- Created by Marie-Line Ardito, last modified by Li Lian Cheong on Jul 20, 2017

KPI Owner
Pierre Boyer
Process Manager RtR
D&PS Expert
Marie-Line Ardito
General Description |
|---|
The Key Closing Steps reported represent key intermediate Steps in the monthly closing. They are split by range of time (= status) : Early or On Time, Late and Not Available
Closing steps based on SC Time: |
| Calculation | |
|---|---|
On Time or Early | Status if the closing step was performed within 15 minutes of the target time in the global calendar |
Late | Status if the closing step was performed more than 15 minutes after the target time in the global calendar |
Not Avalaible | In most cases, not available means that the closing step is not following the standard process and performed inside Schedule Manager. In some instances, this status means we are waiting some development before it will be available. In these cases, there will be comments provided |
Sources |
|
|---|---|
QV source | Manual File (from Primary Schedule Manager - SAP with the exception of BOIC Freeze which is from a BOIC report and BFC Package Balanced from a Salesforce Report) |
Refresh frequency | Monthly (16th of each month) |
Specific Dimensions |
|---|
|
Scope |
|---|
|
Not able to find the solution? Contact SBS Support.
Page
viewed times