For Functional information about the "Adminsitrative Scheduling LT", please refer to: Administrative Scheduling LT
Administrative Scheduling LT in DynaSys
Administrative Scheduling LT: It’s the administrative time to schedule Production operations, it depends on multiple factors and should be the max between: Meetings frequency, Prod Campaign frequency, Fixed/frozen horizon MF50
> By default equal to 3 for FG and Intermediates (0 for Raw Material), based on “Val Class for P&I”.
> It’s used in the formula to calculate SHS RLT of a Material.
Note: Users can override the initial value proposed (either one by one or via a Mass upload). For Mass upload, please see this section Export/Import via Excel
The best way to get IT support is to use the new
Service One Platform.
