One line per scrum team should be added.


Scrum Team name/ SM name

Jira BOARD (link)

Where are sprints documented?

Team's composition (link)

Who is part of my team?

The User Story flowSprint validation

Sprint backlog



Scrum mastering


Scrum ceremonies


Product backlog



Data Squad JIRA boardData Squad



  •  Has consistent durations. (starts - ends on Wednesday for one team and Thursday for the other)
  •  New sprints start immediately after the previous concludes is (true)
  •   A sprint goal is always set and is (tracked in Jira and Confluence) 
  •   Makes visible all the work to meet the sprint goal.
  •   Must have at least one improvement plan identified in previous sprint retrospective.
  •  Only the development team manages the sprint backlog.
  •  It must represent a live picture of the work done and remaining.
  •  All items must meet the definition of done before are considered finished
  •  Promotes and supports the scrum process.
  •  Helps everybody to understand the Scrum theory, practices, rules and values.

Helps product owner to:

  •   Ensure that goals, scope and domain are understood by everyone.
  •  Find techniques to maintain product backlog effectively.
  •  Facilitate scrum events as requested or needed.

Helps development team to:

  •  Remove progress blockers.
  •  Facilitates scrum events as requested or needed.

Helps the organization to:

  •   Lead and coach in scrum adoption.
  •  Work with other scrum masters to increase scrum effectiveness.
Sprint Planning
  •  30min-1h
  •  The Product Owner must set a sprint goal.
Scrum daily
  •   The duration is 15 minutes.
  •  It is held every day.
  •  Detailed discussions, adaptations, replannings are outside this meeting.
  •  The scrum master ensures that the meeting takes place.
  •  The development team conducts the meeting.
Sprint review
  •  30 min
  •  The product owner reviews what has been "Done" and what has not been "Done".
  •   The product backlog is reviewed.
Sprint retrospective
  •  45 min - 1h
  •  It takes place after the sprint review and before the sprint planning.
  •  The meeting is positive and productive.
  •  Create a plan to improve how the scrum team works.
  •   The product owner is responsible for its content, availability and ordering.
  •  Product backlog refinement  takes place iteratively.
  •  The items on top (higher priority) must be clear and meet the definition of ready

DataLab Squad JIRA boardDataLab Squad
  •  The length is (2 weeks)
  •  Has consistent durations. (starts - ends on Wednesday for one team and Thursday for the other)
  •  New sprints start immediately after the previous concludes is (true)
  •   A sprint goal is always set and is (tracked in Jira and Confluence) 
  •   Makes visible all the work to meet the sprint goal.
  •   Must have at least one improvement plan identified in previous sprint retrospective.
  •  Only the development team manages the sprint backlog.
  •  It must represent a live picture of the work done and remaining.
  •  All items must meet the definition of done before are considered finished
  •  Promotes and supports the scrum process.
  •  Helps everybody to understand the Scrum theory, practices, rules and values.

Helps product owner to:

  •   Ensure that goals, scope and domain are understood by everyone.
  •  Find techniques to maintain product backlog effectively.
  •  Facilitate scrum events as requested or needed.

Helps development team to:

  •  Remove progress blockers.
  •  Facilitates scrum events as requested or needed.

Helps the organization to:

  •   Lead and coach in scrum adoption.
  •  Work with other scrum masters to increase scrum effectiveness.
Sprint Planning
  •  30 min
  •  The Product Owner must set a sprint goal.
Scrum daily
  •   The duration is 15 minutes.
  •  It is held every day.
  •  Detailed discussions, adaptations, replannings are outside this meeting.
  •  The scrum master ensures that the meeting takes place.
  •  The development team conducts the meeting.
Sprint review
  •  30 min
  •  The product owner reviews what has been "Done" and what has not been "Done".
  •   The product backlog is reviewed.
Sprint retrospective
  •  45 min - 1h
  •  It takes place after the sprint review and before the sprint planning.
  •  The meeting is positive and productive.
  •  Create a plan to improve how the scrum team works.
  •   The product owner is responsible for its content, availability and ordering.
  •  Product backlog refinement  takes place iteratively.
  •  The items on top (higher priority) must be clear and meet the definition of ready

IWASIECZKO-ext, Lukasz

Labware LIMS Squad

Labware LIMS Squad JIRA Board

Labware LIMS Squad

NOT SCRUM

 
  •  Kanban 





Scrum Master: ABELIAN-ext, Sevak 

Squad name:

SolvExtract


The creation of digital services webapps to provide value, insights and optimization on the Mineral and Metal Extraction processes at Syensqo with a focus on solvent extraction.

SolvExtract board

Image Modified

Jean-Philip Poulin: Product Owner

Zackary Therrien: Lead Developer

Annie Durand: Senior Developer

Emilie Vaudrin: Developer

Cassandre Pochet: Developer

Beatrice Lopez: Developer

Rachel Michaud: Developer

Grégory Paul: Project Manager

Todd Tupper: Data Architect (point to point connections, model of the data, basically "whatever needs to be done" ) 

Juan Mantilla: Application Owner (SME like)

Sevak Abelian: Scrum Master



  •  Has consistent durations. (starts - ends on Monday)
  •  New sprints start immediately after the previous concludes is (true)
  •   A sprint goal is always set and is (N/A) 
  •   Makes visible all the work to meet the sprint goal.
  •   Must have at least one improvement plan identified in previous sprint retrospective.
  •  Only the development team manages the sprint backlog.
  •  It must represent a live picture of the work done and remaining.
  •  All items must meet the definition of done before are considered finished
  •  Promotes and supports the scrum process.
  •  Helps everybody to understand the Scrum theory, practices, rules and values.

Helps product owner to:

  •   Ensure that goals, scope and domain are understood by everyone.
  •  Find techniques to maintain product backlog effectively.
  •  Facilitate scrum events as requested or needed.

Helps development team to:

  •  Remove progress blockers.
  •  Facilitates scrum events as requested or needed.

Helps the organization to:

  •   Lead and coach in scrum adoption.
  •  Work with other scrum masters to increase scrum effectiveness.
Sprint Planning
  •  60min.
  •  The Product Owner must set a sprint goal.
  •   The duration is 15 minutes.
  •  It is held every day.
  •  Detailed discussions, adaptations, replannings are outside this meeting.
  •  The scrum master ensures that the meeting takes place.
  •  The development team conducts the meeting.
Sprint review
  •  60-90min.
  •  The product owner reviews what has been "Done" and what has not been "Done".
  •   The product backlog is reviewed.
Sprint retrospective
  •  45-60min.
  •  It takes place after the sprint review and before the sprint planning.
  •  The meeting is positive and productive.
  •  Create a plan to improve how the scrum team works.
  •   The product owner is responsible for its content, availability and ordering.
  •  Product backlog refinement  takes place iteratively.
  •  The items on top (higher priority) must be clear and meet the definition of ready

Scrum Master: ABELIAN-ext, Sevak 

Squad name:

SmartFloat


SmartFloat board

Image Modified



  •  Has consistent durations. (starts - ends on Tuesday)
  •  New sprints start immediately after the previous concludes is (true)
  •   A sprint goal is always set and is (N/A) 
  •   Makes visible all the work to meet the sprint goal.
  •   Must have at least one improvement plan identified in previous sprint retrospective.
  •  Only the development team manages the sprint backlog.
  •  It must represent a live picture of the work done and remaining.
  •  All items must meet the definition of done before are considered finished
  •  Promotes and supports the scrum process.
  •  Helps everybody to understand the Scrum theory, practices, rules and values.

Helps product owner to:

  •   Ensure that goals, scope and domain are understood by everyone.
  •  Find techniques to maintain product backlog effectively.
  •  Facilitate scrum events as requested or needed.

Helps development team to:

  •  Remove progress blockers.
  •  Facilitates scrum events as requested or needed.

Helps the organization to:

  •   Lead and coach in scrum adoption.
  •  Work with other scrum masters to increase scrum effectiveness.
Sprint Planning
  •  60min.
  •  The Product Owner must set a sprint goal.
Scrum bi-weekly
  •   The duration is 15 minutes.
  •  It is held twice per week
  •  Detailed discussions, adaptations, replannings are outside this meeting.
  •  The scrum master ensures that the meeting takes place.
  •  The development team conducts the meeting.
Sprint review
  •  60min.
  •  The product owner reviews what has been "Done" and what has not been "Done".
  •   The product backlog is reviewed.
Sprint retrospective
  •  60min.
  •  It takes place after the sprint review and before the sprint planning.
  •  The meeting is positive and productive.
  •  Create a plan to improve how the scrum team works.
  •   The product owner is responsible for its content, availability and ordering.
  •  Product backlog refinement  takes place iteratively.
  •  The items on top (higher priority) must be clear and meet the definition of ready

Scrum Master: ABELIAN-ext, Sevak 

Squad name:

Data Usage


Data Usage board


Image Modified



  •  Has consistent durations. (starts - ends on Monday)
  •  New sprints start immediately after the previous concludes is (true)
  •   A sprint goal is always set and is (N/A) 
  •   Makes visible all the work to meet the sprint goal.
  •   Must have at least one improvement plan identified in previous sprint retrospective.
  •  Only the development team manages the sprint backlog.
  •  It must represent a live picture of the work done and remaining.
  •  All items must meet the definition of done before are considered finished
  •  Promotes and supports the scrum process.
  •  Helps everybody to understand the Scrum theory, practices, rules and values.

Helps product owner to:

  •   Ensure that goals, scope and domain are understood by everyone.
  •  Find techniques to maintain product backlog effectively.
  •  Facilitate scrum events as requested or needed.

Helps development team to:

  •  Remove progress blockers.
  •  Facilitates scrum events as requested or needed.

Helps the organization to:

  •   Lead and coach in scrum adoption.
  •  Work with other scrum masters to increase scrum effectiveness.
Sprint Planning
  •  30min.
  •  The Product Owner must set a sprint goal.
Scrum bi-weekly
  •   The duration is 15 minutes.
  •  It is held twice per week.
  •  Detailed discussions, adaptations, replannings are outside this meeting.
  •  The scrum master ensures that the meeting takes place.
  •  The development team conducts the meeting.
Sprint review
  •  60-90min.
  •  The product owner reviews what has been "Done" and what has not been "Done".
  •   The product backlog is reviewed.
Sprint retrospective
  •  45-60min.
  •  It takes place after the sprint review and before the sprint planning.
  •  The meeting is positive and productive.
  •  Create a plan to improve how the scrum team works.
  •   The product owner is responsible for its content, availability and ordering.
  •  Product backlog refinement  takes place iteratively.
  •  The items on top (higher priority) must be clear and meet the definition of ready

Scrum Master: ABELIAN-ext, Sevak 

Squad name:

Data Transformation


Data Transformation board

Image Modified



  •  Has consistent durations. (starts - ends on Monday)
  •  New sprints start immediately after the previous concludes is (true)
  •   A sprint goal is always set and is (N/A) 
  •   Makes visible all the work to meet the sprint goal.
  •   Must have at least one improvement plan identified in previous sprint retrospective.
  •  Only the development team manages the sprint backlog.
  •  It must represent a live picture of the work done and remaining.
  •  All items must meet the definition of done before are considered finished
  •  Promotes and supports the scrum process.
  •  Helps everybody to understand the Scrum theory, practices, rules and values.

Helps product owner to:

  •   Ensure that goals, scope and domain are understood by everyone.
  •  Find techniques to maintain product backlog effectively.
  •  Facilitate scrum events as requested or needed.

Helps development team to:

  •  Remove progress blockers.
  •  Facilitates scrum events as requested or needed.

Helps the organization to:

  •   Lead and coach in scrum adoption.
  •  Work with other scrum masters to increase scrum effectiveness.
Sprint Planning
  •  30min.
  •  The Product Owner must set a sprint goal.
Scrum bi-weekly
  •   The duration is 15 minutes.
  •  It is held twice per week.
  •  Detailed discussions, adaptations, replannings are outside this meeting.
  •  The scrum master ensures that the meeting takes place.
  •  The development team conducts the meeting.
Sprint review
  •  60-90min.
  •  The product owner reviews what has been "Done" and what has not been "Done".
  •   The product backlog is reviewed.
Sprint retrospective
  •  45-60min.
  •  It takes place after the sprint review and before the sprint planning.
  •  The meeting is positive and productive.
  •  Create a plan to improve how the scrum team works.
  •   The product owner is responsible for its content, availability and ordering.
  •  Product backlog refinement  takes place iteratively.
  •  The items on top (higher priority) must be clear and meet the definition of ready

Scrum Master: ABELIAN-ext, Sevak 

Squad name:

System


System board

NOT SCRUM

Image Modified








Pricing Data Lake

 

Image Removed

Image Added



  •  Has consistent durations. (starts - ends on
which days of the week
  • Mondays)
  •  New sprints start immediately after the previous concludes is (true)
  •   A sprint goal is always set and is (Jira) 
  •   Makes visible all the work to meet the sprint goal.
  •   Must have at least one improvement plan identified in previous sprint retrospective.
  •  Only the development team manages the sprint backlog.
  •  It must represent a live picture of the work done and remaining.
  •  All items must meet the definition of done before are considered finished
  •  Promotes and supports the scrum process.
  •  Helps everybody to understand the Scrum theory, practices, rules and values.

Helps product owner to:

  •   Ensure that goals, scope and domain are understood by everyone.
  •  Find techniques to maintain product backlog effectively.
  •  Facilitate scrum events as requested or needed.

Helps development team to:

  •  Remove progress blockers.
  •  Facilitates scrum events as requested or needed.

Helps the organization to:

  •   Lead and coach in scrum adoption.
  •  Work with other scrum masters to increase scrum effectiveness.
Sprint Planning
  •  1 hour
  •  The Product Owner must set a sprint goal.
Scrum daily
  •   The duration is 15 minutes.
  •  It is held every day.
  •  Detailed discussions, adaptations,
replannings
  • re-planning are outside this meeting.
  •  The scrum master ensures that the meeting takes place.
  •  The development team conducts the meeting.
Sprint review
  •  1 hour
  •  The product owner reviews what has been "Done" and what has not been "Done".
  •   The product backlog is reviewed.
Sprint retrospective
  •  
1h30
  • 1hour
  •  It takes place after the sprint review and before the sprint planning.
  •  The meeting is positive and productive.
  •  Create a plan to improve how the scrum team works.
  •   The product owner
is
  • and Business Analysts are responsible for its content, availability and ordering.
  •  Product backlog refinement  takes place iteratively.
  •  The items on top (higher priority) must be clear and meet the definition of ready
Bongiorno

Alix

Bola   

Execution and Campaign

  Image Added

 PCF Jira BoardPCF Team Composition



  •  Has consistent durations. (starts
on mondays
  • - ends on
fridays
  • Mondays)
  •  New sprints start immediately after the previous concludes is (true)
  •   A sprint goal is always set and is (
in
  • Jira
Sprint goals
  • ) 
  •   Makes visible all the work to meet the sprint goal.
  •   Must have at least one improvement plan identified in previous sprint retrospective.
  •  Only the development team manages the sprint backlog.
  •  It must represent a live picture of the work done and remaining.
  •  All items must meet the definition of done before are considered finished
  •  Promotes and supports the scrum process.
  •  Helps everybody to understand the Scrum theory, practices, rules and values.

Helps product owner to:

  •   Ensure that goals, scope and domain are understood by everyone.
  •  Find techniques to maintain product backlog effectively.
  •  Facilitate scrum events as requested or needed.

Helps development team to:

  •  Remove progress blockers.
  •  Facilitates scrum events as requested or needed.

Helps the organization to:

  •   Lead and coach in scrum adoption.
  •  Work with other scrum masters to increase scrum effectiveness.
Sprint Planning
  •  1 hour
  •  The Product Owner must set a sprint goal.
Scrum daily
  •   The duration is 15 minutes.
  •  It is held every day.
  •  Detailed discussions, adaptations,
replannings
  • re-planning are outside this meeting.
  •  The scrum master ensures that the meeting takes place.
  •  The development team conducts the meeting.
Sprint review
  •  
1 hour
  • 45 minutes
  •  The product owner reviews what has been "Done" and what has not been "Done".
  •   The product backlog is reviewed.
Sprint retrospective
  •  
1h30
  • 45 minutes
  •  It takes place after the sprint review and before the sprint planning.
  •  The meeting is positive and productive.
  •  Create a plan to improve how the scrum team works.
  •   The product owner is responsible for its content, availability and ordering.
  •  Product backlog refinement  takes place iteratively.
  •  The items on top (higher priority) must be clear and meet the definition of ready
BENETT

Lou-Ann 

Squad Names

  • Lead & Sample
  • Tech Excellence Squad
  • CRM Services

CRM Services

Jira Board

TechEx

Jira Board

Lead & Sample

Jira Board

Image Removed

Maintenance

Tech Excellence Squad

Image Removed

CRM Services

Image Removed

 Has consistent weeks duration. (starts on Monday- ends on Friday

Bola   

Price Optimisation

  Image Added



  •  Has consistent durations. (starts - ends on Mondays)
  •  New sprints start immediately after the previous concludes is (true)
  •   A sprint goal is always set and is (
tracked in
  • Jira) 
  •   Makes visible all the work to meet the sprint goal.
  •   Must have at least one improvement plan identified in previous sprint retrospective.
  •  Only the development team manages the sprint backlog.
  •  It must represent a live picture of the work done and remaining.
  •  All items must meet the definition of done before are considered finished
  •  Promotes and supports the scrum process.
  •  Helps everybody to understand the Scrum theory, practices, rules and values.

Helps product owner to:

  •   Ensure that goals, scope and domain are understood by everyone.
  •  Find techniques to maintain product backlog effectively.
  •  Facilitate scrum events as requested or needed.

Helps development team to:

  •  Remove progress blockers.
  •  Facilitates scrum events as requested or needed.

Helps the organization to:

  •   Lead and coach in scrum adoption.
  •  Work with other scrum masters to increase scrum effectiveness.
Sprint Planning
  •  
Duration
  • 45
min
  •  Frequency - once every two weeks
  •  PO sets the Sprint goals
  •  Development team does estimation for the stories for the sprint
  •  Scrum Master prepares the presentation for Demo, retro,  Planning and reports
  •  Scrum Master reviews the backlog with PO and sprint goals before Sprint Planning
  •  Scrum Master ensures that the capacity is at 80% to provide bandwith for the sprint
  •  Scrum Master is facilitating the meeting and ensures that timebox is respected
  • mins
  •  The Product Owner must set a sprint goal.
Scrum daily
  •   The duration is 15 minutes.
  •  It is held every day.
  •  Detailed discussions, adaptations, re-planning are outside this meeting.
  •  The scrum master ensures that the meeting takes place.
  •  The development team conducts the meeting.
Sprint review
  •  30 minutes
  •  The product owner reviews what has been "Done" and what has not been "Done".
  •   The product backlog is reviewed.
Sprint retrospective
  •  20 minutes
  •  It takes place after the sprint review and before the sprint planning.
  •  The meeting is positive and productive.
  •  Create a plan to improve how the scrum team works.
  •   The product owner and Data Scientists are responsible for its content, availability and ordering.
  •  Product backlog refinement  takes place iteratively.
  •  The items on top (higher priority) must be clear and meet the definition of ready

PCF Jira BoardPCF Team Composition



  •  Has consistent durations. (starts on mondays - ends on fridays)
  •  New sprints start immediately after the previous concludes is (true)
  •   A sprint goal is always set and is (in Jira Sprint goals) 
  •   Makes visible all the work to meet the sprint goal.
  •   Must have at least one improvement plan identified in previous sprint retrospective.
  •  Only the development team manages the sprint backlog.
  •  It must represent a live picture of the work done and remaining.
  •  All items must meet the definition of done before are considered finished
  •  Promotes and supports the scrum process.
  •  Helps everybody to understand the Scrum theory, practices, rules and values.

Helps product owner to:

  •   Ensure that goals, scope and domain are understood by everyone.
  •  Find techniques to maintain product backlog effectively.
  •  Facilitate scrum events as requested or needed.

Helps development team to:

  •  Remove progress blockers.
  •  Facilitates scrum events as requested or needed.

Helps the organization to:

  •   Lead and coach in scrum adoption.
  •  Work with other scrum masters to increase scrum effectiveness.
Sprint Planning
  •  1 hour
  •  The Product Owner must set a sprint goal.
Scrum daily
  •   The duration is 15 minutes.
  •  It is held every day.
  •  Detailed discussions, adaptations, re-plannings are outside this meeting.
  •  The scrum master ensures that the meeting takes place.
  •  The development team conducts the meeting.
Sprint review
  •  1 hour
  •  The product owner reviews what has been "Done" and what has not been "Done".
  •   The product backlog is reviewed.
Sprint retrospective
  •  1h30
  •  It takes place after the sprint review and before the sprint planning.
  •  The meeting is positive and productive.
  •  Create a plan to improve how the scrum team works.
  •   The product owner is responsible for its content, availability and ordering.
  •  Product backlog refinement  takes place iteratively.
  •  The items on top (higher priority) must be clear and meet the definition of ready

Squad Names

  • Lead & Sample


This team will no longer exist

Lead & Sample

Jira Board


Image Added


















  •  Has consistent weeks duration. (starts on Monday- ends on Friday)
  •  New sprints start immediately after the previous concludes is (true)
  •   A sprint goal is always set and is (tracked in Jira) 
  •   Makes visible all the work to meet the sprint goal.
  •   Must have at least one improvement plan identified in previous sprint retrospective.
  •  Only the development team manages the sprint backlog.
  •  It must represent a live picture of the work done and remaining.
  •  All items must meet the definition of done before are considered finished
  •  Promotes and supports the scrum process.
  •  Helps everybody to understand the Scrum theory, practices, rules and values.

Helps product owner to:

  •   Ensure that goals, scope and domain are understood by everyone.
  •  Find techniques to maintain product backlog effectively.
  •  Facilitate scrum events as requested or needed.

Helps development team to:

  •  Remove progress blockers.
  •  Facilitates scrum events as requested or needed.

Helps the organization to:

  •   Lead and coach in scrum adoption.
  •  Work with other scrum masters to increase scrum effectiveness.
Sprint Planning
  •  1 hour
  •  The Product Owner must set a sprint goal.
Scrum daily
  •   The duration is 15 minutes.
  •  It is held every day.
  •  Detailed discussions, adaptations, re-plannings are outside this meeting.
  •  The scrum master ensures that the meeting takes place.
  •  The development team conducts the meeting.
Sprint review
  •  1 hour
  •  The product owner reviews what has been "Done" and what has not been "Done".
  •   The product backlog is reviewed.
Sprint retrospective
  •  1h
  •  It takes place after the sprint review and before the sprint planning.
  •  The meeting is positive and productive.
  •  Create a plan to improve how the scrum team works.
  • The product owner is responsible for its content, availability and ordering.
  • Product backlog refinement  takes place iteratively.
  • The items on top (higher priority) must be clear and meet the definition of ready

Technical Excellence Squad

BENETT-ext, Lou-Ann 

TechEx

Jira Board

Maintenance - Technical Excellence 


Image Added


Tech Ex Mission statement is to work on Technical improvements based on release, make the system robust and align with Salesforce guidelines


The team of Lou is the RUN team. With the managed services an outsourced provider.


Dina Mendes - Proxy PO

Julien Gasqueton - Security Lead & Analyst

Mohan Devarapu - Tech Lead & Analyst

Artur Alves - Tech Lead for Managed Services (CGI)

Bartosz Borowiec - Architect / Developer

Lukasz Kiwinski - Advance Administrator / Developer

Manuel-Moya Ferrer - DevOps

Valeriya KHrebtova - Release Manager & DevOps

Lou-Ann Benett - Scrum Master


  •  Has consistent duration. (2 week/starts on Monday - ends on Friday)
  •  New sprints start immediately after the previous concludes is (true)
  •   A sprint goal is always set and is (WIP) 
  •  Makes visible all the work to meet the sprint goal.
  •   Must have at least one improvement plan identified in previous sprint retrospective.
  •  Only the development team manages the sprint backlog.
  •  It must represent a live picture of the work done and remaining.
  •  All items must meet the definition of done before are considered finished
  •  Promotes and supports the scrum process.
  •  Helps everybody to understand the Scrum theory, practices, rules and values.

Helps product owner to:

  •   Ensure that goals, scope and domain are understood by everyone.
  •  Find techniques to maintain product backlog effectively.
  •  Facilitate scrum events as requested or needed.

Helps development team to:

  •  Remove progress blockers.
  •  Facilitates scrum events as requested or needed.

Helps the organization to:

  •   Lead and coach in scrum adoption.
  •  Work with other scrum masters to increase scrum effectiveness.

 Sprint Planning

  •  1 hour
  •  The Product Owner must set a sprint goal.
Scrum daily
  •   The duration is 15 minutes.
  •  It is held every day.
  •  Detailed discussions, adaptations, re-planning are outside this meeting.
  •  The scrum master ensures that the meeting takes place.
  •  The development team conducts the meeting.
Sprint review
  •  1 hour
  •  The product owner reviews what has been "Done" and what has not been "Done".
  •   The product backlog is reviewed.Sprint retrospective
    •  1h
    •  It takes place after the sprint review and before the sprint planning.
    •  The meeting is positive and productive.
    •  Create a plan to improve how the scrum team works.
  •   The product owner is responsible for its content, availability and ordering.
  •  Product backlog refinement  takes place iteratively.
  •  The items on top (higher priority) must be clear and meet the definition of ready

CRM Services

CRM Services

Jira Board

Maintenance - CRM Services 




Susana Alves - Lead Business Analyst

Leila Radjah - Business Analyst

Nina Song - Business Analyst (Dedicated)

Nikola Milic - Business Analyst (Dedicated)

Helia Grilo - Lead Developer for Managed Services (CGI)

Dina Mendes - Architect

Josiane Peytraud - Lead Business Analyst

Sandra Martins - Business Analyst

Simona Roman-Croitoru - Technical Analyst

Artur Alves - Tech Lead for Managed Services (CGI)

Marta Machado - Lead Developer for Managed Services (CGI)

Lou-Ann Benett - Scrum Master

Image Added


  •  Has consistent duration. (starts on Monday - ends on Friday)
  •  New sprints start immediately after the previous concludes is (true)
  •   A sprint goal is always set and is (WIP) 
  •  Makes visible all the work to meet the sprint goal.
  •   Must have at least one improvement plan identified in previous sprint retrospective.
  •  Only the development team manages the sprint backlog.
  •  It must represent a live picture of the work done and remaining.
  •  All items must meet the definition of done before are considered finished
  •  Promotes and supports the scrum process.
  •  Helps everybody to understand the Scrum theory, practices, rules and values.

Helps product owner to:

  •   Ensure that goals, scope and domain are understood by everyone.
  •  Find techniques to maintain product backlog effectively.
  •  Facilitate scrum events as requested or needed.

Helps development team to:

  •  Remove progress blockers.
  •  Facilitates scrum events as requested or needed.

Helps the organization to:

  •   Lead and coach in scrum adoption.
  •  Work with other scrum masters to increase scrum effectiveness.

Sprint Planning

  •  1 hour
  •  The Product Owner must set a sprint goal.
Scrum daily
  •   The duration is 15 minutes.
  •  It is held every day.
  •  Detailed discussions, adaptations, re-plannings are outside this meeting.
  •  The scrum master ensures that the meeting takes place.
  •  The development team conducts the meeting.
Sprint review
  •  1 hour
  •  The product owner reviews what has been "Done" and what has not been "Done".
  •   The product backlog is reviewed.
Sprint retrospective
  •  1h
  •  It takes place after the sprint review and before the sprint planning.
  •  The meeting is positive and productive.
  •  Create a plan to improve how the scrum team works.
  • The product owner is responsible for its content, availability and ordering.
  • Product backlog refinement  takes place iteratively.
  • The items on top (higher priority) must be clear and meet the definition of ready

Squad - MSP team

Scrum Master - LYAKH-ext, Marina 

MSP Jira board

MSP team mission is to provide customers with innovative and user friendly tools that will ease their digital journey and help company to save time and money while working together as a team and having fun in a process.

Squad composition (invited in all Scrum events):

  • Product Owner - Aude Trepier
  • Project manager - Jessica Ternier (data tasks related with PIM)
  • Lead Analyst - Gonçalo Silva
  • Developer - Andre Vieira
  • Developer - Jose Fischer (split 50/50 with Lead&Sample team)
  • Scrum Master - Marina Lyakh

Team participants on request:

  • Architect - Dina Mendes
  • Tech Lead - Mohan Devarapu
  • Security - Julien Gasqueton
  • Release Manager - Valeria Khrebtova



  •  Has consistent durations. (starts on Monday - ends on Friday)
  •  New sprints start immediately after the previous concludes is (true)
  •   A sprint goal is always set and is (in Jira and Miro) 
  •  Makes visible all the work to meet the sprint goal.
  •   Must have at least one improvement plan identified in previous sprint retrospective.
  •  Only the development team manages the sprint backlog.
  •  It must represent a live picture of the work done and remaining.
  •  All items must meet the definition of done before are considered finished
  •  Promotes and supports the scrum process.
  •  Helps everybody to understand the Scrum theory, practices, rules and values.

Helps product owner to:

  •   Ensure that goals, scope and domain are understood by everyone.
  •  Find techniques to maintain product backlog effectively.
  •  Facilitate scrum events as requested or needed.

Helps development team to:

  •  Remove progress blockers.
  •  Facilitates scrum events as requested or needed.

Helps the organization to:

  •   Lead and coach in scrum adoption.
  •  Work with other scrum masters to increase scrum effectiveness.
Sprint Planning
  •  1 hour
  •  The Product Owner must set a sprint goal.
Scrum daily
  •   The duration is 15 minutes.
  •  It is held every day.
  •  Detailed discussions, adaptations, re-plannings are outside this meeting.
  •  The scrum master ensures that the meeting takes place.
  •  The development team conducts the meeting.
Sprint review
  •  1 hour
  •  The product owner reviews what has been "Done" and what has not been "Done".
  •   The product backlog is reviewed.
Sprint retrospective
  •  1h
  •  It takes place after the sprint review and before the sprint planning.
  •  The meeting is positive and productive.
  •  Create a plan to improve how the scrum team works.
  •   The product owner is responsible for its content, availability and ordering.
  •  Product backlog refinement  takes place iteratively.
  •  The items on top (higher priority) must be clear and meet the definition of ready

Scrum Dailys

  •  Duration 15 min
  •  Frequency - everyday, except the days of Demo, retro and Planning
  •  Scrum Master is making team is attending
  •  Scrum Master facilitates the meeting and helps the team gets focus on the topics at hand
  •  Development team talks about the work from the day before, the day of and the day after
  •  Development team expresses any blockers they may have encountered
  •  Scrum team is ensuring that there is transparency on the blockers
  •  Scrum Master ensures timebox is respected

Backlog Refinement

  •  Duration - 45 min
  •  Frequency - once a week
  •  POs review the stories from the backlog based on complexity with Development team for future Sprints
  •  Scrum Masters ensure that the meeting stays on topic and timebox is respected
  •  Based on the Stories, BAs and Devs provide high estimation to be reviewed during Sprint Planning
  •  Scrum Team ensures that stories are under Qualified status before the sprint starts

Sprint Demo / Review

  •  Duration 45 min
  •  Frequency - Once every 2 weeks
  •  The product owner reviews what has been "Done" and what has not been "Done".
  •   The product backlog is reviewed.
  •   

Sprint Retrospective

  •  Duration 45 min
  •  It takes place after the sprint review and before the sprint planning.
  •  The meeting is positive and productive.
  •  Create a plan to improve how the scrum team works.
  •  Scrum Master ensures that the environment is safe for the team to express their feedbacks and concerns
  •  Scrum Master ensures that there is transparency and timebox is respected
  •  Scrum Master ensures that previous actions agreed on from previous goals have been implemented
  •   The product owner is responsible for its content, availability and ordering.
  •  Product backlog refinement  takes place iteratively.
  •  The items on top (higher priority) must be clear and meet the definition of ready

Squad - MSP team

Scrum Master - LYAKH-ext, Marina 

MSP Jira board

MSP team mission is to provide customers with innovative and user friendly tools that will ease their digital journey and help company to save time and money while working together as a team and having fun in a process.

Squad composition (invited in all Scrum events):

  • Product Owner - Aude Trepier
  • Project manager - Jessica Ternier (data tasks related with PIM)
  • Lead Analyst - Gonçalo Silva
  • Developer - Andre Vieira
  • Developer - Jose Fischer (split 50/50 with Lead&Sample team)
  • Scrum Master - Marina Lyakh

Team participants on request:

  • Architect - Dina Mendes
  • Tech Lead - Mohan Devarapu
  • Security - Julien Gasqueton
  • Release Manager - Valeria Khrebtova
  •  Has consistent durations. (starts on Monday - ends on Friday)
  •  New sprints start immediately after the previous concludes is (true)
  •   A sprint goal is always set and is (WIP)