Purpose
T
The purpose of this document is to define the conversion approach to create 2005 - Material Master - Work Scheduling View
in S/4 HANA.
In SAP PP-PI, the Work Scheduling view in the Material Master is a plant-specific view that contains essential data for producing a material in-house, allowing you to create and schedule production orders for it. Key fields within this view include the Production Scheduling Profile, which automates key tasks for production orders, and the Production Scheduler, who manages the material's capacity requirements. Maintaining this view is necessary for managing production processes and enabling the system to calculate production and operation start and end dates.
Purpose of the Work Scheduling View
Enables Production Orders:
You must maintain the Work Scheduling view for a material to allow the system to create production or process orders for it.
Plant-Level Data:
This view contains data specific to a particular plant, as production processes are managed at the plant level.
Key Fields and Their Functions
Production Scheduler:
A person or role responsible for managing the material's production in a specific plant. They determine how capacity requirements are calculated during a scheduling run.
Production Scheduling Profile (PSP):
A crucial tool for standardizing and automating production processes. It can dictate actions like automatically releasing and scheduling orders, triggering goods receipts, or managing batch creation.
While PF2 and WP2 serve as source systems, extensive mapping and transformation logic will be necessary to produce properly formatted load templates in line with the target design. Due to the new plant mapping and the Material / plant mapping, an extensive cleansing, transformation to do for this object
The data from legacy system may include:
- Only Active materials
- Material /Plant combination for all the "E" & "X" procurement materials as this view only intended for the manufactured products
The data from legacy system excludes:
- All materials flagged for deletion
- Any blocked or obsolete materials
- Any inactive materials that are out of scope
Conversion Scope
The scope of this document covers the approach for converting active Material Master - Work Scheduling view from Legacy Source Systems into S/4HANA following the Material Master - Work Scheduling view Master Data Design Standard.
The data from legacy system includes:
- Use the logic for Data Relevancy for the CNV-2019 Material Master - Basic Views
- All materials created in the previous 6 months will be included unless flagged for deletion
- Material Types ZUNB, ZBOM, ZPRC will be included regardless of activity (unless flagged for deletion)
- We will only include materials that are extended to the following (excluding ZPRC material type as these do not require plant extension):
- Company Codes in scope
- Plants in scope
- Purchasing Orgs in scope
- Sales Orgs in scope
- Include only Material Types in scope
- We will include for migration all materials that have activity over the previous 3 years, to include:
- For procurement data use EKKO/EKPO tables (remove any records in EKKO/EKPO where LOEKZ = 'X') and use EKPO/AEDAT for previous 3 years filter
- For sales data use VBAK/VBAP tables
- For production data use AFKO/AFPO tables
- Additionally, we can check material movements using MKPF/MSEG tables (and Transaction Types: IB,ID,IZ,RS,SI,WA,WE,WF,WH,WI,WL,WO,WQ,WR,WS,WV,WZ)
- We will include for migration all materials that have open documents including the following:
- Open PO
- Open contracts
- Open STO
- Open SO
- Open WO
- Have current stock/open inventory
For Open Inventory use the following tables:
MARD
MKOL (Consignment stock)
MSKA (Sales Order stock)
MSLB (Special stock)
MSPR (Project stock)
- We will include all BOM data for materials in scope using tables: MAST/STKO/STPO
- Materials with Deletion Flags will be excluded unless appearing in the following open transactions:
- Open PO
- Open contracts
- Open STO
- Open SO
- Open WO
- Deletion Flags (Table/Field) are as follows: MARA/LVORM = 'X' MARA/MSTAE = Z3, Z4, ZZ (PF2 system) Z0 (WP2 system)
- Materials with the word 'OBSOLETE' or 'DELETED' contained within the Short Description will be excluded. Also excluded are Materials where Short Description contains '**OBS', '**OBS**', '**OBS***', '*OBS*', '*OBS**', '***OBS***'
- For selected data, if Procurement type MARC.BESKZ = 'E' , then MARC PSTAT like '%A%' - WS relevancy for all the relevant materials
The data from legacy system excludes:
- All materials flagged for deletion
- Any blocked or obsolete materials
- Any inactive materials that are out of scope
| Source | Scope | Source Approx. No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
| PF2 | SAP ECC PF2 records for approximately 60 manufacturing plants divided in the 2 source systems | 8,000 | S4 HANA | 6,000 |
| WP2 | SAP ECC PF2 records for approximately 60 manufacturing plants divided in the 2 source systems | 25,000 | S4 HANA | 20,000 |
Additional Information
Multi-language Requirement
System Pre-defined Languages
Document Management
N/A
Legal Requirement
N/A
Special Requirements
N/A
Target Design
The technical design of the target for this conversion approach. The target is on the transformation rules. This list includes what type of field, length and others.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| MARC | AUSME | AUSME | Unit of issue | UNIT | 3 | C |
| MARC | FRTME | FRTME | Production unit | UNIT | 3 | C |
| MARC | MMSTA | MMSTA | Material Status | CHAR | 2 | R|
| MARC | MMSTD | MMSTD | Valid From | DATS | 8 | R : If MARC-MMSTA is filled this field is required |
| MARC | FEVOR | FEVOR | Prodn Supervisor | CHAR | 3 | R |
| MARC | LGPRO | LGPRO | Storage Location | CHAR | 4 | R |
| MARC | SFCPF | CO_PRODPRF | Prod. Sched. Profile | CHAR | 6 | R : Mapping with As Is values and to be values to be provided |
| MARC | MATGR | MATNRGROUP | Mat. Grouping | CHAR | 20 | NU |
| MARC | SERNP | SERAIL | Serial Number Profile | CHAR | 4 | NU |
| MARA | SERLV | SERLV | SerLevel | CHAR | 1 | NU |
| MARC | OCMPF | OCM_GPROFILE | Overall profile | CHAR | 6 | NU |
| MARC | KZKRI | KZKRI | Indicator: Critical part | CHAR | 1 | NU |
| MARC | KZECH | KZECH | Batch entry | CHAR | 1 | R : Empty is a valid value |
| MARA | XCHPF | XCHPF | Batch Management Requirement Indicator | CHAR | 1 | R : Empty is a valid value |
| MARC | INSMK | INSMK | Post to Inspection Stock | CHAR | 1 | R : Empty is a valid value |
| MARA | XGCHP | XGCHP | Approved Batch Record Required | CHAR | 1 | NU |
| MARC | XCHPF | XCHPF | Batch Management Requirement Indicator for Plant | CHAR | 1 | R : Empty is a valid value |
| MARC | UNETO | UNETO | Underdel. Tol. | DEC | 3 | NU |
| MARC | UEETO | UEETO | Overdeliv. Tol. | DEC | 3 | NU |
| MARC | UEETK | UEETK | Indicator: Unlimited Overdelivery Allowed | CHAR | 1 | NU |
| MARC | RUEZT | RUEZT | Setup time | DEC | 5 | NU |
| MARC | TRANZ | TRANZ | Interoperation | DEC | 5 | NU |
| MARC | DZEIT | DZEIT | In-house production time | DEC | 3 | NU |
| MARC | BEARZ | BEARZ | Processing time | DEC | 5 | NU |
| MARC | BASMG | BASMG | Base quantity | QUAN | 13 | NU |
Data Cleansing
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
| 01 | CNV-01 | Material is not an "E" Procurement type | Materials with "E" Procurement needs to have Work Scheduling View | Materials with no "E" procurement are out of scope | PF2/WP2 |
| 02 | CNV-02 | Production Scheduling Profile is missing | Materials with WS View in Material Master must have Production Scheduling Profile | Materials with no Prod. Sched Profile needs to be updated by the business | PF2/WP2 |
| 03 | CNV-03 | Production Supervisor is Missing | Materials with WS view and No Prod Supervisor filled, needs to be checked by the Business | Prod Supervisor has been updated for all relevant materials | PF2/WP2 |
| 04 | CNV-04 | Production Storage Location is missing | Materials with WS view need to have Production Storage location defined | Material without Prod Storage Location needs to be updated for all relevant materials | PF2/WP2 |
| 05 | CNV-05 | Production Version is missing | Materials with WS view needs to have a PV | Report to show Proc Type E, WS view, w/o PV flag | PF2/WP2 |
| 06 | CNV-06 | Work Scheduling View is missing | Materials with MARC-BESK = E but <> "A" as MARC status | No Procurement type E has no Work Scheduling View | PF2/WP2 |
Conversion Process
The high-level process is represented by the diagram below:
Data Privacy and Sensitivity
Extraction
Extract data from a source into . There are 2 possibilities:
- The data exists. connects to the source and loads the data into . There are 3 methods:
- Perform full data extraction from relevant tables in the source system(s).
- Perform extraction through the application layer.
- Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
- The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
Extraction Run Sheet
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| 1 | Extract from MARC all Material/Plant relevant as Procurement Type E, and be updated as "A" means that the Work Scheduling view is updated | Sinity / Data Team |
2 | Extract data from source system based on relevancy rule | SyWay Data Team |
3 | Google Sheet report pre-populated with PF2 and WP2 information to be generated based on relevancy criteria. | SyWay Data Team |
| 4 | Sinity will extract data and convert it into SQL data base ad share with the team | Sinity team |
Selection Screen
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
Data Collection Template (DCT)
Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.DCT Rules
| Field Name | Field Description | Rule |
|---|---|---|
| WERKS | PLANT | Show List |
| MATNR | Material Number | Show List |
| AUSME | Unit of issue | Show List |
| FRTME | Production unit | Show List |
| MMSTA | Material Status | Show List |
| MMSTD | Valid From | Report day |
| LGPRO | Production Storage Location | Selection Option / Values from System |
| KZECH | Batch Entry | Selection Option / Values from System |
| XCHPF | Batch Management | Selection Option / Values from System |
| INSMK | Post to Inspection Stock | Selection Option / Values from System |
| FEVOR | Prod Supervisor | Selection Option / Values from System |
| SCHPF | Prod Sch Profile | Selection Option / Values from System |
| Link to the Layout |
Extraction Dependencies
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Data Profiling. MARC table Data Profiling needs to happen before the extraction of data. | Sinity |
| 2 | Data Cleansing Reports need to be created | Sinity |
| 3 | Data cleansing already done by the Business | Business / Data Team |
| 4 | Data has to be validated from the Business to get ready to extract from the source | Business / Data Team |
Transformation
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:
- Perform value mapping and data transformation rules.
- Legacy values are mapped to the to-be values (this could include a default value)
- Values are transformed according to the rules defined in
- Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation
Transformation Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
1 | <Add steps from Syniti Migrate here> | SyWay S2P Data Team |
2 | Review and Validate Error and Preload Reports | SyWay S2P Data Team |
3 | Generate Load Files | SyWay S2P Data Team |
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | PF2/WQ2 | MARC | WERKS | PLANT | S/4 HANA | MARC | WERKS | PLANT | Follow the transformation rules of CNV-2010 |
| 1 | PF2/WQ2 | S_MARA | MATNR | Material Number | S/4HANA | S_MARA | MATNR | Material Number | Follow the rule as per Material Master Basic Views about creation for new Material Numbers CNV-2018 CNV-2010 Materials - General Plant Data / S.Loc Data |
| 2 | PF2/WQ2 | MARC | AUSME | Unit of issue | S/4HANA | MARC | AUSME | Unit of issue | Based from MARA UOM |
| 3 | PF2/WQ2 | MARC | FRTME | Production unit | S/4HANA | MARC | FRTME | Production unit | Value Mapping (Unit of issue for material /plant) |
| 6 | PF2/WQ2 | MARC | LGPRO | Production Storage Location | S/4HANA | MARC | LGPRO | Production Storage Location | Value Mapping for Storage Location for Production |
| 7 | PF2/WQ2 | MARC | KZECH | Batch Entry | S/4HANA | MARC | KZECH | Batch Entry | Copy |
| 8 | PF2/WQ2 | MARC | XCHPF | Batch Management | S/4HANA | MARC | XCHPF | Batch Management | Copy |
| 10 | PF2/WQ2 | MARC | FEVOR | Prodn Supervisor | S/4HANA | MARC | FEVOR | Prodn Supervisor | Value Mapping for Plant/Material / Prod Supervisor |
| 11 | PF2/WQ2 | MARC | SCHPF | Prod Sch Profile | S/4HANA | MARC | SCHPF | Prod Sch Profile | Values Mapping for Plant/Material/Prod Sch Profile |
Transformation Mapping
| Mapping Table Name | Mapping Table Description |
|---|---|
Material Type | Mapping of legacy Material Types to target system value |
Material Group | Mapping of legacy Material Groups to target system value |
Transformation Dependencies
List the steps that need to occur before transformation can commence| Item # | Step Description | Team Responsible |
|---|---|---|
1 | Data cleansing must be finished and validated | SyWay MFG Data Team |
2 | Data Transformation load files need to be validated by the business at Plant Level | SyWay MFG Data Team |
| 3 | All Value Mapping files must be finished and aligned with the CS | SyWay MFG Data Team |
| 4 | All Data dependencies has to be finished. Any delay can bring delays on this |
Pre-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Verify Record Count | SyWay MFG Data Team to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets. |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | SyWay MFG Data Team to verify that all fields below meet pass the checks:
|
Review Error Reports | Review and correct the errors. Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data. |
Business
Completeness
| Task | Action |
|---|---|
| To check Data Accuracy checking count of records to load and loaded | Business Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets. |
Accuracy
| Task | Action |
|---|---|
| Data owners to grant that the records in the load files are okay and according with the rules and mappings | To check and validate the load files with all the transformation and mapping rules, to be signed off. |
Load
The load process includes:
- Execute the automated data load into target system using load tool or product the load file if the load must be done manually
- Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation
Load Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
1 | Go to load file and pick 5 data registers, load manually without any tool. See what happens. If all okay, proceed with the next step. | SyWay MFG Data Team |
2 | Go to load file and pick 10 records and load them with the tool. No action if the previous step has fallen. If not, then continue to load 10 records with the tool. Check if everything went okay. | SyWay MFG Data Team |
3 | Proceed with the full load if steps one and two were succeed. | SyWay MFG Data Team |
4 | Validate few records loaded by accessing standard transactions from S/4HNA eg. MM03 | SyWay MFG Data Team |
5 | Generate post load report if step 5 is validated | SyWay MFG Data Team |
Load Phase and Dependencies
Configuration
| Item # | Configuration Item |
|---|---|
| 001 | Production Scheduling Profile |
| 002 | Production Supervisor |
Conversion Objects
| Object # | Preceding Object Conversion Approach |
|---|---|
| list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram) | |
Error Handling
| Error Type | Error Description | Action Taken |
|---|---|---|
Post-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Verify Count | SyWay P2F MFG Data Team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA. |
Accuracy
| Task | Action |
|---|---|
Verify Logs | Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.). |
Business
Completeness
| Task | Action |
|---|---|
Verify Count | Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file. |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | Verify that the Material data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. |
Key Assumptions
- Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
- CNV-2008 Material Master - Work Scheduling view is in scope based on data design and any exception requested by business.
See also