Page tree

2021 - APRIL RELEASE

Prio #Topic

User story

Main actions

Status

Comments

JIRA Link
1Degroup CatecholRemove the Degroup catechol in order to follow where exactly is the constraint
  • Duplicate the routine from Rhovanil
  • Test
  • Documentation
Available in PROD

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

2Degroup HQ in SFSRemove the Degroup HQ in order to follow where exactly is the constraint
  • Duplicate the routine from Rhovanil
  • Test
  • Documentation
Available in PROD

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

3Miniloop HydroquinonePossibility to run quickly the new Demand & Production planning scenario for the product family so that I can simulate and look at consequences as fast as possible.
  • Same routine than precedent mini loop
Available in PROD

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

4Production

Rhovanil production by campaign in BTR - Priority order

  • Review of filters
  • Separation of Degroup calculation Rhovanil & Rhodiarome NA
  • Adaptation of the sequence
Available in PRODTo be validated by PA

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

5ProductionIssue on the full loop without Degroup: PMP unit running at 80% while forced production rate is 100%.
  • Addition in the full loop of a calculation related to the new simulation of the HQ << PMP
  • Deletion of a calculation no more useful after the removal of the HQ group <PMP
Available in PRODTo be validated by PA

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

6Flows

No more consider External Purchase order from SAP as an Stock Input

  • Removal of "External PO from SAP" from the calculation " "External inventory variations"
Available in PRODTo be validated by PA

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

7ProductionThe production plan was not correct for a campaign product.
  • Create a filter on the calculation" AP - Actuals prod with op set "
  • Remove manual selection
Available in PROD

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

8Screen DesignCreate a start screen with Technical Views
  • Creation of the screen
Available in PROD

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

9DRP

Maximum anticipation clean up for DRP

  • Move the default value to 0
Available in PROD

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

10Safety StockSee possibilty to integrate in the Demand GLOBAL BALANCE the needs of production required to build the safety stock on the current month.
  • Create new DF
  • Create new calculation 
Available in PRODTo be validated by PA

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

11Screen DesignScreen Design Adjustment 
  • Modification of the views & grap
Available in PRODTo be validated by PA

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

2021- JANUARY Release

Prio #Topic

User story

Main actions

Status

Comments

JIRA Link
1Safety stock overridePossibility to override the safety stock and then reset this override after the S&OP validation
  • Modelization of a new DF and tests
Available in PRODTo be validated by PA (February)

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

2Degroup & Mini Loop IBCH

Remove the Degroup IBCH in order to follow where exactly is the constraint

  • Duplicate the routine from Rhovanil
  • Test
  • Documentation

Available in PROD


Unable to locate Jira server for this macro. It may be due to Application Link configuration.

3Degroup PMP BHA

Remove the Degroup PMP BHA  in order to follow where exactly is the constraint

  • Duplicate the routine from Rhovanil
  • Test
  • Documentation
Available in PRODTo be validated by PA (February)

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

4Mini Loop PMP BHA PMP BHA mini loop available in order to make adjustments and check impacts directly in this product
  • Same routine than precedent mini loop
Available in PRODTo be validated by PA (February)

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

5Degroup PTZ

Remove the Degroup PTZ  in order to follow where exactly is the constraint

  • Same routine than precedent mini loop
Available in PRODClosed

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

6Mini Loop PTZ PTZ mini loop available in order to make adjustments and check impacts directly in this product
  • Same routine than precedent mini loop
Available in PRODClosed

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

7SKU with Forecasts not existingCreate an alert for SKU shipping configured as a sourcing for a a shipto with forecasts but mentioned as deactivate / End of life in the data management 
Available in PRODTo be validated by PA (February)

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

2020 - DECEMBER Releases

Prio #Topic

User story

Main actions

Status

Completed

Comments

JIRA Link
1Degroup & Mini Loop IBCH

Remove the Degroup IBCH in order to follow where exactly is the constraint

  • Duplicate the routine from Rhovanil
  • Test
  • Documentation

Available in PROD

No

To be validated by Paul Antoine

DIPDCME-408 - Authenticate to see issue details

2Degroup

Remove the Degroup PMP BHA  in order to follow where exactly is the constraint

  • Duplicate the routine from Rhovanil
  • Test
  • Documentation
Available in PRODNo


DIPDCME-438 to see issue details
3Mini LoopPMP BHA mini loop available in order to make adjustments and check impacts directly in this product
  • Same routine than precedent mini loop
Available in PRODNoTest of 14/12 Dynasys was not serving all the bha needed following a downward forcing of a transfer of bha from catenoy to Saint-Fons when the resource was not saturated. "DIPDCME-438 to see issue details
4Degroup

Remove the Degroup PTZ  in order to follow where exactly is the constraint

  • Same routine than precedent mini loop
Available in PRODNoTo be validated by Paul Antoine

DIPDCME-427 - Authenticate to see issue details

5Mini LoopPTZ mini loop available in order to make adjustments and check impacts directly in this product
  • Same routine than precedent mini loop
Available in PRODNoTo be validated by Paul Antoine

DIPDCME-427 - Authenticate to see issue details


2020 - NOVEMBER Releases


Prio #Topic

User story

Main actions

Status

Comments

JIRA Link
1Minimum Inventory

Having visibility of gaps between a minimum inventory (managed as safety stock) and projected inventory

  • Validation from PA => OK
  • Screen cleaning
  • Wiki Doc

Available in PROD

To be unplugged

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

2Degroup

Remove the Degroup Rhovanil  in order to follow where exactly is the constraint

  • Validation from PA
  • Wiki Doc

Available in PROD

We keep the Degroup in BTR due to campaign consumption 

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

3Mini Loop

Rhovanil mini loop available in order to make adjustments (Demand, prod settings,...)  and check impacts directly in this product

  • Validation from PA
  • Wiki Doc

Available in PROD

Around 3min to run

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

4Global Balance

Improve the Global Balance to be useful before adjust planning by product group

  • Adjust the current month with only remaining quantities
  • Extra capacity (available) to be re-worked by taking the ADC of the selected product
  • Transfert (integrates code change from other site)

Available in PROD

In prod on Monday 9th

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

5Degroup

Remove the Degroup GAIACOL  in order to follow where exactly is the constraint

  • Duplicate the routine from Rhovanil
  • Test
  • Documentation

Available in PROD

In Prod on Friday 27th

Unable to locate Jira server for this macro. It may be due to Application Link configuration.

6Mini Loop

GAIACOL mini loop available in order to make adjustments and check impacts directly in this product

  • Duplicate the routine from Rhovanil
  • Test
  • Documentation

Available in PROD

In Prod on Friday 27th

Unable to locate Jira server for this macro. It may be due to Application Link configuration.


The best way to get IT support is to use the new Service One Platform.