICE_STOP_INDICATORService StopCHAR1Conditional
/SCMTMS/D_SCHLOCFLIGHT_NOFLIGHT_NOFlight NumberCHAR5Conditional
/SCMTMS/D_SCHLOCREL_CARG_COREL_CARG_CORelative Cargo Cut-OffNUM11Conditional
/SCMTMS/D_SCHLOCCUT_OFF_DAYSCUT_OFF_DAYSCargo Cut-Off (Offset in Days)NUM3Conditional
/SCMTMS/D_SCHLOCCUT_OFF_TIMECUT_OFF_TIMECargo Cut-Off TimeNUMC6Conditional
/SCMTMS/D_SCHLOCREL_DOC_COREL_DOC_CORelative Document Cut-OffNUM11Conditional
/SCMTMS/D_SCHLOCDOC_CUT_OFF_DAYSDOC_CUT_OFF_DAYSDocument Cut-Off (Offset in Days)NUM3Conditional
/SCMTMS/D_SCHLOCDOC_CUT_OFF_TIMEDOC_CUT_OFF_TIMEDocument Cut-Off TimeNUMC6Conditional
/SCMTMS/D_SCHLOCREL_DG_COREL_DG_CORelative Dangerous Goods Cut-OffNUM11Conditional
/SCMTMS/D_SCHLOCDG_DOC_CUT_OFF_DDG_DOC_CUT_OFF_DDangerous Goods Documents Cut-Off (Offset in Days)NUM3Conditional
/SCMTMS/D_SCHLOCDG_DOC_CUT_OFF_TDG_DOC_CUT_OFF_TDangerous Goods Document Cut-Off TimeNUMC6Conditional
/SCMTMS/D_SCHLOCAVAIL_RELAVAIL_RELRelative Availability TimeNUM11Conditional
/SCMTMS/D_SCHLOCAVAIL_DAYSAVAIL_DAYSDays to AvailabilityNUM3Conditional
/SCMTMS/D_SCHLOCAVAIL_TIMEAVAIL_TIMEAvailability TimeNUM6Conditional
/SCMTMS/D_SCHLOCDISTANCE_KMDISTANCE_KMDistances for Schedule StagesNUM10,3Conditional
/SCMTMS/D_SCHLOCPRECISIONPRECISIONPrecision of Distance and Duration on Schedule StagesCHAR1Conditional
/SCMTMS/D_SCHLOCTRANSIT_TIMETRANSIT_TIMETransit TimeNUM11Conditional
/SCMTMS/D_SCHLOCSTAY_TIMESTAY_TIMELength of StayNUM11Conditional
/SCMTMS/D_SCHLOCMOTMOTTransportation Mode CodeCHAR2Mandatory
/SCMTMS/D_SCHLOCMTRMTRMeans of TransportCHAR10Conditional
/SCMTMS/D_SCHLOCTZONETZONETime ZoneCHAR6Mandatory
/SCMTMS/D_SCHLOCENTRY_PORTENTRY_PORTPort of EntryCHAR1Conditional
/SCMTMS/D_SCHLOCEXIT_PORTEXIT_PORTPort of ExitCHAR1Conditional
/SCMTMS/D_SCHLOCLOC_POSLOC_POSSequence PositionCHAR1Automatic
/SCMTMS/D_SCHLOCSCH_REFSCH_REFSchedule ReferenceNUM16Conditional
/SCMTMS/D_SCHLOCSTAGE_TYPESTAGE_TYPEStage TypeCHAR3Conditional
/SCMTMS/D_SCHDPRRULE_IDRULE_IDDeparture RuleNUM5Mandatory


Data Cleansing

TM Schedules data will be populated directly in the Data Collection Template (DCT).

IDCriticalityError Message/Report DescriptionRuleOutputSource System


























Conversion Process

The high-level process is represented by the diagram below:

Please note that the data may have to be loaded in multiple target systems (US instance, China instance and RoW).

Data Privacy and Sensitivity


Extraction

The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in Syniti Migrate. This is to be conducted using DCT (Data Collection Template) in Syniti Migrate.

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible
1Data is populated in the DCT or uploaded from downloaded Excel templateData owner (Business)
2If the data is uploaded to DCT in bulk via excel template, any upload errors need to be reviewed and correctedData owner (Business), Syniti/ Data Team
3The data which has passed validation checks in DCT will be used for transformation/further processingSyniti




Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set





















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for TM Schedules data with exception of some fields which require transformation as mentioned in the transformation rule.

Please refer to the below Google sheet for the DCT rules (main DCT page and another page for non English descriptions).


Field NameField DescriptionRule












Extraction Dependencies

Not applicable.

Item #Step DescriptionTeam Responsible













Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti platform to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in Syniti platform
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible
1Capture the data for TM Schedules in DCT. Review and correct any errors if bulk uploading data via downloaded excel DCT template.Business team
2Ensure the mapping tables which are needed during transformation have been reviewed and signed off by business.Business team, Data Team (SCM)
3Obtain DCT Sign-off from BusinessData Team (SCM)
4Generate Pre-Load reports Data Team (Syniti)
5Review and Validate Error and Preload ReportsData Team (SCM)
6Log errors as defects, if any and address resolutions. Data Team (SCM)
7Re-transform and re-validate the Pre-load reports if necessary.Data Team (SCM), Data Team (Syniti)
8Obtain preload validation sign-off from BusinessBusiness + Functional (SCM) + Data Team (SCM)
9Generate Load FilesData Team (Syniti)


Transformation Rules

Please check the attached file for the complete source-to-target field mapping, validation checks and proposed error messages. The validation checks list is not exhaustive and may change over time as the design and configuration of the system evolves.

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation LogicNotes
1196-001DCT


SAP S/4 HANA/SCMTMS/D_SCHROTSCH_IDSchedule IDDirect MappingWill be auto generated by SAP (the Schedule ID in DCT is for uniquely tracking the record however at the time of record creation in SAP, new number will be generated)

DCT


SAP S/4 HANA/SCMTMS/D_SCHDSCDESCRIPTIONSchedule Description Direct Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHDSCLANGUAGE_CODELanguage KeyDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHROTSCH_CATSchedule Category Direct Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHROTVAL_FROM_DATEValid from dateDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHROTVAL_TO_DATEValid to dateDirect MappingMust be later than Valid From date.

DCT


SAP S/4 HANA/SCMTMS/D_SCHROTSCH_TYPESchedule typeDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHROTMOT

Transportation mode code



Direct Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHROTPRD_TRANSP_GRPTransportation GroupDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHROTTSP_AIRLCAirline CodeDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHROTFLIGHT_NOFlight NumberDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHROTAIRCRAFT_TCAircraft typeDirect Mapping

DCTN/AzLegacySysField to capture legacy source systemSAP S/4 HANAN/AzLegacySysCarrier Source system

This will be used together with legacy vendor (carrier) in determining the new (S4) BP number



DCT


SAP S/4 HANA/SCMTMS/D_SCHROTTSPCarrier

Value mapping: Use the legacy to SAP vendor mapping table to determine the new (S4) BP number

Carrier (Business partner) should exist in SAP.


DCT


SAP S/4 HANA/SCMTMS/D_SCHROTOPERATING_CARRIERExecuting carrierDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHROTTSP_SCACCarrier SCACDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHROTLOOP_IDLoopDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCLOC_SEQSequenceDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCLOC_TYPELocation Type CodeDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCLOC_ROLERole of the Location in a ScheduleDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCLOC_IDLocation

Direct Mapping



Location should exist in SAP.

Schedule must have at least two locations (item level data)


DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCLOG_LOCIATAInternational Air Transport Association: Location

Direct Mapping



DCTN/AzLegacySysField to capture legacy source systemSAP S/4 HANAN/AzLegacySysCarrier Source system

This will be used together with legacy vendor (carrier) in determining the new (S4) BP number



DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCTSPCarrier

Value mapping: Use the legacy to SAP vendor mapping table to determine the new (S4) BP number

Carrier (Business partner) should exist in SAP.


DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCTSP_SCACStandard Carrier Alpha CodeDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCOPERATING_CARRIERExecuting Carrier of a ScheduleDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCAIRCRAFT_TCIATA Aircraft Type CodeDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCTSP_AIRLCIATA Airline CodeDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCSERVICE_STOP_INDICATORService StopDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCFLIGHT_NOFlight NumberDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCREL_CARG_CORelative Cargo Cut-OffDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCCUT_OFF_DAYSCargo Cut-Off (Offset in Days)Direct Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCCUT_OFF_TIMECargo Cut-Off TimeDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCREL_DOC_CORelative Document Cut-OffDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCDOC_CUT_OFF_DAYSDocument Cut-Off (Offset in Days)Direct Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCDOC_CUT_OFF_TIMEDocument Cut-Off TimeDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCREL_DG_CORelative Dangerous Goods Cut-OffDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCDG_DOC_CUT_OFF_DDangerous Goods Documents Cut-Off (Offset in Days)Direct Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCDG_DOC_CUT_OFF_TDangerous Goods Document Cut-Off TimeDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCAVAIL_RELRelative Availability TimeDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCAVAIL_DAYSDays to AvailabilityDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCAVAIL_TIMEAvailability TimeDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCDISTANCE_KMDistances for Schedule StagesDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCPRECISIONPrecision of Distance and Duration on Schedule StagesDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCTRANSIT_TIMETransit Time

For preload file - include all three DCT fields (days, hours and minutes)

For load file - Combine the three DCT fields (days, hours and minutes) and store in one target field (hhmmss)



DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCSTAY_TIMELength of Stay

For preload file - include all three DCT fields (days, hours and minutes)

For load file - Combine the three DCT fields (days, hours and minutes) and store in one target field (hhmmss)



DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCMOTTransportation Mode CodeDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCMTRMeans of TransportDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCTZONETime ZoneDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCENTRY_PORTPort of EntryDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCEXIT_PORTPort of ExitDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCSCH_REFSchedule ReferenceDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHLOCSTAGE_TYPEStage TypeDirect Mapping

DCT


SAP S/4 HANA/SCMTMS/D_SCHDPRRULE_IDDeparture RuleDirect Mapping






















List of Custom Target Reports for this object is maintained here: Conversion Specification - Custom Reports Register.

Transformation Mapping

Field NameMapping Table NameMapping Table Description
TSPVendor NumberLIFNR: Old Vendor Code to New Vendor Code cross reference









Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible
1Dependent Master Data records for Locations and Carriers (business partners) are loadedFunctional Team (SCM) + Data Team (SCM)
2Value Mappings are according to the latest designFunctional Team (SCM) + Data Team (SCM)
3SAP Transportation management configuration for Schedules is completeFunctional Team (SCM) + Data Team (SCM)
4Ensure DCT tables completenessData Team (SCM)


Pre-Load Validation

Project Team

Completeness

TaskAction
Check ValuesValidate the pre-load data confirming the values are aligned with target system format
Validate template structure and required field populationEnsure mandatory fields like Schedule ID, Description, Schedule category, MOT, Locations, validity dates are filled
Verify Record Count

SCM Data Team to verify that the total number of relevant records from the  DCT is equal to the total number of records in the Preload and Load Sheets.


Accuracy

TaskAction
Conversion Accuracy

SCM Data Team to verify that all fields below meet pass the checks:

  1. Mandatory Fields
  2. Field and Value Mapping Correctness
  3. Null Checks
  4. Text Length Checks
Perform format validation (date, currency, decimal separators)

Standardize format to match SAP accepted input (e.g., YYYYMMDD for dates)

Review Error ReportsReview and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data.
Conduct dry runs using LTMC or BAPIs and review logsAnalyze load results and correct format or conversion errors

Business

Completeness

TaskAction
Provide relevant dataBusiness Data Owners to provide the required data in DCT which will be used in transportation planning and execution processes
Verify Record CountBusiness Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload validation file.





Accuracy

TaskAction
Conversion Accuracy

Business Data Owner/s to verify that all the data in the preload validation file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data).

Review error reports in tool for any mismatch or missing transformed values.






Load

The load process includes:

  1. Execute the automated data load into target system using load tool or produce the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation with side by side check of each fields in scope of the objects with fields to be displayed as XXXX_DCT, XXXX_S4HANA, XXXX_MATCH ( As TRUE or FALSE) with an additional column denoting fields not matching and status of loading in S/4HANA as LOADED_IN_S4HANA ( As TRUE or FALSE) 

The following options will need to be explored during data migration build to select the best possible solution: 

i) via import from Microsoft Excel using the report /SCMTMS/SCH_UPLOAD or

ii)Function_Loader_Inlay program or

iii) Custom Migration Cockpit Object (LTMOM).

The load file format can be finalized when development system is available.

BAPI: /SCMTMS/BAPI_SCHEDULE_SAVEMULT

Load Run Sheet

Item #Step DescriptionTeam Responsible
1

Ensure the load tools are transported into the correct system/instance.

Data Team (SCM)
2Ensure Pre-load sign-offs are obtained.Data Team (SCM)
3Execute upload of TM Schedules using Function_Loader_Inlay program or Custom Migration Cockpit Object.Data Team (SCM)
4Validate few records loaded by accessing standard transactions from S/4HNA E.g. Fiori app 'Display Schedule'.Data Team (SCM)
5

Generate the post load reports in tool.

The following fields should be used to form a key for postload comparison:

/SCMTMS/D_SCHROT-SCH_CAT
/SCMTMS/D_SCHROT-SCH_TYPE
/SCMTMS/D_SCHROT-VAL_FROM_DATE
/SCMTMS/D_SCHROT-VAL_TO_DATE
/SCMTMS/D_SCHDSC-LANGUAGE_CODE
/SCMTMS/D_SCHDSC-DESCRIPTION

Data Team (SCM), Data Team (Syniti)
6Log errors as defects, if any and address resolutions. Close defects.Data Team (SCM)
7Resolve defects by reupload and re-generate post load reports if necessary.Data Team (SCM), Data Team (Syniti)
8Business to validate the post load files as part of post-load validation, raise data defects or provide the post-load sign-off.Business team
9Repeat steps 5 to 7 if necessary.Data Team (SCM), Data Team (Syniti)


Load Phase and Dependencies

TM Schedules data will be loaded in the pre-cutover window.

Configuration

Item #Configuration Item
1

SAP Transportation management configuration

MOT (Table & field: TVTR-VKTRA)

Stage types (Table & field: /SCMTMS/C_STGTY-STAGE_TYPE)

Schedule type (Table & field: /SCMTMS/C_SCHTY-TYPE (where CAT = S))

Aircraft type (Table & field: /SCMTMS/C_AIRCR-AIRCRAFTCODE)

2T002 - Language Keys
3Number range for schedules

Conversion Objects

Object #Preceding Object Conversion Approach
1051TM - Locations
3016Business Partners - Transporters/Forwarders


Error Handling

As part of the TM Schedules data load to S/4HANA  using the Syniti data migration tool, various data quality, configuration, and technical challenges may arise.

The following table outlines the most commonly observed error types during data load, and the corrective actions typically taken to resolve them. This helps ensure consistency in issue handling, improves traceability during cutover, and supports smooth end-to-end execution of the TM Schedules load.

Error TypeError DescriptionAction Taken
ConfigurationInvalid or missing MOT, Stage types, Schedule typeEngage Functional team to expedite and fix the error in the system
Formatting ErrorsOne or more key fields (e.g., TSP) are incorrectly formattedEnsure formatting is done correctly (e.g., leading zeros for TSP). (Leading zero requirement will be confirmed when loading tool is available/tested)
Authorization ErrorsLack of access to execute load in target client/systemRaised access request; obtained necessary authorizations
Transformation MissRequired transformation logic not applied before loadRe-applied transformation rules and revalidated source-target mapping
Technical Load FailureFile not processed due to syntax/format error or system issueReviewed logs; regenerated file; re-executed load after resolving issue


Post-Load Validation

Project Team

Completeness

TaskAction
Run Fiori app/tcode to check loaded data in SAPRun Fiori app 'Display Schedule' to check if data has been loaded 
Compare uploaded data against source file valuesUse Custom reconciliation tools e.g. SQL Server or Excel based comparison tools to validate the number of records loaded against the load file record volume
Check for load errors in load toolReview custom load tool or Legacy Transfer Migration Cockpit LTMC logs for any failures

Accuracy

TaskAction
Compare uploaded data against source file valuesUse automated postload validation report or standard reports from S/4 HANA to validate field by field value match across all loaded records





Business

Completeness

TaskAction
Verify CountDownload Postload validation reports from Syniti and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file.
Review loaded TM SchedulesAccess the S/4HANA system (via Fiori app Display Schedule) to view loaded TM Schedules



Accuracy

TaskAction
Compare Against Approved Load FileCross-check data in S/4HANA against the final business-approved load file used for migration
Validate Accuracy of Converted/Transformed DataReview any transformed fields (e.g., business partner number) for correctness
Log and Report DiscrepanciesUse provided discrepancy log format or defect management tool to report any findings


Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • TM Schedules is in scope based on data design and any exception requested by business.
  • Data entries in DCT are target-ready data unless a specific transformation rule is stated for that field in the transformation rules.
  • The list of validation checks in transformation section is not exhaustive and may change over time as the design and configuration of the system evolves.


See also

Change log

Version Published Changed By Comment
CURRENT (v. 21) Dec 10, 2025 20:22 OMER-ext, Mohammed Added fields for departure rules section following functional deep dive session (Jira # PDM-1023)
v. 21 Oct 28, 2025 11:27 OMER-ext, Mohammed Transportation group, Transit time, Port of Entry/Exit will become conditional fields based on latest advice from functional team.
v. 20 Oct 28, 2025 09:51 VAN OS-ext, Nico
v. 19 Oct 20, 2025 17:01 OMER-ext, Mohammed Field status in target design section following some clarifications from TM functional team
v. 18 Oct 17, 2025 12:52 OMER-ext, Mohammed
v. 17 Oct 16, 2025 14:00 OMER-ext, Mohammed
v. 16 Oct 16, 2025 13:54 OMER-ext, Mohammed
v. 15 Oct 14, 2025 11:26 OMER-ext, Mohammed
v. 14 Oct 14, 2025 10:14 OMER-ext, Mohammed
v. 13 Oct 14, 2025 09:59 OMER-ext, Mohammed

Go to Page History