Versions Compared
compared with
Key
- This line was added.
- This line was removed.
- Formatting was changed.
| Status | ||||
|---|---|---|---|---|
|
- Use transaction MM03
- Enter the material code and
Image Modified
Image Modified
| Status | ||||||
|---|---|---|---|---|---|---|
|
- Select the view "MRP2" and
Image Modified
Image Modified
| Status | ||||||
|---|---|---|---|---|---|---|
|
- Enter the plant code and
Image Modified
Image Modified
| Status | ||||||
|---|---|---|---|---|---|---|
|
- The special procurement code is C3
Image Modified
| Status | ||||||
|---|---|---|---|---|---|---|
|
- Click on the code and
Image Modified to have the description of the code - The code C3 means that the material 92618 comes from the plant 7605 Incheon
Image Modified
| Viewtracker | ||
|---|---|---|
|