When the origin flow is FI or COPA, there is no responsible cost center by default.
A table needs to be used to infer the Responsible cost center using the combination of the a GBU, a Macro package or a Package, a Company code and/or the plant code.
Different combination can be entered and the determination rule of the responsible cost center follows the following sequence:
Status colour Blue title step 1
This table is used to determine the responsible cost center when the origin flow is FI or COPA.
1. Download the file here and update it with the list of combinations to be used for the determination of responsible cost centers (you can leave some fields blank):
| GBU | Cost macro-package | Cost package | BFC Activity 1 | Company code | Plant | Controlling area | Responsible cost center |
|---|---|---|---|---|---|---|---|
Enter the BFC GBU code ex: PE | Enter a macro-package ex: P00003 | Enter a package ex: P10012 | Enter an Activity 1 ex: CSNR | Enter a company code ex: 0237 | Enter a plant ex: CJEI | Enter the controlling area corresponding to the company code ex: CHEF | Enter the responsible cost center ex: X481200000 |
| ... | ... |
These rules are stored in DSO APCOCT15
| Status | ||||
|---|---|---|---|---|
|
Once the file is ready, follow the procedure
hereCo$ta - Flat Files loading to upload it in BW.