Percentage Progress | Vectors (Formerly: SP Percentage progress bar)
backgroundColor0052CC
percentage10100

OwnerVIDWANS-ext, Sauradh 
Stakeholders

Purpose

The purpose of this document is to define the conversion approach to create Facilities Transactions in S/4 HANA.

Facilities are borrowing arrangements with either one or multiple banks. If we have a long term borrowing facility with one bank its called as Bi-Lateral Facility. Under this facility you, can define the fund requirements and the Bank will ear mark these funds to be drawn at a certain interval. If this facility is with multiple banks its called as Syndicate Facility. In a Syndicate there is normally a Lead Banker who will arrange the lending commitment from other lenders and will also have a Lead Banker charges.

These instruments are created under a certain Product Type (Instrument Number) and a Transaction Type (Kind of action i.e. buying or selling) against a counterparty (BP Number) in a Company Code.

Conversion Scope

The scope of this document covers the approach for converting active Facilities from Legacy Source System (Quantum) into S/4HANA.

The relevancy criteria is not applicable for this object as the relevant data will be provided by business in a DCT (Data Collection Template).

List of source systems and approximate number of records


SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

Quantum

Live Commercial Paper Facilities Contracts

100 <TBC>

S4HANA

100 <TBC>

Additional Information

Multi-language Requirement

Document Management

Legal Requirement

Special Requirements


As the conversion involves a source system which is non-SAP, the below area needs special handling:

  1. Extraction of CP data Facilities data from source system i.e. Quantum is to be done manually
  2. Cleansing by business team in the source system (Quantum) to ensure that only active and in use records for CP’s Facilities are provided in DCT
  3. The extracted records to be converted into a DCT and stored in the Syniti for Transformation
  4. Below Configuration Check Tables needs to be referenced in Syniti to validate the data in the DCT:
    1. Counterparty to Business Partner - BUT100
    2. Company Code - T001
    3. Product Type - TZPA
    4. Transaction Type -  AT10
    5. Trader - TZDEA
    6. Portfolio Code - TWPOB  
    7. General Valuation Class - TRGC_COM_VALCL
    8. Interest Calculation Method - Custom Check Table with Value Fields given in the below CNV
  5. Amount and date format from source system to align with S4HANA 
  6. As the target structure in S4HANA involves dependency on various Configuration and BP Master Data objects (CNV 3040), all this data needs to be loaded before Transactions Data loads.


Custom Check Tables for Interest Calculation Method, Frequency and Update Rule are as under:

Interest Calculation Method:

Interest Calculation Method

Text

1

360E/360

B

360E/365

L

360/360 (German)

F

360/360 (ISDA)

H

360/365 (ISDA)

7

360/360

2

act/360

E

act/364

3

act/365

R

act/365.25

4

act/366

M

act/365P

5

act/actP (ICMA)

6

act/actY (ISDA)

G

act/actE (AFB)

Q

act/actEP (AFB)

N

act/365L

S

act/365Y

A

actW/252

D

365/360

C

365/365

I

360E/actY

8

30.42E/360

9

*365.25/360

P

01-01-2026

J

m+act/360

K

m+30/360

0

Not Specified

T

act/act[M]

U

actW/actW[M]


Update Rule:

Rule NumberText
0Pro Rata Temporis
1Include Fully
2Do Not Include


Frequency:

1

At End of Term

5

On First Day of Month

2

On Last Day of Month

3

Monthly

4

Daily

0

Manual Input


BP Number 

BP NumberBP Name
0000000001TEST





Target Design


For a Transaction Load DCT, since there are no standard LTMC objects that we can use for loading this data, we will be using BAPI’s for this purpose. In a BAPI there are multiple fields, off which all are not necessary to be utilized as part of DCT.

In this section, we will see the full list of fields that are part of the DCT. This section will also explain field by field mapping of the DCT structure and where the data will come from for each field.

The technical design of the target for this conversion approach.

Table NameFieldField DescriptionData TypeLengthRequirement
Utility Field
(VTBFHA)
BUKRSCOMPANY_CODE
ZSTDTINCLCalculation Period: Start Inclusive vs. End InclusiveCHAR
4
1This is a Required Field
Utility Field
(VTBFHA)
SGSARTPRODUCT_TYPECHAR3This is a Required FieldVTBFHASFHAARTTRANSACTION_TYPECHAR3This is a Required FieldVTBFHAKONTRHPARTNERCHAR10This is a Required FieldVTBFHADBLFZCONTRACT_DATEDATS8This is a Required FieldVTBFHAZURDEALERTRADERCHAR12This is Optional Field
ZCALCMETHCalculation method for first period of condition itemNUMC1This is Optional Field
Utility Field
(VTBFHA)
ZCALCENDCalculation method for last period of condition itemNUMC1This is Optional Field
Utility Field
(VTBFHA)
ZINTCALCMETInterest Calculation MethodCHAR1This is Optional Field
Utility Field
(VTBFHA)
ZUPDATERULEUpdate for Calculation/Due Date for InterestNUMC2This is Optional Field
Utility Field
(VTBFHA)
ZINCLINDInclusive Indicator for Calculation DateCHAR1This is Optional Field
Utility Field
(VTBFHA)
ZMENDINDIMonth-End Indicator for Calculation DateCHAR1
VTBFHARPORTBPORTFOLIOCHAR10
This is Optional Field
Utility Field
(VTBFHA)
ZUONDASSIGNMENT
ZMENDINDIRMonth-End Indicator for Due DateCHAR
18
1This is Optional Field
VTBFHAZUNORDEXTEXTERNAL_REFERENCE
Utility Field
(VTBFHA)
ZDUEDATEINDIShift Due Date Back to End of TermCHAR
16
1This is Optional Field
VTBFHA
REFER
BUKRS
INTERNAL
COMPANY_
REFERENCE
CODECHAR
16
4This is
Optional
a Required Field
VTBFHA
MERKM
RFHA
CHARACTERISTICS
TRANSACTION NUMBERCHAR
25
13This is
a Required
Internal Field
VTBFHA
TPM_COM_VAL_CLASSVALUATION_CLASSNUMC
SGSARTPRODUCT_TYPECHAR3
4
This is a Required Field
VTBFHA
DBLFZTerm StartDATS8
SFHAARTTRANSACTION_TYPECHAR3This is a Required Field
VTBFHA
DELFZ
KONTRH
Term End
PARTNER
DATS
CHAR
8
10This is a Required Field
NA
VTBFHA
NA
RPORTBPORTFOLIO
Calculation Period: Start Inclusive vs. End Inclusive
CHAR
1
10This is
a Required
Optional Field
VTBFHA
WGSCHFT
ZUOND
Transaction Currency
ASSIGNMENT
CUKY
CHAR
5
18This is
a Required
Optional Field
VTB_ASGN_LIMITLIMIT_DATEFTR Assignment Management: Limit DateDATS8This is a Required FieldVTB_ASGN_LIMITLIMIT_CHG_AMOUNTFTR Assignment Management: Drawing AmountCURR17
VTBFHAREFERINTERNAL_REFERENCECHAR16This is Optional Field
VTBFHAMERKMCHARACTERISTICSCHAR25This is a Required Field
VTBFHARCOMVALCLVALUATION_CLASSNUMC4This is a Required Field
VTB_ASGN_LIMITLIMIT_CURRENCYFTR Assignment Management: Limit CurrencyCUKY
VTBFHADBLFZTerm StartDATS8
5
This is a Required Field
VTB_ASGN_LIMITLIMIT_POS_AMOUNTFTR Assignment Management: Drawing Amount (BAPI)DEC
VTBFHADELFZTerm EndDATS8
23
This is a Required Field
VTBFINKO
VTBFHA
SRHYTHM
WGSCHFT
Frequency
Transaction Currency
NUMC
CUKY
3
5This is
Optional
a Required Field
VTBFINKOAMMRHY OR ATTRHY
 (Pick any field that has a value. If the Frequency Indicator is set to Months, then AMMRHY will have a value. If Frequency Indicator is set to Days then ATTRHY will have a value.Unit for FrequencyNUMC1This is Optional FieldVTBFHAPOPKONDPercentage rate for condition itemsDEC10This is Optional FieldNANACalculation method for first period of condition itemNUMC1This is Optional FieldNANACalculation method for last period of condition itemNUMC1This is Optional FieldNANAInterest Calculation MethodCHAR1This is Optional FieldVTBFHAPOSKALIDWTInterest CalendarCHAR2This is Optional FieldNANAUpdate for Calculation/Due Date for InterestNUMC2This is Optional FieldVTBFHAPODVALUTCalculation DateDATS8This is Optional FieldNANAInclusive Indicator for Calculation DateCHAR1This is Optional FieldNANAMonth-End Indicator for Calculation DateCHAR1This is Optional FieldVTBFINKOSVWERKWorking Day Shift for Calculation DayNUMC1This is Optional Field

Utility Field

(VTB_ASGN_LIMIT)

ZBUKRSCOMPANY_CODECHAR4This is a Required Field

Utility Field

(VTB_ASGN_LIMIT)

ZRFHATRANSACTION NUMBERCHAR13This is Internal Field
VTB_ASGN_LIMITRELAT_OBJFTR Assignment Management: Assignment ObjectCHAR22This is Internal Field
VTB_ASGN_LIMITRELAT_OBJ_CATFTR Assignment Management: Category of Assignment ObjectCHAR3This is Internal Field
VTB_ASGN_LIMITLIMIT_DATEFTR Assignment Management: Limit DateDATS8This is a Required Field
VTB_ASGN_LIMITLIMIT_CHG_AMOUNTFTR Assignment Management: Drawing AmountCURR17,2This is a Required Field
VTB_ASGN_LIMITLIMIT_CURRENCYFTR Assignment Management: Limit CurrencyCUKY5This is a Required Field
VTB_ASGN_LIMITLIMIT_POS_AMOUNTFTR Assignment Management: Drawing Amount (BAPI)DEC23This is a Required Field
VTBFHAPOBUKRSCOMPANY_CODECHAR4This is a Required Field
VTBFHAPORFHATRANSACTION NUMBERCHAR13This is Internal Field
VTBFHAPORFHAZUTransaction ActivityNUMC5This is Internal Field
VTBFHAPODCRDATENTERED ON
VTBFINKODFAELLDue date
DATS8This is
Optional
Internal Field
NANAMonth-End Indicator for Due DateCHAR1This is Optional Field
VTBFHAPOTCRTIMENTRY TIMETIMS6This is Internal Field
VTBFHAPORFHAZBTRANSACTION FLOWNUMC4This is Internal Field
VTBFHAPOPKONDPercentage rate for condition itemsDEC10, 7
VTBFINKOSFWERKWorking Day Shift for Due DateNUMC1
This is Optional Field
NA
VTBFHAPO
NA
SKALIDWTInterest Calendar
Shift Due Date Back to End of Term
CHAR
1
2This is Optional Field

There are 5 main tables in consideration here. 

  1. VTBFHA
  2. VTBFHAPO
  3. VTBFINKO
  4. VTB_ASGN_LIMIT
  5. VTBFHAZU

The reference between the tables is a combination of Company Code and Transaction Number. This is the Primary Key to join these tables. 

In Addition to this, the field "Characteristics" will have the Legacy Quantum Deal Number. This will form a linkage between Deals loaded in the system vs Quantum deals. 

In the above table we saw fields in the DCT. Now we will check the fields in the BAPI and the data logic how it will correspond to the DCT.

Data Cleansing

For the Object 9113 – Treasury Facilities no specific data cleansing is applicable due to below reasons/assumptions:

  1. The Source System is Quantum and therefore it will be a manual extract of relevant data in a DCT form

Data- Pre Load Validation Report

However, for the purpose of the object 9113 – Treasury Facilities, below validations reports should be available in Syniti so that the data as provided in DCT is validated before generating the pre-load file. 

IDCriticalityError Message/Report DescriptionRuleOutput
1HighCompany Code is validCheck if BUKRS is valid as per Company Codes created in the system in Table T001Invalid Company Code
1HighPRODUCT_TYPECheck if VVSART is valid as per Product Types created in the system in Table TZPA.
Value for Facility Product Type is “CPF” or "BLT". If this is not, then the validation should fail. 
Invalid Product Type
1HighTRANSACTION_TYPECheck if SFHAART is valid as per Transaction Types created in the system in Table AT10Invalid Transaction Type
1HighPARTNERCheck if KUNNR is valid as per Business Partners created in the system under CNV 3040 Business Partner CounterpartyInvalid Partner
1HighCONTRACT_DATECheck if DVTRAB is valid in YYYYMMDD Format and is < or = Load DateContract Date greater than Load Date
1HighVALUATION_CLASSCheck if TPM_COM_VAL_CLASS is valid as per Company Codes created in the system in Table TRGC_COM_VALCLInvalid Valuation Class
1HighTERM STARTCheck if DBLFZ is valid in YYYYMMDD Format and is < or = Contract DateTerm Start greater than or equal to Contract Date
1HighTERM ENDCheck if DELFZ is valid in YYYYMMDD Format and is < Start DateTerm End greater than Term Start

Apart from the above, a custom report is required to be created for this. The report needs to have row reference for each Interest Rate Instrument loaded under this CNY and display the standard BAPI return messages successful as well as failed. This will make sure all the deposits successfully pass all checks. An additional check is needed if

  • All dates loaded are correctly transformed into the deals created
  • Payment Details are not going blank and if yes, the BAPI will return a warning for the same. If this warning appears, it will signify the BP Master Maintenance has been missed. Such records must fail and the maintenance needs to be done at the BP Master.
VTBFHAPODVALUTCalculation DateDATS8This is Optional Field
VTBFHAZUBUKRSCOMPANY_CODECHAR4This is a Required Field
VTBFHAZURFHATRANSACTION NUMBERCHAR13This is Internal Field
VTBFHAZURFHAZUTRANSACTION ACTIVITYNUMC5This is Internal Field
VTBFHAZUNORDEXTEXTERNAL_REFERENCECHAR16This is Optional Field
VTBFHAZUDVTRABCONTRACT_DATEDATS8This is a Required Field
VTBFINKOBUKRSCOMPANY_CODECHAR4This is a Required Field
VTBFINKORFHATRANSACTION NUMBERCHAR13This is Internal Field
VTBFINKORGATTCLASSCHAR13This is Internal Field
VTBFINKORFHAZUTransaction ActivityNUMC5This is Internal Field
VTBFINKORKONDGRDIRECTION OF TRANSACTIONNUMC1This is Internal Field
VTBFINKORKONDCONDITIONNUMC4This is Internal Field
VTBFINKODGUEL_KPCONDITION ITEM EFFECTIVE FROMDATS8This is Internal Field
VTBFINKONSTUFELEVEL NUMBER OF CONDITION ITEMS FOR RECURRING PAYMENTNUMC2This is Internal Field
VTBFINKOSRHYTHMFrequencyNUMC3This is Optional Field
VTBFINKOAMMRHYDefined Frequency in MonthsNUMC3This is a Optional Field
VTBFINKOATTRHYDefined Frequency in DaysNUMC3This is a Optional Field
VTBFINKOSVWERKWorking Day Shift for Calculation DayNUMC1This is Optional Field
VTBFINKODFAELLDue dateDATS8This is Optional Field
VTBFINKOSFWERKWorking Day Shift for Due DateNUMC1This is Optional Field


There are 5 main tables in consideration here. 

  1. VTBFHA
  2. VTBFHAPO
  3. VTBFINKO
  4. VTB_ASGN_LIMIT
  5. VTBFHAZU

The reference between the tables is a combination of Company Code and Transaction Number. This is the Primary Key to join these tables. 

In Addition to this, the field "Characteristics" will have the Legacy Quantum Deal Number. This will form a linkage between Deals loaded in the system vs Quantum deals. 

In the above table we saw fields in the DCT. Now we will check the fields in the BAPI and the data logic how it will correspond to the DCT.


Data Cleansing

For the Object 9113 – Treasury Facilities no specific data cleansing is applicable due to below reasons/assumptions:

  1. The Source System is Quantum and therefore it will be a manual extract of relevant data in a DCT form


Data- Pre Load Validation Report

However, for the purpose of the object 9113 – Treasury Facilities, below validations reports should be available in Syniti so that the data as provided in DCT is validated before generating the pre-load file. 


IDCriticalityError Message/Report DescriptionRuleOutput
1HighCompany Code is validCheck if BUKRS is valid as per Company Codes created in the system in Table T001Invalid Company Code
1HighPRODUCT_TYPECheck if VVSART is valid as per Product Types created in the system in Table TZPA.
Value for Facility Product Type is “CPF” or "BLT". If this is not, then the validation should fail. 
Invalid Product Type
1HighTRANSACTION_TYPECheck if SFHAART is valid as per Transaction Types created in the system in Table AT10Invalid Transaction Type
1HighPARTNERCheck if KUNNR is valid as per Business Partners created in the system under CNV 3040 Business Partner CounterpartyInvalid Partner
1HighCONTRACT_DATECheck if DVTRAB is valid in YYYYMMDD Format and is < or = Load DateContract Date greater than Load Date
1HighVALUATION_CLASSCheck if TPM_COM_VAL_CLASS is valid as per Company Codes created in the system in Table TRGC_COM_VALCLInvalid Valuation Class
1HighTERM STARTCheck if DBLFZ is valid in YYYYMMDD Format and is < or = Contract DateTerm Start greater than or equal to Contract Date
1HighTERM ENDCheck if DELFZ is valid in YYYYMMDD Format and is < Start DateTerm End greater than Term Start
1HighAMMRHY & ATTRHYEither of the fields should have a value populatedInterest Payment Duration is Blank


Apart from the above, a custom report is required to be created for this. The report needs to have row reference for each Interest Rate Instrument loaded under this CNY and display the standard BAPI return messages successful as well as failed. This will make sure all the deposits successfully pass all checks. An additional check is needed if

  • All dates loaded are correctly transformed into the deals created
  • Payment Details are not going blank and if yes, the BAPI will return a warning for the same. If this warning appears, it will signify the BP Master Maintenance has been missed. Such records must fail and the maintenance needs to be done at the BP Master.

Conversion Process

The generic high-level process steps for the conversion are as below:

  1. Extraction:
    1. Extract from the source systems: Apply the selection parameters and data relevancy as mentioned in this specification, from the relevant tables
    2. DCT: The DCT to be prepared if the data to be transformed and is part of the load file is not available in the Source system
  2. Transform 
    1. Transform fields by applying the fields and value mapping in the Syniti 
    2. Generate and validate Pre-load files
  3. Load
    1. Load the validated Pre-load file using SAP's LTMC or the custom upload program as applicable. 

However, with respect to object 9113- Treasury Facilities DCT will be used for transformation and generation of the pre-load file. 


Data Privacy and Sensitivity

Not Applicable


Extraction

Extract data from a source into . There are 2 possibilities:

  1. The data exists. connects to the source and loads the data into . There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible

01

Extract from relevant tables/reports from Quantum all relevant information required to populate the DCT for Interest Rate Instruments for relevant Company Codes.

This extraction is dependent on the extraction, validation and load of Master Data Object CNV 3040 BP Master. It is also dependent on completion of configuration for items like Company Code, Product Type, Transaction Type, Portfolio Codes, General Valuation Class. 

Business


Selection Screen

Not applicable as the extraction is manual activity to be performed by business in Quantum system.


Data Collection Template (DCT)

Target Ready Data Collection Template will be created for  data with exception of some fields which require transformation as mentioned in the transformation rule.Target Ready Data Collection Template will be created for 9113 - TRM Facilities with exception of some fields which require transformation as mentioned in the transformation rule.

9113 - TRM Facilities DCT Rules


Field NameField DescriptionData TypeLengthRule
BUKRSCOMPANY_CODESame as Target Design
This is a Required field. 

This data will be captured by business. It is the Company Code under which a Stock is to be created.

In DCT, S4HANA number to be populated based upon the list of Company Codes. This list needs to be provided to the Business Team who will be downloading data from Quantum System.

Default Value "1010"
SGSARTPRODUCT_TYPESame as Target Design

Conversion Process

The generic high-level process steps for the conversion are as below:

  1. Extraction:
    1. Extract from the source systems: Apply the selection parameters and data relevancy as mentioned in this specification, from the relevant tables
    2. DCT: The DCT to be prepared if the data to be transformed and is part of the load file is not available in the Source system
  2. Transform 
    1. Transform fields by applying the fields and value mapping in the Syniti 
    2. Generate and validate Pre-load files
  3. Load
    1. Load the validated Pre-load file using SAP's LTMC or the custom upload program as applicable. 

However, with respect to object 9113- Treasury Facilities DCT will be used for transformation and generation of the pre-load file. 

Data Privacy and Sensitivity

Not Applicable

Extraction

Extract data from a source into . There are 2 possibilities:

  1. The data exists. connects to the source and loads the data into . There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible

01

Extract from relevant tables/reports from Quantum all relevant information required to populate the DCT for Interest Rate Instruments for relevant Company Codes.

This extraction is dependent on the extraction, validation and load of Master Data Object CNV 3040 BP Master. It is also dependent on completion of configuration for items like Company Code, Product Type, Transaction Type, Portfolio Codes, General Valuation Class. 

Business

Selection Screen

Not applicable as the extraction is manual activity to be performed by business in Quantum system.

Data Collection Template (DCT)

Target Ready Data Collection Template will be created for  data with exception of some fields which require transformation as mentioned in the transformation rule.Target Ready Data Collection Template will be created for 9113 - TRM Facilities with exception of some fields which require transformation as mentioned in the transformation rule.

9113 - TRM Facilities DCT Rules

Field NameField DescriptionRuleBUKRSCOMPANY_CODEThis is a Required field. 
This data will be captured by business. It is the Company Code under which a Stock is to be created.
In DCT, S4HANA number to be populated based upon the list of Company Codes. This list needs to be provided to the Business Team who will be downloading data from Quantum System.
Default Value "1010"SGSARTPRODUCT_TYPEThis is a Required field. 
This data will be captured by business. It is the Product Type under which a Stock is to be created.
In DCT, S4HANA number is defaulted to “EAP”.
Drop Down Value "CPF" and "BLT"SFHAARTTRANSACTION_TYPEThis is a Required field. 
This data will be captured by business. It is the Transaction Type under which a Stock is to be created.
In DCT, S4HANA number is defaulted to “100”.
Default Value "OBT"KONTRHPARTNERThis is a Required field.
This data will be captured by business for Counterparties. A validation is needed to check the BP number captured in the DCT is valid one and is present as per CNV 3040 - Business Partner Counterparty.
Transformation Rule is to be applied to get the BP Number from BP Text.DBLFZCONTRACT_DATEThis is a Required field.
Date format is YYYYMMDD. Contract Date will always be LESS Than the Load Date. This check needs to be implemented. 
Example: 99991231RDEALERTRADERThis is a Optional field. 
This data will be captured by business. It is the Trader who concludes the Stock.
In DCT, S4HANA Trader Code needs to be populated based upon the list of configured Traders. This list needs to be provided to the Business Team who will be downloading data from Quantum System.
Validation check needs to be done with check table TZDEARPORTBPORTFOLIOThis is a Optional field. 
This data will be captured by business. It is the Portfolio Code to bucket all Stock under for reporting purposes.In DCT, S4HANA Portfolio Codes needs to be populated based upon the list of Portfolio's configured in the system. This list needs to be provided to the Business Team who will be downloading data from Quantum System.
Validation check needs to be done with check table TWPOBZUONDASSIGNMENTThis is a Optional field.
This is a freely maintainable field to capture additional data for the deal. No validations needed for this field. NORDEXTEXTERNAL_REFERENCEThis is a Optional field.
This is a freely maintainable field to capture additional data for the deal. No validations needed for this field. REFERINTERNAL_REFERENCEThis is a Optional field.
This is a freely maintainable field to capture additional data for the deal. No validations needed for this field. MERKMCHARACTERISTICSThis is a Required field.
This field will be populated with the Legacy Quantum Deal NumberTPM_COM_VAL_CLASSVALUATION_CLASS

This is a Required field. 

This data will be captured by business. It is the
Valuation Class
Product Type under which a Stock is to be
accounted for
created.

In DCT, S4HANA
GVC
number
needs to be populated based upon the list of GVC's configured in the system. This list needs to be provided to the Business Team who will be downloading data from Quantum System.DBLFZ
is defaulted to “EAP”.

Drop Down Value "CPF" and "BLT"
SFHAARTTRANSACTION_TYPESame as Target Design
Term Start

This is a Required
Field
Date format is YYYYMMDD. Start Term Date will always be LESS Than or Equal to Load Date. This check needs to be implemented as part of Preload Validation.
Example: If load date is 20260401 and date in DCT is 20260501, then the Validation Check should fail this record.  DELFZTerm EndThis is a Required Field
field. 

This data will be captured by business. It is the Transaction Type under which a Stock is to be created.

In DCT, S4HANA number is defaulted to “100”.

Default Value "OBT"
KONTRHPARTNERCHAR20

This is a Required field.

This data will be captured by business for Counterparties. A validation is needed to check the BP number captured in the DCT is valid one and is present as per CNV 3040 - Business Partner Counterparty.

Drop Down Value needed as a Composite Drop Down box. Please refer to the Table BP Number in the special requirements section.

DVTRABCONTRACT_DATESame as Target Design
This is a Required field.


Date format is YYYYMMDD.
End Term
Contract Date will always be
Greater
LESS Than the Load Date. This check needs to be implemented. 

Example:
If load date is 20260401 and date in DCT is 20250401, then the Validation Check should fail this record.  NACalculation Period: Start Inclusive vs. End Inclusive
99991231
RPORTBPORTFOLIOSame as Target Design
This is a Optional
Field
This field defines if the Start Date is to be made inclusive in the calculation of InterestWGSCHFTTransaction CurrencyThis is a Required Field
field. 

This data will be captured by business. It is the
Currency of the Fixed Deposit.
Currency Codes are ISO standards hence it will be same in all Treasury systems. Still a Validation check is needed in Syniti to check if a valid Currency Code is used in the DCT.
Drop Down value from table "TCURC"LIMIT_DATEFTR Assignment Management: Limit DateThis is a Required field
This field defines from when the Facility Limit is applicable from.LIMIT_CHG_AMOUNTFTR Assignment Management: Drawing AmountThis is a Required field
This field defines what is value of the facility.LIMIT_CURRENCYFTR Assignment Management: Limit CurrencyThis is a Required field
This field defines what is the currency of the facilityLIMIT_POS_AMOUNTFTR Assignment Management: Drawing Amount (BAPI)This is a Required field
This field defines what amount of the facility is available to be drawn.SRHYTHMFrequencyThis is a Optional field
This field defines the Frequency on which Interest is to be paid
There is a domain value range for this field which needs to be given to business which they extract and prepare this DCT.
For Eg. Monthly or Quarterly.
Drop Down Value as per the "Frequency Category" table provided Above.AMMRHY OR ATTRHY
 (Pick any field that has a value. If the Frequency Indicator is set to Months, then AMMRHY will have a value. If Frequency Indicator is set to Days then ATTRHY will have a value.Unit for FrequencyThis is a Optional field
This field defines the number of days or months when Interest needs to be paidPKONDPercentage rate for condition itemsThis is a Optional Field
This field defines the  Interest Rate if applicable to the deal.NACalculation method for first period of condition itemThis is a Optional field
This field defines what is the calculation method of first period of Interest.
Drop Down Value from the table "Update Rule"NACalculation method for last period of condition itemThis is a Optional field
This field defines what is the calculation method of Last period of Interest.
Drop Down Value from the table "Update Rule"NAInterest Calculation MethodThis is a Optional field
This is the Interest Calculation Method for Day Counting
Portfolio Code to bucket all Stock under for reporting purposes.In DCT, S4HANA Portfolio Codes needs to be populated based upon the list of Portfolio's configured in the system. This list needs to be provided to the Business Team who will be downloading data from Quantum System.
Validation check needs to be done with check table TWPOB
ZUONDASSIGNMENTSame as Target Design
This is a Optional field.

This is a freely maintainable field to capture additional data for the deal. No validations needed for this field. 
NORDEXTEXTERNAL_REFERENCESame as Target Design
This is a Optional field.

This is a freely maintainable field to capture additional data for the deal. No validations needed for this field. 
REFERINTERNAL_REFERENCESame as Target Design
This is a Optional field.

This is a freely maintainable field to capture additional data for the deal. No validations needed for this field. 
MERKMCHARACTERISTICSSame as Target Design
This is a Required field.

This field will be populated with the Legacy Quantum Deal Number
RCOMVALCLVALUATION_CLASSSame as Target Design
This is a Required field. 

This data will be captured by business. It is the Valuation Class under which a Stock is to be accounted for.

In DCT, S4HANA GVC number needs to be populated based upon the list of GVC's configured in the system. This list needs to be provided to the Business Team who will be downloading data from Quantum System.
DBLFZTerm StartSame as Target Design
This is a Required Field

Date format is YYYYMMDD. Start Term Date will always be LESS Than or Equal to Load Date. This check needs to be implemented as part of Preload Validation.

Example: If load date is 20260401 and date in DCT is 20260501, then the Validation Check should fail this record.  
DELFZTerm EndSame as Target Design
This is a Required Field

Date format is YYYYMMDD. End Term will always be Greater Than the Load Date. This check needs to be implemented.

Example: If load date is 20260401 and date in DCT is 20250401, then the Validation Check should fail this record.  
ZSTDTINCLCalculation Period: Start Inclusive vs. End InclusiveSame as Target Design
This is a Optional Field

This field defines if the Start Date is to be made inclusive in the calculation of Interest
WGSCHFTTransaction CurrencySame as Target Design
This is a Required Field

This data will be captured by business. It is the Currency of the Fixed Deposit.

Currency Codes are ISO standards hence it will be same in all Treasury systems. Still a Validation check is needed in Syniti to check if a valid Currency Code is used in the DCT.

Drop Down value from table "TCURC"
LIMIT_DATEFTR Assignment Management: Limit DateSame as Target Design
This is a Required field

This field defines from when the Facility Limit is applicable from.
LIMIT_CHG_AMOUNTFTR Assignment Management: Drawing AmountSame as Target Design
This is a Required field

This field defines what is value of the facility.
LIMIT_CURRENCYFTR Assignment Management: Limit CurrencySame as Target Design
This is a Required field

This field defines what is the currency of the facility
LIMIT_POS_AMOUNTFTR Assignment Management: Drawing Amount (BAPI)Same as Target Design
This is a Required field

This field defines what amount of the facility is available to be drawn.
SRHYTHMFrequencySame as Target Design
This is a Optional field

This field defines the Frequency on which Interest is to be paid

There is a domain value range for this field which needs to be given to business which they extract and prepare this DCT.

For Eg. Monthly or Quarterly.

Drop Down Value as per the "Frequency Category" table provided Above.
AMMRHY OR ATTRHY
 (Pick any field that has a value. If the Frequency Indicator is set to Months, then AMMRHY will have a value. If Frequency Indicator is set to Days then ATTRHY will have a value.
Unit for FrequencySame as Target Design
of Interest and needs to be provided by business.
There is a domain value range for this field which needs to be given to business which they extract and prepare this DCT.
For Eg. ACT/360 in SAP means 2.
Drop Down Value as per the "Interest Calculation Methods" table provided Above.SKALIDWTInterest CalendarThis is a Optional field
This defines Calendar to be considered to check if the Payment date is a holiday. Calendars are another configuration item and a list needs to be provided to business to populate the DCT.
A Pre Validation check is needed if the calendar is valid in the DCT.
Drop Down Values from table "TFACD - IDENT"NAUpdate for Calculation/Due Date for Interest

This is a Optional field

This field defines the
update rule for Calculation Date and Due Date.
Drop Down Values from table "Update Rules"DVALUT
number of days or months when Interest needs to be paid
PKONDPercentage rate for condition itemsSame as Target Design
Calculation DateNAInclusive Indicator for Calculation Date

This is a Optional Field

This field

Date format is YYYYMMDD. Calculation Date will always be GREATER Than or Equal to Load Date. This check needs to be implemented as part of Preload Validation.
Example: If load date is 20260401 and date in DCT is 20260501, then the Validation Check should fail this record.  
defines the  Interest Rate if applicable to the deal.
ZCALCMETHCalculation method for first period of condition itemSame as Target Design
This is a Optional field

This field defines
if calculation period is to be shiftred to Start Inclusive or End Enclusive
what is the calculation method of first period of Interest.

Drop Down Value
is "X
from the table "Update Rule"
NAMonth-End Indicator for Calculation Date
ZCALCENDCalculation method for last period of condition itemSame as Target Design
This is a Optional field

This field defines
if Calculation Date is to be shifted to nearest Month End
what is the calculation method of Last period of Interest.

Drop Down Value
is "X
from the table "Update Rule"
SVWERK
ZINTCALCMETInterest Calculation MethodSame as Target Design
Working Day Shift for Calculation Day

This is a Optional field

This
field defines the how the Working Day
is the Interest Calculation Method for Day Counting of Interest and needs to be
calculated, for eg. If the interest payment date is a holiday then it should shift it to the Next working date.
Default Value "1"
provided by business.

There is a domain value range for this field which needs to be given to business which they extract and prepare this DCT.

For Eg. ACT/360 in SAP means 2.

Drop Down Value as per the "Interest Calculation Methods" table provided Above.
SKALIDWTInterest CalendarSame as Target Design
DFAELLDue date

This is a Optional field

This
field
defines
if calculation Date is to be shiftred to Start Inclusive or End Enclusive
Drop Down Value is "X"NAMonth-End Indicator for Due Date
Calendar to be considered to check if the Payment date is a holiday. Calendars are another configuration item and a list needs to be provided to business to populate the DCT.

A Pre Validation check is needed if the calendar is valid in the DCT.

Drop Down Values from table "TFACD - IDENT"
ZUPDATERULEUpdate for Calculation/Due Date for InterestSame as Target Design
This is a Optional field

This field defines
if calculation period is to be shiftred to Start Inclusive or End Enclusive
Drop Down Value is "X"SFWERKWorking Day Shift for Due Date
the update rule for Calculation Date and Due Date.

Drop Down Values from table "Update Rules"
DVALUTCalculation DateSame as Target Design
This is a Optional field
This field defines the how the Working Day needs to be calculated, for eg. If the interest payment date is a holiday then it should shift it to the Next working date.
Default Value "1"

Date format is YYYYMMDD. Calculation Date will always be GREATER Than or Equal to Load Date. This check needs to be implemented as part of Preload Validation.

Example: If load date is 20260401 and date in DCT is 20260501, then the Validation Check should fail this record.  
ZINCLINDInclusive Indicator for Calculation DateSame as Target Design
This is a Optional field

This field defines if calculation period is to be shiftred to Start Inclusive or End Enclusive

Drop Down Value is "X"
ZMENDINDIMonth-End Indicator for Calculation DateSame as Target Design
NAShift Due Date Back to End of Term

This is a Optional field

This field defines if
the due date
Calculation Date is to be shifted to
the end date of the deal.
nearest Month End

Drop Down Value
for this
is "X"

Extraction Dependencies

For object 9113 - TRM Facilities dependencies are applicable as under

SVWERKWorking Day Shift for Calculation DaySame as Target Design
This is a Optional field

This field defines the how the Working Day needs to be calculated, for eg. If the interest payment date is a holiday then it should shift it to the Next working date.

Default Value "1"
DFAELLDue dateSame as Target Design
This is a Optional field

This field defines if calculation Date is to be shiftred to Start Inclusive or End Enclusive

Drop Down Value is "X"
ZMENDINDIRMonth-End Indicator for Due DateSame as Target Design
This is a Optional field

This field defines if calculation period is to be shiftred to Start Inclusive or End Enclusive

Drop Down Value is "X"
SFWERKWorking Day Shift for Due DateSame as Target Design
This is a Optional field

This field defines the how the Working Day needs to be calculated, for eg. If the interest payment date is a holiday then it should shift it to the Next working date.

Default Value "1"
ZDUEDATEINDIShift Due Date Back to End of TermSame as Target Design
This is a Optional field

This field defines if the due date is to be shifted to the end date of the deal.

Drop Down Value for this is "X"

Extraction Dependencies

For object 9113 - Facilities there will be no extraction dependencies since the data is captured as part of the DCT from Quantum System. 

Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #

Step Description

Team Responsible

1

Ensure all the fields that require value mapping, as stipulated Mapping tables, have the latest signed-off mapping files imported into Syniti

Data team

2

Ensure that signed off value mappings have been maintained in the Syniti 

Syniti team

3

Confirm the value mappings as maintained in the Syniti

Data team

4

Ensure that Signed off CONSTRUCT from business has been received and maintained in Syniti 

Syniti/Data team

5

Execute transformation for the object 

Syniti team

6   

Monitor the transformation progress and ensure performance and completion is within allowed timeframe

Syniti/Data team

7.      

Generate Pre-Load reports.

Syniti team

8.      

Generate data load count.

Syniti team

9.      

Log errors as defects, if any and address resolutions. Close defects.

Syniti/Data team

10.      

Re-transform and re-validate the Pre-load reports if necessary.

Syniti/Data team

11.   

Validate the transformed file as part of pre-load validation, raise data defects or provide the pre-load sign-off.

Business

12.   

Analyse and resolve any pre-load defects logged by business.

Syniti/Data team

13.   

Repeat steps 5 to 11 if necessary

Syniti/Data team

14.   

Proceed to pre-load validations

Data team


Transformation Rules

Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
Item #Step DescriptionTeam Responsible

0001

TRM Business Partner

Data Team/Functional Treasury Team

0002

Treasury Configuration

Functional Treasury Team

Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #

Step Description

Team Responsible

1

Ensure all the fields that require value mapping, as stipulated Mapping tables, have the latest signed-off mapping files imported into Syniti

Data team

2

Ensure that signed off value mappings have been maintained in the Syniti 

Syniti team

3

Confirm the value mappings as maintained in the Syniti

Data team

4

Ensure that Signed off CONSTRUCT from business has been received and maintained in Syniti 

Syniti/Data team

5

Execute transformation for the object 

Syniti team

6   

Monitor the transformation progress and ensure performance and completion is within allowed timeframe

Syniti/Data team

7.      

Generate Pre-Load reports.

Syniti team

8.      

Generate data load count.

Syniti team

9.      

Log errors as defects, if any and address resolutions. Close defects.

Syniti/Data team

10.      

Re-transform and re-validate the Pre-load reports if necessary.

Syniti/Data team

11.   

Validate the transformed file as part of pre-load validation, raise data defects or provide the pre-load sign-off.

Business

12.   

Analyse and resolve any pre-load defects logged by business.

Syniti/Data team

13.   

Repeat steps 5 to 11 if necessary

Syniti/Data team

14.   

Proceed to pre-load validations

Data team

Transformation Rules

From DCT Field SFHAART
Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
NANANACONSTRUCTS4HANAVTBFHABUKRSCOMPANY_CODEFrom DCT Field BUKRS
NANANACONSTRUCTS4HANAVTBFHASGSARTPRODUCT_TYPEFrom DCT Field SGSART
NANANACONSTRUCTS4HANAVTBFHASFHAARTTRANSACTION_TYPE
NANANACONSTRUCTS4HANAUtility Table
(VTBFHA)
KONTRHZSTDTINCLCalculation Period: Start Inclusive vs. End InclusivePARTNERFrom DCT Field KONTRH
Step 1 - Concatenate BUT000 - Name_ORG1, Name_ORG2, Name_ORG3 & Name_ORG4.
Step 2 - Compare the BP Name in the DCT with the concatenated filed name.
Step 3 - Find the BP Number for the match BUT000 - PARTNER
Step 4 - Pass the BP Number fetched in BUT000 in table BUT100 to check if Role "TR0151"
Step 5 - If the condition matches, then replace the BP Number in the DCT field VTBFHA - KONTRHCalculation Period: Start Inclusive vs. End Inclusive
NANANACONSTRUCTS4HANAUtility Table
(VTBFHA)
DBLFZZCALCMETHCalculation method for first period of condition itemCONTRACT_DATEFrom DCT Field DBLFZCalculation method for first period of condition item
NANANACONSTRUCTS4HANAVTBFHAZURDEALERUtility Table
(VTBFHA)
ZCALCENDCalculation method for last period of condition itemTRADERFrom DCT Field RDEALERCalculation method for last period of condition item
NANANACONSTRUCTS4HANAUtility Table
(VTBFHA)
RPORTBZINTCALCMETPORTFOLIOInterest Calculation MethodFrom DCT Field RPORTBInterest Calculation Method
NANANACONSTRUCTS4HANAUtility Table
(VTBFHA)
ZUONDZUPDATERULEUpdate for Calculation/Due Date for InterestASSIGNMENTFrom DCT Field ZUONDUpdate for Calculation/Due Date for Interest
NANANACONSTRUCTS4HANAVTBFHAZUNORDEXTUtility Table
(VTBFHA)
ZINCLINDInclusive Indicator for Calculation DateEXTERNAL_REFERENCEFrom DCT Field NORDEXTInclusive Indicator for Calculation Date
NANANACONSTRUCTS4HANAUtility Table
(VTBFHA)
REFERZMENDINDIMonth-End Indicator for Calculation DateINTERNAL_REFERENCEFrom DCT Field REFERMonth-End Indicator for Calculation Date
NANANACONSTRUCTS4HANAUtility Table
(VTBFHA)
MERKMZMENDINDIRMonth-End Indicator for Due DateCHARACTERISTICSFrom DCT Field MERKMMonth-End Indicator for Due Date
NANANACONSTRUCTS4HANAUtility Table
(VTBFHA
TPM_COM_VAL_CLASS)ZDUEDATEINDIShift Due Date Back to End of TermVALUATION_CLASSFrom DCT Field TPM_COM_VAL_CLASSShift Due Date Back to End of Term
NANANACONSTRUCTS4HANAVTBFHADBLFZBUKRSCOMPANY_CODETerm StartFrom DCT Field DBLFZBUKRS
NANANACONSTRUCTS4HANAVTBFHADELFZRFHATerm EndFrom DCT Field DELFZTRANSACTION NUMBERInternal Field generated by SAP. 
Note Copy field MERKM field in DCT to ZLEGACYRFHA
NANANACONSTRUCTS4HANANANACalculation Period: Start Inclusive vs. End InclusiveFrom DCT Field Calculation Period: Start Inclusive vs. End Inclusive
NANANACONSTRUCTS4HANAVTBFHAWGSCHFTSGSARTPRODUCT_TYPETransaction CurrencyFrom DCT Field WGSCHFTSGSART
NANANACONSTRUCTS4HANAVTB_ASGN_LIMITLIMIT_DATEFTR Assignment Management: Limit DateVTBFHASFHAARTTRANSACTION_TYPEFrom DCT Field SFHAARTFrom DCT Field LIMIT_DATE
NANANACONSTRUCTS4HANAVTB_ASGN_LIMITLIMIT_CHG_AMOUNTFTR Assignment Management: Drawing AmountFrom DCT Field LIMIT_CHG_AMOUNT
NANANACONSTRUCTS4HANAVTB_ASGN_LIMITLIMIT_CURRENCYFTR Assignment Management: Limit CurrencyFrom DCT Field LIMIT_CURRENCY
NANANACONSTRUCTS4HANAVTB_ASGN_LIMITLIMIT_POS_AMOUNTFTR Assignment Management: Drawing Amount (BAPI)From DCT Field LIMIT_POS_AMOUNT
NANANACONSTRUCTS4HANAVTBFINKOSRHYTHMFrequencyFrom DCT Field SRHYTHM
NANANACONSTRUCTS4HANAVTBFINKOAMMRHY OR ATTRHYUnit for FrequencyFrom DCT Field AMMRHY OR ATTRHY
NANANACONSTRUCTS4HANAVTBFHAPOPKONDPercentage rate for condition itemsFrom DCT Field PKOND
NANANACONSTRUCTS4HANANANACalculation method for first period of condition itemFrom DCT Field Calculation method for first period of condition item
NANANACONSTRUCTS4HANANANACalculation method for last period of condition itemFrom DCT Field Calculation method for last period of condition item
NANANACONSTRUCTS4HANANANAInterest Calculation MethodFrom DCT Field Interest Calculation Method
NANANACONSTRUCTS4HANAVTBFHAPOSKALIDWTInterest CalendarFrom DCT Field SKALIDWT
NANANACONSTRUCTS4HANANANAUpdate for Calculation/Due Date for InterestFrom DCT Field Update for Calculation/Due Date for Interest
NANANACONSTRUCTS4HANAVTBFHAPODVALUTCalculation DateFrom DCT Field DVALUT
NANANACONSTRUCTS4HANANANAInclusive Indicator for Calculation DateFrom DCT Field Inclusive Indicator for Calculation Date
NANANACONSTRUCTS4HANANANAMonth-End Indicator for Calculation DateFrom DCT Field Month-End Indicator for Calculation Date
NANANACONSTRUCTS4HANAVTBFINKOSVWERKWorking Day Shift for Calculation DayFrom DCT Field SVWERK
NANANACONSTRUCTS4HANAVTBFINKODFAELLDue dateFrom DCT Field DFAELL
NANANACONSTRUCTS4HANANANAMonth-End Indicator for Due DateFrom DCT Field Month-End Indicator for Due Date
NANANACONSTRUCTS4HANAVTBFINKOSFWERKWorking Day Shift for Due DateFrom DCT Field SFWERK
NANANACONSTRUCTS4HANANANAShift Due Date Back to End of TermFrom DCT Field Shift Due Date Back to End of Term

Transformation Mapping

Mapping Table NameMapping Table Description

Business Partner 

Mapping Table for Quantum counterparty/partner code to S4HANA Business Partner

Transformation Dependencies

List the steps that need to occur before transformation can commenceItem #Step DescriptionTeam Responsible

1

Ensure all the fields that require value mapping, as stipulated Mapping tables, have the latest signed-off mapping files imported into Syniti

Data team

2

Ensure that signed off value mappings have been maintained in the Syniti 

Syniti team

3

Confirm the value mappings as maintained in the Syniti

Data team

4

Ensure that Signed off DCT from business has been received and maintained in Syniti

Syniti/Data team

5

Confirm on the extracted values

Syniti, Data and business

Pre-Load Validation

Project Team

The Pre Load validations are performed by Project Team

Completeness

TaskAction

Generation of
Pre-load reports

 Mandatory field check.

  • Company Code for which deal is created is part of the scope
  • The business partner is in the Counterparty role
  • Product Type, Transaction Type, Portfolio Code and General Valuation Class is matching the configuration check tables
  • The validity end date of the deal in the Pre-load file is not prior to cutover/go-live date
  • All other fields marked as Mandatory are not kept blank in the DCT File

Record Count

Record Count

Confirm the record counts in preload summary report

  • Total Records: 
    • Valid Records:
    • Invalid Records

Business Confirmation

Data team after the initial validation of Pre-Load validation based on the pre agreed validation checklist

To send the Pre-Load file to the Business Representatives for all plants/valuation area in scope for conversion

Business Representatives to validate the pre-load file

Agree with data team on the next steps for erroneous records

Accuracy

TaskAction

Mandatory field mapping and transformation 

Obtain a list of the fields to be populated with values from mapping files and ensure all these fields contain S/4HANA values. 

  • Company Code, Product Type, Transaction Type, Portfolio Code and GVC in the DCT is matching with the Check Tables provided
  • Custom Table checks for Interest Calculation Method and Frequency are matched

Business Value Checks

All dates, Amount and Interest Rate for the Fixed Deposits are accurately populated in the deal as per DCT.

Records in Errors

Review and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data.

VTBFHAKONTRHPARTNERFrom DCT field "KONTRH"

Step 1 - Compare the BP Number in the DCT with BP XREFF - BPEXT field

Step 2 - Find the BP Number for the match BP XREFF - PARTNER Field

Step 3 - Pass the BP Number fetched from BP XREFF in table BUT100 to check if Role "TR0151" is assigned to the BP

Step 4 - If the condition matches, then replace the BP Number in the DCT field VTBFHA - KONTRH

Business

The following pre-load validations will be performed by business.

Completeness

TaskAction

Check Data load register count

Business Data Owner/s to verify that the total number of relevant records to be converted as per DCT is equal to the total number of records in the Preload file.

Key Fields Check

Business to check some key fields such as validity end date, Start an End Date, Amount, Interest Rate, etc., are correctly populated against the DCT

Accuracy

TaskAction

Conversion accuracy

To check and validate the load files with all the transformation and mapping rules, to be signed off.

Load

For loading Facilities, SAP has provided a standard BAPI which will have all the necessary fields for successful creation of Facilities. The said BAPI has various Sub-Sections which will form a Load Template and a mapping rule between the DCT and BAPI load format. 

BAPI Name : BAPI_FTR_FAC_DEALCREATE

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget BAPITarget BAPI StructureTarget FieldTarget DescriptionTransformation Logic1NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_CREATE_FACSTART_TERMTerm StartFrom DCT Field DBLFZ2NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_CREATE_FACEND_TERMTerm EndFrom DCT Field DELFZ3NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_CREATE_FACSTART_INCLUSIVECalculation Period: Start Inclusive vs. End InclusiveFrom DCT Field Calculation Period: Start Inclusive vs. End Inclusive4NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_CREATE_FACCURRENCYTransaction CurrencyFrom DCT Field WGSCHFT5NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGETABLEINDEXUnique Identifier of a Table RowIgnore or Keep Blank6NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGECONDITION_TYPECondition Type (Smallest Subdivision of Condition Records)Ignore or Keep Blank7NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGEEFFECTIVE_FROMCondition Item Effective FromIgnore or Keep Blank8NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGEZERO_CONDITIONCondition is a Zero ConditionIgnore or Keep Blank9NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGEFREQUENCYFrequencyFrom DCT Field SRHYTHM10NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGEFREQUENCY_UNITUnit for FrequencyFrom DCT Field AMMRHY OR ATTRHY11NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGEAMOUNT_CALC_RULEAmount-Based Structure of a ConditionIgnore or Keep Blank12NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGEPERCENTAGE_RATEPercentage rate for condition itemsFrom DCT Field PKOND13NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGEAMOUNTCondition Item Currency AmountIgnore or Keep Blank14NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGECURRENCYCurrency of Condition ItemIgnore or Keep Blank15NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGECURRENCY_ISOISO currency codeIgnore or Keep Blank16NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGECALC_1ST_PERIODCalculation method for first period of condition itemFrom DCT Field Calculation method for first period of condition item17NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGECALC_LST_PERIODCalculation method for last period of condition itemFrom DCT Field Calculation method for last period of condition item18NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGECALC_EXPONENTIALType of Compound Interest CalculationIgnore or Keep Blank19NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGEPAYMENT_RATEPayment RateIgnore or Keep Blank20NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGECALC_METHODInterest Calculation MethodFrom DCT Field Interest Calculation Method21NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGECALC_CALENDARInterest CalendarFrom DCT Field SKALIDWT22NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGEDATE_UPDATE_RULEUpdate for Calculation/Due Date for InterestFrom DCT Field Update for Calculation/Due Date for Interest23NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGECALC_DATECalculation DateFrom DCT Field DVALUT24NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGECALC_DATE_INCLUSIVEInclusive Indicator for Calculation DateFrom DCT Field Inclusive Indicator for Calculation Date25NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGECALC_DATE_MONTH_ENDMonth-End Indicator for Calculation DateFrom DCT Field Month-End Indicator for Calculation Date26NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGECALC_DATE_WKDAY_SHIFTWorking Day Shift for Calculation DayFrom DCT Field SVWERK27NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGEDUE_DATEDue dateFrom DCT Field DFAELL28NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGEDUE_DATE_MONTH_ENDMonth-End Indicator for Due DateFrom DCT Field Month-End Indicator for Due Date29NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGEDUE_DATE_WKDAY_SHIFTWorking Day Shift for Due DateFrom DCT Field SFWERK30NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGESHIFT_DUE_DATE_TO_ENDShift Due Date Back to End of TermFrom DCT Field Shift Due Date Back to End of Term3132
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGESHIFT_DAYSShift Days for Relative Date DeterminationIgnore or Keep Blank
VTBFHAZUDVTRABCONTRACT_DATEFrom DCT Field DVTRAB
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGECALENDAR1Calendar for working day rulesIgnore or Keep Blank33
VTBFHARPORTBPORTFOLIOFrom DCT Field RPORTB
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGECALENDAR2Calendar for working day rulesIgnore or Keep Blank34
VTBFHAZUONDASSIGNMENTFrom DCT Field ZUOND
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGECALENDAR3Calendar for working day rulesIgnore or Keep Blank35
VTBFHAREFERINTERNAL_REFERENCEFrom DCT Field REFER
36
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGEROUND_TYPERounding CategoryIgnore or Keep Blank
VTBFHAMERKMCHARACTERISTICSFrom DCT Field MERKM
NANANACONSTRUCTS4HANAVTBFHARCOMVALCL
BAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGEROUND_UNITRounding UnitIgnore or Keep Blank37
VALUATION_CLASSFrom DCT Field TPM_COM_VAL_CLASS
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGEROUNDUNIT_BASECurrency Amount in BAPI InterfacesIgnore or Keep Blank38
VTBFHADBLFZTerm StartFrom DCT Field DBLFZ
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGESETTLE_FREQUENCY_EXPONENTIALInterest Settlement Frequency for Exponential Interest Calc.Ignore or Keep Blank39
VTBFHADELFZTerm EndFrom DCT Field DELFZ
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGEFACILITYLINELine of CreditIgnore or Keep Blank40
VTBFHAWGSCHFTTransaction CurrencyFrom DCT Field WGSCHFT
NANANACONSTRUCTS4HANAUtility Field (VTB_ASGN_LIMIT)BUKRSCOMPANY_CODEFrom DCT Field BUKRS
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CHARGEAMOUNT_EFFECTIVE_FROMCondition Item Effective from AmountIgnore or Keep Blank41
Utility Field (VTB_ASGN_LIMIT)RFHATRANSACTION NUMBERInternal Field generated by SAP. 
Note Copy field MERKM field in DCT to ZLEGACYRFHA
NANANACONSTRUCTS4HANA
BAPI
VTB_
FTR
ASGN_
FAC_DEALCREATEBAPI_FTR_FAC_CHARGECALC_BASE_TYPECalculation Base IndicatorIgnore or Keep Blank42
LIMITRELAT_OBJFTR Assignment Management: Assignment Object

Internal Field generated by SAP.


Use Internally generated Sequential Number

NANANACONSTRUCTS4HANA
BAPI
VTB_
FTR
ASGN_
FAC_DEALCREATE
LIMIT
BAPI
RELAT_
FTR
OBJ_
FAC_CHARGECHARGE_KEYKey which Identifies a Condition in the BAPIIgnore or Keep Blank43
CATFTR Assignment Management: Category of Assignment Object

Internal Field generated by SAP.


Use Internally generated Sequential Number

NANANACONSTRUCTS4HANA
BAPI
VTB_
FTR
ASGN_
FAC_DEALCREATE
LIMIT
BAPI_FTR_FAC_CREDLINEVALID_FROM
LIMIT_DATEFTR Assignment Management: Limit DateFrom DCT Field LIMIT_DATE
44
NANANACONSTRUCTS4HANA
BAPI
VTB_
FTR_FAC
ASGN_
DEALCREATE
LIMIT
BAPI
LIMIT_
FTR_FAC
CHG_
CREDLINE
AMOUNTFTR Assignment Management: Drawing AmountFrom DCT Field LIMIT_CHG_AMOUNT
45
NANANACONSTRUCTS4HANA
BAPI
VTB_
FTR
ASGN_
FAC_DEALCREATE
LIMITLIMIT_
BAPI_FTR_FAC_CREDLINE
CURRENCYFTR Assignment Management: Limit CurrencyFrom DCT Field LIMIT_CURRENCY
46
NANANACONSTRUCTS4HANA
BAPI
VTB_
FTR
ASGN_
FAC_DEALCREATEAMOUNT_NEW
LIMIT
BAPI_FTR_FAC_CREDLINECURRENCY_ISOISO currency codeIgnore or Keep Blank47NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEBAPI_FTR_FAC_CREDLINE
LIMIT_POS_AMOUNTFTR Assignment Management: Drawing Amount (BAPI)From DCT Field LIMIT_POS_
AMOUNT
AMOUNT
NANANACONSTRUCTS4HANAVTBFHAPOBUKRSCOMPANY_CODEFrom DCT Field BUKRS
NANANACONSTRUCTS4HANAVTBFHAPORFHATRANSACTION NUMBERInternal Field generated by SAP. 
Note Copy field MERKM field in DCT to ZLEGACYRFHA
Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic1
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATEBUKRSCOMPANY_CODEFrom DCT field "BUKRS”
VTBFHAPORFHAZUTransaction Activity

Internal Field generated by SAP.


Use Internally generated Sequential Number

2

NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATEVVSARTPRODUCT_TYPEFrom DCT field "SGSART"
VTBFHAPODCRDATENTERED ON

Internal Field generated by SAP.


Use System Date while you generate your report

3

NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETB_SFHAARTTRANSACTION_TYPEFrom DCT field "SFHAART"
VTBFHAPOTCRTIMENTRY TIME

Internal Field generated by SAP


Use System Time when you generate your report.

4

NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETB_RFHAEXTERNAL_TRANSACTION_NUMBERKeep Blank or Ignore the field
VTBFHAPORFHAZBTRANSACTION FLOW

Internal Field generated by SAP.


Use Internally generated Sequential Number

5

NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETB_KUNNR_NEWPARTNERFrom DCT field "KONTRH"
VTBFHAPOPKONDPercentage rate for condition itemsFrom DCT Field PKOND
6
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETB_DVTRABCONTRACT_DATEFrom DCT field "DBLFZ"
VTBFHAPOSKALIDWTInterest CalendarFrom DCT Field SKALIDWT
78
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETB_TVTRABCONTRACT_TIMESystem Time at the time of Data Load
VTBFHAPODVALUTCalculation DateFrom DCT Field DVALUT
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETB_GSPPARTCONTACT_PERSONKeep Blank or Ignore the field
VTBFHAZUBUKRSCOMPANY_CODEFrom DCT Field BUKRS
9
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATERDEALERTRADERFrom DCT field "RDEALER"
VTBFHAZURFHATRANSACTION NUMBERInternal Field generated by SAP. 
Note Copy field MERKM field in DCT to ZLEGACYRFHA
10
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATERREFKONT_OBSOLETEACCT_ASSIGNMENT_REFKeep Blank or Ignore the field
VTBFHAZURFHAZUTRANSACTION ACTIVITY

Internal Field generated by SAP.


Use Internally generated Sequential Number

11

NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATERPORTB
VTBFHAZUNORDEXTEXTERNAL_REFERENCE
PORTFOLIO12
From DCT
field "RPORTB"
Field NORDEXT
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETB_TFPROJFINANCE_PROJECTKeep Blank or Ignore the field
VTBFINKOBUKRSCOMPANY_CODEFrom DCT Field BUKRS
13
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETB_RGARANT_NEWGUARANTORKeep Blank or Ignore the field
VTBFINKORFHATRANSACTION NUMBERInternal Field generated by SAP. 
Note Copy field MERKM field in DCT to ZLEGACYRFHA
14
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETB_RMAIDMASTER_AGREEMENTKeep Blank or Ignore the field
VTBFINKORGATTCLASS

Internal Field generated by SAP


Use System Time when you generate your report.

15

NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETB_ZUONDASSIGNMENTFrom DCT field "ZUOND"
VTBFINKORFHAZUTransaction Activity

Internal Field generated by SAP


Use System Time when you generate your report.

16

NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETB_NORDEXTEXTERNAL_REFERENCEFrom DCT field "NORDEXT"
VTBFINKORKONDGRDIRECTION OF TRANSACTION

Internal Field generated by SAP


Use System Time when you generate your report.

17

NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETB_REFERINTERNAL_REFERENCEFrom DCT field "REFER"
VTBFINKORKONDCONDITION

Internal Field generated by SAP


Use System Time when you generate your report.

18

NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETB_MERKMCHARACTERISTICSFrom DCT field "MERKM"
VTBFINKODGUEL_KPCONDITION ITEM EFFECTIVE FROM

Internal Field generated by SAP.


Use System Date while you generate your report

19

NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETBEGRUAUTH_GROUPKeep Blank or Ignore the field
VTBFINKONSTUFELEVEL NUMBER OF CONDITION ITEMS FOR RECURRING PAYMENT

Internal Field generated by SAP


Use System Time when you generate your report.

20

NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETB_CRUSERCREATE_USERKeep Blank or Ignore the field
VTBFINKOSRHYTHMFrequencyFrom DCT Field SRHYTHM
21
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETB_DCRDATENTRY_DATEDate on which the data is getting loaded.
VTBFINKOAMMRHY OR ATTRHYUnit for FrequencyFrom DCT Field AMMRHY OR ATTRHY
22
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETB_FACILITYNRFACILITYKeep Blank or Ignore the field23
VTBFINKOSVWERKWorking Day Shift for Calculation DayFrom DCT Field SVWERK
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETB_FACILITYBUKRSFACILITY_COMPANY_CODEKeep Blank or Ignore the field
VTBFINKODFAELLDue dateFrom DCT Field DFAELL
24
NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATETPM_COM_VAL_CLASSVALUATION_CLASSFrom DCT field "TPM_COM_VAL_CLASS”25NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEFM_FUNDFUNDKeep Blank or Ignore the field26NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATEGM_GRANT_NBRGRANT_NBRKeep Blank or Ignore the field27NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATETB_SPESENEXPENSE_KEYKeep Blank or Ignore the field28NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATETB_SANSTRESERV_REASONKeep Blank or Ignore the field29NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATETPM_TREA_CLEARING_OPTCLEARING_OPTIONKeep Blank or Ignore the field30NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATETPM_TREA_CLEARING_STATUSCLEARING_STATUSKeep Blank or Ignore the field31NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATETPM_TREA_CLEARING_DATECLEARING_DATEKeep Blank or Ignore the field32NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATETPM_EXT_ACCOUNTEXT_ACCOUNTKeep Blank or Ignore the field33NANANACONSTRUCTS4HANABAPI_FTR_FAC_DEALCREATETPM_TREA_CLEARING_DATE_ACTCLEAR_DATE_ACTKeep Blank or Ignore the field34NANANACONSTRUCTS4HANA
VTBFINKOSFWERKWorking Day Shift for Due DateFrom DCT Field SFWERK



Transformation Mapping


Mapping Table NameMapping Table Description

Business Partner 

Mapping Table for Quantum counterparty/partner code to S4HANA Business Partner

Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible

1

Ensure all the fields that require value mapping, as stipulated Mapping tables, have the latest signed-off mapping files imported into Syniti

Data team

2

Ensure that signed off value mappings have been maintained in the Syniti 

Syniti team

3

Confirm the value mappings as maintained in the Syniti

Data team

4

Ensure that Signed off DCT from business has been received and maintained in Syniti

Syniti/Data team

5

Confirm on the extracted values

Syniti, Data and business


Pre-Load Validation

Project Team

The Pre Load validations are performed by Project Team

Completeness

TaskAction

Generation of
Pre-load reports

 Mandatory field check.

  • Company Code for which deal is created is part of the scope
  • The business partner is in the Counterparty role
  • Product Type, Transaction Type, Portfolio Code and General Valuation Class is matching the configuration check tables
  • The validity end date of the deal in the Pre-load file is not prior to cutover/go-live date
  • All other fields marked as Mandatory are not kept blank in the DCT File

Record Count

Record Count

Confirm the record counts in preload summary report

  • Total Records: 
    • Valid Records:
    • Invalid Records

Business Confirmation

Data team after the initial validation of Pre-Load validation based on the pre agreed validation checklist

To send the Pre-Load file to the Business Representatives for all plants/valuation area in scope for conversion

Business Representatives to validate the pre-load file

Agree with data team on the next steps for erroneous records


Accuracy

TaskAction

Mandatory field mapping and transformation 

Obtain a list of the fields to be populated with values from mapping files and ensure all these fields contain S/4HANA values. 

  • Company Code, Product Type, Transaction Type, Portfolio Code and GVC in the DCT is matching with the Check Tables provided
  • Custom Table checks for Interest Calculation Method and Frequency are matched

Business Value Checks

All dates, Amount and Interest Rate for the Fixed Deposits are accurately populated in the deal as per DCT.

Records in Errors

Review and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data.


Business

The following pre-load validations will be performed by business.

Completeness

TaskAction

Check Data load register count

Business Data Owner/s to verify that the total number of relevant records to be converted as per DCT is equal to the total number of records in the Preload file.

Key Fields Check

Business to check some key fields such as validity end date, Start an End Date, Amount, Interest Rate, etc., are correctly populated against the DCT


Accuracy

TaskAction

Conversion accuracy

To check and validate the load files with all the transformation and mapping rules, to be signed off.


Load


For loading Facilities, SAP has provided a standard BAPI which will have all the necessary fields for successful creation of Facilities. The said BAPI has various Sub-Sections which will form a Load Template and a mapping rule between the DCT and BAPI load format. 

BAPI Name : BAPI_FTR_FAC_DEALCREATE


Target BAPITarget FieldTarget DescriptionTransformation Logic
BAPI_FTR_FAC_DEALCREATE
FTR_THRESHOLD_RISK_MITIGATINGRISK_MITIGATIONKeep Blank or Ignore the field35NANANACONSTRUCTS4HANA
BUKRSCOMPANY_CODEFrom DCT field "BUKRS”
BAPI_FTR_FAC_DEALCREATE
FTR_THRESHOLD_SCHEMELEGAL_BASISKeep Blank or Ignore the field36NANANACONSTRUCTS4HANA
VVSARTPRODUCT_TYPEFrom DCT field "SGSART"
BAPI_FTR_FAC_DEALCREATE
FTR_TARO_TRADE_IDEXTERNAL_TRADE_IDKeep Blank or Ignore the field37NANANACONSTRUCT
TB_SFHAARTTRANSACTION_TYPEFrom DCT field "SFHAART"
S4HANA38NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATE
PRCTRPROFIT_CENTERKeep Blank or Ignore the field
TB_KUNNR_NEWPARTNERFrom DCT field "KONTRH"
BAPI_FTR_FAC_DEALCREATE
KOSTL
TB_DVTRAB
COST
CONTRACT_
CENTERKeep Blank or Ignore the field39NANANACONSTRUCTS4HANA
DATEFrom DCT field "DVTRAB"
BAPI_FTR_FAC_DEALCREATE
PS
TB_
PSP_PNR
TVTRAB
WBS
CONTRACT_
ELEMENTKeep Blank or Ignore the field40NANANACONSTRUCT
TIMESystem Time at the time of Data Load
BAPI_FTR_FAC_DEALCREATERPORTBPORTFOLIOFrom DCT field "RPORTB"
S4HANA
BAPI_FTR_FAC_DEALCREATE
GSBERBUSINESS_AREAKeep Blank or Ignore the field
TB_ZUONDASSIGNMENTFrom DCT field "ZUOND"
41NANANACONSTRUCTS4HANA42NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATE
TOE_HEDGING_CLASSIFICATION_OLDHEDGE_CLASSIFICATIONKeep Blank or Ignore the field
TB_NORDEXTEXTERNAL_REFERENCEFrom DCT field "NORDEXT"
BAPI_FTR_FAC_DEALCREATE
TRPA
TB_
INITIAL_STAGE
REFER
INIT
INTERNAL_
CLASSIFIERKeep Blank or Ignore the field
REFERENCEFrom DCT field "REFER"
BAPI_FTR_FAC_DEALCREATETB_MERKMCHARACTERISTICSFrom DCT field "MERKM"
43NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATE
LAND1COUNTRYKeep Blank or Ignore the field44NANANACONSTRUCTS4HANA
TB_DCRDATENTRY_DATEDate on which the data is getting loaded.
BAPI_FTR_FAC_DEALCREATE
INTCACOUNTRY_ISOKeep Blank or Ignore the field
TPM_COM_VAL_CLASSVALUATION_CLASSFrom DCT field "TPM_COM_VAL_CLASS”
45NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATE
FB
START_
SEGMENT
TERM
SEGMENTKeep Blank or Ignore the field46NANANACONSTRUCT
Term StartFrom DCT Field DBLFZ
BAPI_FTR_FAC_DEALCREATEEND_TERMTerm EndFrom DCT Field DELFZ
S4HANA
BAPI_FTR_FAC_DEALCREATE
TRBA_BEHALF_OF_COMPANYON_BEHALF_OF_COMPANYKeep Blank or Ignore the field
START_INCLUSIVECalculation Period: Start Inclusive vs. End InclusiveFrom DCT Field Calculation Period: Start Inclusive vs. End Inclusive
BAPI_FTR_FAC_DEALCREATECURRENCYTransaction CurrencyFrom DCT Field WGSCHFT
BAPI_FTR_FAC_DEALCREATEFREQUENCYFrequencyFrom DCT Field SRHYTHM
47NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATE
TOE_HEDGING_CLASSIFICATIONHEDGING_CLASSIFICATIONKeep Blank or Ignore the field48NANANACONSTRUCTS4HANA
FREQUENCY_UNITUnit for FrequencyFrom DCT Field AMMRHY OR ATTRHY
BAPI_FTR_FAC_DEALCREATE
TOE_REQUEST_IDHEDGE_REQUEST_IDKeep Blank or Ignore the field49NANANACONSTRUCTS4HANA
PERCENTAGE_RATEPercentage rate for condition itemsFrom DCT Field PKOND
BAPI_FTR_FAC_DEALCREATECALC_1ST_PERIODCalculation method for first period of condition itemFrom DCT Field Calculation method for first period of condition item
BAPI_FTR_FAC_DEALCREATE
FTR
CALC_
CFI
LST_
CODECFI_CODEKeep Blank or Ignore the field50NANANACONSTRUCTS4HANA
PERIODCalculation method for last period of condition itemFrom DCT Field Calculation method for last period of condition item
BAPI_FTR_FAC_DEALCREATE
RANL
CALC_
ISIN51NANANACONSTRUCTS4HANA
METHOD
ISINKeep Blank or Ignore the field
Interest Calculation MethodFrom DCT Field Interest Calculation Method
BAPI_FTR_FAC_DEALCREATE
TBA
CALC_
MIC
CALENDAR
MICKeep Blank or Ignore the field52NANANACONSTRUCTS4HANA
Interest CalendarFrom DCT Field SKALIDWT
BAPI_FTR_FAC_DEALCREATE
FTR
DATE_
CONTRACT
UPDATE_
TIMESTAMP_UTCCONTRACT_TIMESTAMP_UTCKeep Blank or Ignore the field53NANANACONSTRUCTS4HANA
RULEUpdate for Calculation/Due Date for InterestFrom DCT Field Update for Calculation/Due Date for Interest
BUSINESS
BAPI_FTR_FAC_DEALCREATE
BUPLA
CALC_
PLACEKeep Blank or Ignore the field54NANANACONSTRUCTS4HANA
DATECalculation DateFrom DCT Field DVALUT
BAPI_FTR_FAC_DEALCREATECALC_DATE_INCLUSIVEInclusive Indicator for Calculation DateFrom DCT Field Inclusive Indicator for Calculation Date
BAPI_FTR_FAC_DEALCREATE
FKBERFUNCTIONAL_AREAKeep Blank or Ignore the field55NANANACONSTRUCTS4HANA
CALC_DATE_MONTH_ENDMonth-End Indicator for Calculation DateFrom DCT Field Month-End Indicator for Calculation Date
BAPI_FTR_FAC_DEALCREATE
TPM
CALC_
CUST
DATE_
DIFF_TERM_VALUECUSTOM_DIFF_TERM_1Keep Blank or Ignore the field56NANANACONSTRUCTS4HANA
WKDAY_SHIFTWorking Day Shift for Calculation DayFrom DCT Field SVWERK
BAPI_FTR_FAC_DEALCREATEDUE_DATEDue dateFrom DCT Field DFAELL
BAPI_FTR_FAC_DEALCREATE
TPM
DUE_
CUST
DATE_
DIFF
MONTH_
TERM_VALUECUSTOM_DIFF_TERM_2Keep Blank or Ignore the field
ENDMonth-End Indicator for Due DateFrom DCT Field Month-End Indicator for Due Date
57NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATE
TPM
DUE_
CUST
DATE_
DIFF
WKDAY_
TERM_VALUECUSTOM_DIFF_TERM_3Keep Blank or Ignore the field58NANANACONSTRUCTS4HANA
SHIFTWorking Day Shift for Due DateFrom DCT Field SFWERK
BAPI_FTR_FAC_DEALCREATE
TPM
SHIFT_
CUST
DUE_
DIFF
DATE_
TERM_VALUECUSTOM_DIFF_TERM_4Keep Blank or Ignore the field
TO_ENDShift Due Date Back to End of TermFrom DCT Field Shift Due Date Back to End of Term
BAPI_FTR_FAC_DEALCREATEVALID_FROMFTR Assignment Management: Limit DateFrom DCT Field LIMIT_DATE
59NANANACONSTRUCTS4HANA60NANANACONSTRUCTS4HANA
BAPI_FTR_FAC_DEALCREATE
TPM_CUST_DIFF_TERM_VALUECUSTOM_DIFF_TERM_5Keep Blank or Ignore the field
AMOUNTFTR Assignment Management: Drawing AmountFrom DCT Field LIMIT_CHG_AMOUNT
BAPI_FTR_FAC_DEALCREATECURRENCYFTR Assignment Management: Limit CurrencyFrom DCT Field LIMIT_CURRENCY
BAPI_FTR_FAC_DEALCREATE
TPM_CUST_DIFF_TERM_VALUECUSTOM_DIFF_TERM_5
AMOUNT_NEWFTR Assignment Management: Drawing Amount (BAPI)From DCT Field LIMIT_POS_AMOUNT
Keep Blank or Ignore the field


This BAPI has a simulation run provision. As part of the Pre-Load check when all the Syniti ADMM checks are performed, before making the production run of all the Interest Rate Instruments, a simulation run should be performed and all the standard BAPI errors needs to be documented.

A custom report, if required needs to be created for this. The report needs to have row reference and display the standard BAPI return messages successful as well as failed. This will make sure all the Interest Rate Instruments successfully pass all checks.

Note: It is also assumed that the DCT will not bring in Payment Details of Interest Rate Instruments. This information will be loaded as part of CNV 3040 – Business Partner Counterparty. Under this CNV, Payment SI details are created and assigned to this instrument. If this is done, once the BAPI is executed, it will automatically get assigned to the deal as part of Standard BAPI processing. A Data Pre-Validation check has been introduced for this step.


 The load process includes:

  1. Execute the automated data load into target system using "BAPI_FTR_IRATE_CREATE" and use the DCT File vs structure section of this document to populate the BAPI details.  
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation with side by side check of each fields  in scope of the objects with fields to be displayed as XXXX_ECC, XXXX_S4HANA, XXXX_MATCH ( As TRUE or FALSE) with an additional column denoting fields not matching and status of loading in S/4HANA as LOADED_IN_S4HANA ( As TRUE or FALSE)

Load Run Sheet

Item #Step DescriptionTeam Responsible

01

Go to load file and pick 5 data records, load manually without any tool. See what happens. If all okay, proceed with the next step.

Data team

02

Go to load file and pick 10 records and load them with the tool. No action if the previous step has fallen. If not, then continue to load 10 records with the tool. Check if everything went okay.

Data team

03

Proceed with the full load if steps one and two were succeed else fix the issue with records

Data team

04

Validate few records loaded by accessing standard transactions from S/4HNA e.g.  FTR_EDIT or check in the tables - VTBFHA, VTBFHAZU or VTBFHAPO

Data team

05

Generate post load report if step 5 is validated

Data team

06

Log errors as defects, if any and address resolutions. Close defects.

Data team

07

Resolve defects by reupload and re-generate post load reports if necessary.

Data team

08

Business to validate the post load files as part of post-load validation, raise data defects or provide the post-load sign-off.

Business

09

Repeat steps 1 to 5 if necessary.

Data team


Load Phase and Dependencies

The load phase for the object 9116-Treasury Interest Rate Instruments is Pre-Cutover Phase 3

Configuration

Item #Configuration Item

01

Company Codes relevant for Treasury- Field BUKRS (Check Table: T001)

02

Treasury Business Partners - BUT100

03

House Bank Ids- Field HKTID (Check Table: T012K)

04

Payment Methods- Field ZLSCH (Check Table: T042Z)

05

Contract Type - Field RANTYP  

06

Product Category- Field SANLF (Check Table: TZAF)

07

Product Type- Field SGSART (Check Table: TZPA)

08

Financial Transaction Types- Field SFHAART (Check Table: AT10)

09

Portfolio Code - Check Table: TWPOB 

10

General Valuation Class - Check Table: TRGC_COM_VALCL

Conversion Objects

Object #Preceding Object Conversion Approach

CNV-3007

Business Partner - General Role

CNV-1083

Bank Master

CNV-3040

Business Partner - Treasury

Error Handling

The table below depicts some possible system errors for this data object during data load.  All data load error is to be logged as defect and managed within the Defect Management

Error TypeError DescriptionAction Taken

Valid Master 

Business Partner is not having a valid treasury role i.e. TR0151

Ensure that Business Partner is updated with correct role

Invalid Company Code

Company Code in the DCT is invalid based on the check table T001

Ensure correct Company Code is supplied to the BAPI

Invalid Product Type

 Product Type in the DCT is invalid based on the check table TZPA

Ensure correct Product Type is supplied to the BAPI

Invalid Transaction Type

Transaction Type in the DCT is invalid based on the check table AT10

Ensure correct Transaction Type is supplied to the BAPI

Invalid Trader

 Trader in the DCT is invalid based on the check table TZDEA

Ensure correct Trader is supplied to the BAPI

Invalid Portfolio Code

Portfolio Code in the DCT is invalid based on the check table TWPOB

Ensure correct Portfolio Code is supplied to the BAPI

Invalid Interest Calculation Method

 Interest Calculation Method is invalid as per the Custom Check Table

Ensure correct Interest Calculation method is supplied to the BAPI

Invalid Frequency Category

Frequency Category is invalid as per the Custom Check Table

Ensure correct Frequency Category is supplied to the BAPI


Post-Load Validation

Project Team

The following post load validations will be done by Project Team

Completeness

TaskAction

Reconciliation of Record Count

Record Count - Count and check how many records were loaded vs. Records in the load file (Each mock has it's own data record count)

Check for logs from Load and fix erroneous records, if any.

To check the records loaded, a variant will be created in standard SAP report "FTR_00". We can take a dump from this standard report to verify all the relevant information as part of the load.  


Accuracy

TaskAction

Check values in key fields for accuracy

Post-load reports will have the same structure as the load file and some additional columns as required to facilitate the post load validation.

Leverage on tool to create a Post Load report that reports S/4HANA loaded records along with the legacy values side-by-side to allow for 100% check of all these fields in the shortest possible time.

Any mismatch will be reported under the Post Load - Error report.


Business

The following post load validations will be done by business.

Completeness

TaskAction

Record Count Check

Review the record count report from the Data Team and ensure it is correct by cross-checking with the record count confirmed during Pre-load Business Validations


Business may also run transaction code FTR_EDIT or FTR_00 to cross check the records created for Counterparties


Accuracy

TaskAction

Field Checks

Check key fields to ensure that Business Partner - Counterparty has been maintained with proper details such as 

  • Right Amount is loaded in the created deal
  • Correct Payment Details are loaded in the deal
  • Ensure Correct Interest Rate is loaded in the deal
  • Ensure correct Start and End Date are loaded in the created deal


Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • All configuration items like Company Code, Product Type, Transaction Type, etc are approved by business and pre-configured before this data can be loaded
  • All Bank Account information is approved by business and loaded in the system. Same are also created as SI details in BP master and assigned to the correct Product Type/Transaction Type combination in the BP master as these will be auto loaded in the deal and will not be part of the DCT. 


Change log

Change History
limit10