Versions Compared
compared with
Key
- This line was added.
- This line was removed.
- Formatting was changed.
| Status | ||||
|---|---|---|---|---|
|
- Use transaction MM03
- Click
Image Modified to display the organization level and click
Image Modified beside the plant code - The list of plants is displayed => The material code 92618 exists in 5 plants
- If the material 92618 is not produced in the plant 7777 is can be procured externally or in another plant in WP1 listed below :
- 7512 ZFR3 Clamecy
- 7622 ZFR3 Collonges
- 7714 7418 / Nippon Express - AOMI
- 7806 7418 / Nippon Express Yamashit
Image Modified
| Status | ||||||
|---|---|---|---|---|---|---|
|
- The existing procurement code C3 should be removed or replaced as it refers to a plant 7605 Incheon in which the material code 92618 was not created
Image Modified
| Viewtracker | ||
|---|---|---|
|