Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: sophie.declaviere@solvay.com added in the list of contacts

...

This document's objective is to provide a guide to managing Material master data ZVER and ZUNB materials.

This document is a complement to Standard Operating Procedure "Article Creation and Management", adapting the process to ZVER and ZUNB Material ZVER Material master data management for GBU Technology Solutions (Legacy Cytec organization).

...

Requests of Material Master creation or maintenance can be performed by approved requestors listed in Appendix 2 Appendix 1 - List of contacts.

For Composite Materials, the request will be sent via Sharepoints, in this case no additional approval is required.

All requests are sent to Master Data via Freshdesk or alternatively by e-mail. Common e-mail address of Riga SBS Data Management team: datamanage@solvay.com

Request form for packaging should usually be provided by requester. Link The link to the form can be found in Google Documents Template for RM and Packaging

For Composite Materials, there is a template which is combined with ZMAT materials and will be provided in the Sharepoints/Freshdesk request.

The referral lists mentioned in this procedure, such as Purchasing Groups and Profit Center List are embedded in the TS SAP Material request form file

...

Under Riga SBS Data Management's scope is the management of ZPRC, ZMAT, ZVER and ZUNB materials for GBU Technology Solutions and Composite Materials Solutions (legacy Cytec) sites in WP1 SAP system. Management of ZERS and ZMAT materials is described in a separate procedure. Riga SBS Data Management can create and extend ZDIE materials if requested so by Finance.

...

ZVER setup can be performed only once MOC-ID code is available.
Prior to submitting a new ZVER/ZUNB request, ZVER request, it is the requester´s responsibility to ensure the material does not exist in SAP already, so no duplicates are created in the system. If the material was not found, the TS SAP Material request form must be filled and submitted to Data Management for material master setup in SAP. A second search in the system is performed by the Data Management team to ensure no duplicates are created.

...

  • The plant to which the raw material will be created
  • The Impacted Business Unit (this information will be used to determine the profit center and purchase group).


Completed The completed Packaging request form should be attached for all ZVER codes. ZVER description must follow
Packaging rules table which can be found here - Packaging Instructions

2.1.1.2 Checking for duplicates

...

Main activities

Tips / Best practices

Key points1

Enter transaction MM03

T-code can be entered directly in Command field. T-code can be saved in Favorites.

Full path: Logistics -> Materials Management -> Material master -> Material -> Display

#

Main activities

Tips / Best practices

Key points

2

Press multiple choice button to receive pop-up window with search options for material master



#

Main activities

Tips / Best practices

Key points3

Click on to open the menu



4

Select the option 'Material Number/Material Description'

Field 'Old material number' can be used to look up material by BPCS Code (temporarily).



#

Main activities

Tips / Best practices

Key points

5

Run a search in Material Description

Use Wildcards to best describe

Open the material request form, copy the short text from the requested material and run a search in Material description with wildcards.6

Hit Enter



#

Main activities

Tips / Best practices

Key points7

Verify entries found – compare results with the material's "short description" mentioned in the request form. If you have doubts about the material already created, contact the Requester to clarify.


If result points to or if the Requester mentions a new article need to be created then proceed with the creation.

...

Main activities

Tips / Best practices

Key points

Select Views to be created

Creation of views can be performed all at once or in separate steps

Technology Solutions

  • See Appendix 3 - List of single Storage locations can be found in Appendix 3
  • Sales Organization and Distribution Channel should not be filled by creation.

NOTE! Warehouse Management 1 & 2 Views to be created and warehouse number added (in brackets) for warehouse managed plants only:
8520 (077), 8521 (054), 8712 (C26), 8636 (K19) – by default.
For 8359 - only if requested.

Composite Materials

Always extend to Warehouse based on the file per plant


Hit Enter

Use Default Setting button to save your selections for future creations


...

Fill in Organizational LevelsKey points

Technology Solutions

  • Fill Plant as indicated in the request
  • Extend to Storage Location when there is only one option per plant (Storage location number is the same as plant number). If there is more than one option, leave it blank.
  • Sales Organization and Distribution Channel should not be filled by material creation but can be requested upon plant extension.

Composite Materials

  • Plant: as indicated in request form 
  • Storage Location: check the GBU Composite Materials file and open the material for the active (not scratched) storage locations correspondent to each plant that does not have an "X" in the spare column.
  • Sales Organization/Distribution channel: open only to the Intercompany Sales Organization listed with an "X" at the Distribution channel 0A on the GBU Composite Materials file.
    • See example below for plant 8350: the material should be created/extended to Sales Organization GB40 and US37 / Distribution channel 0A

Image Removed

  • Warehouse: Open to correspondent warehouse listed on the GBU Composite Materials file 
Hit Enter

Image Removed

...

Main activities

...

Tips / Best practices

...

Key points

...

Enter Packaging Description

...

Check the request form for "SHORT DESCRIPTION"

...

Use the Composite Materials Naming Conventions file to validate the description.

...

Enter Base Unit of Measure

...

Enter Material Group

...

Enter Division

...

Always WD

...

Enter General Item Category Group

...

Always VERP

...

Enter UoM for Weight

...

Always KG

...

  • Check the request form
    • If Gross weight is provided, copy from the template
    • If the Gross weight is not provided 0,010
    • For pallets we should have the gross weight specified

...

  • Check the request form
    • If Net weight is provided, copy from the template
    • If the Net weight is not provided 0,010
    • For pallets we should have the gross weight specified

...

Go to Descriptions tab

...

From Basic Data View Descriptions tab can be accessed by pressing Additional Data button in the top part of screen as well. Tabs in Additional Data can be filled in any sequence.

Hit Enter



Image Added

Main activities

Tips / Best practices

Key points

Enter Packaging Description

Check the request form for "SHORT DESCRIPTION"

Should be checked whether description meets Packaging instructions. [Packaging name + dimensions + capacity + specific characteristics (if exists)].

Enter Base Unit of Measure


Always PC (Pieces)

Enter Material Group


Should be checked by type of packaging in Packaging Instructions table.

Enter Division


Always WD

Enter General Item Category Group


Always VERP

Enter UoM for Weight


Always KG

Go to Descriptions tab

From Basic Data View Descriptions tab can be accessed by pressing Additional Data button in the top part of screen as well. Tabs in Additional Data can be filled in any sequence.



Image Added


Main activities

Tips / Best practices

Key points

Enter material descriptions in local languages

Request for should be checked for descriptions in other languages e.g.

ZH – Chinese might be indicated in original language.

12 mandatory languages are:
EN – English
Z9 – Brazilian Portuguese
ZH – Chinese
KO – Korean
DE – German
FR – French
IT – Italian
JA – Japanese
PL – Polish
PT – Portuguese
ES – Spanish
NL – Dutch

Return to Main Data




Image Added


Main activitiesKey points
Alternative units of measure

Request the PC to KG conversion (mandatory)

Go to Basic data 2


Image Added

...

Main activities

Tips / Best practices

Key points

Go to Basic data 2 view



Enter Basic material descriptions in local languages

Request for should be checked for descriptions in other languages e.g.

ZH – Chinese might be indicated in original language.

12 mandatory languages are:
EN – English
Z9 – Brazilian Portuguese
ZH – Chinese
KO – Korean
DE – German
FR – French
IT – Italian
JA – Japanese
PL – Polish
PT – Portuguese
ES – Spanish
NL – Dutch

Return to Main Data

Image Removed

...

Request the PC to KG conversion (mandatory)

...

  • Default conversion should be added for all packaging materials 1EA = 1PC
  • If the packaging type is pallet, weigh conversion (KG) should be provided
    • Proportion: Weight Unit (KG) → Base unit of measure 
  • Copy from the template if any additional conversion is specified

A) When the net weight and gross weight are not provided and we defaulted to 0,010:
For Alternative UoM conversion to weight it should be 1 KG = 100 PC

B) When the net weight and gross weight are provided:
Calculate the inverse by dividing 1 to that weight: 1/0,029 = 34.48275862068966. It is the number how many Pieces are in 1 KG. Use the template table to calculate Denominator and Numerator:

Image Removed

Populate Alternate Uom conversion:
Image Removed

Generic ZPRC number for all ZVER materials

Always 90029754

Go to Sales: general/plant view




Image Added

Main activities

Tips / Best practices

Key points

Enter Availability check


Always 02

Enter Transportation Group


Always 0001

Enter Loading Group


Always 0001

Packaging Mat type

Entered only for Pallets

0001

Enter Profit Center


List of profit centers can be found in the following link.

Go to Purchasing view




Image Added

Main activities

Tips / Best practices

Key points

Enter Purchasing Group


List of purchasing groups can be found in following ZVER Purchasing Groups


Enter Plant-specific material status

Once Finance creates Accounting and Costing Views and performs material costing run, the status will be removed by Finance to allow use of material in operations.

Status Z1 is to be used at the time of material creation.

Activate automatic Purchase Order indicator


Always checked

Enter Purchasing value key


Always 0001

Enter GR processing time

Plant data administrators will change the field value if necessary

Default value at the time of material creation – 2

Go to next view

Plant data / storage 1 view



Image Added

...

Image Removed

Use Image Removed button to add languages
Copy English text to all other languages:
Image Removed

Main activities

Tips / Best practices

Key points

For Composite - material long description (copy from the form).

If not provided copy the short description

12 mandatory languages are:
1 – Chinese (EN!)
E – English
F – French
D – German
I – Italian
J – Japanese
3 – Korean
L – Polish
P – Portuguese
S – Spanish
& – Brazilian Portuguese
N – Dutch

Return to Main Data

Image Removed

...

Main activities

...

Tips / Best practices

...

Key points

...

Go to Basic data 2 view

...

Enter Basic material

...

Generic ZPRC number for all ZVER materials

...

Always 90029754

Enter Physical inventory indicator for cycle counting

Plant data administrators will change the field value if necessary

Default value at the time of material creation – B


Go to Plant data / storage 2 view

Nothing should be entered as Profit center data are being copied from Sales: general/plant view


Save material

Image Added



Technology Solutions

After material code is created Finance and Planning teams from the appropriate plant should be informed to create missing views, contacts can be found in TS MM Support Organization file. Also include costing team sbs_riga_rtr_costing@solvay.com

Template

Dear (Requester's name),

Please be informed that the material (number) (description) has been (created/extended) for plant (number).

Dears,

Could you please complete necessary views for material set up (MRP, Acct, Costing)?

  • Material (number) (description)
  • MOC (number)
  • Documentation from MOC

Kind regards,


2.1.3. Extension of material

Following MOC procedure plants are obligated to review the existing MOC process every two to three years, therefore valid MOC ID is mandatory component for Packaging extension, this information should be provided by requester any time material should be created for a new plant.Lindsay Schramm should be contacted in case of missing MOC-ID.

NOTE: Raw Materials and Packaging should not be extended to Trading plants (8572 – MX, 8573 – CL, 8571 – PE, 8580 – NL, 7788 – ID, 7786 – AU, 8574 - CN).


To extend material enter transaction MM01. Copy from… option can be used, preferably to copy from an existing view of the same material.


Image Added


To extend ZVER material to a Plant, select Sales: General/Plant Data, Purchasing, General Plant Data/Storage 1 & 2, Warehouse Management 1 & 2.


Image Added

2.1.4. Extension of Technology Solutions Materials to Sales Organization view

Should be extended only to Intercompany Distribution Channel (9O)

Image Added

Main activities

Tips

...

Go to Sales: general/plant view

For Composite Materials

Image Removed

Main activities

Tips

/ Best practices

Key points

Enter Cross-distribution-chain specific material status


Status 63 is to be set at the moment of material creation to allow use of material in operations

Enter Valid from date for Cross-distribution-chain specific material status

DD.MM.YYYY


Maintain Tax classifications

System will automatically determine which Countries' tax lines should be added

Always 1 for all countries unless otherwise indicated by Finance or Tax department

Go to Sales: sales org. 2 view

Image RemovedImage Added

Enter Material statistics group

Main activities

Tips / Best practices

Key points

Always 1

Enter Account assignment group

Check the request form, if not provided populate with Fpackaging type:
F - Pallet (Consumable)
I - Drum, pail, Tote (IBC), Bag, Box

Enter Item category group

Always ZVRP

Save the extension

...

Main activities

...

Tips / Best practices

...

Key points

...

Enter Availability check

...

Technology Solutions: Always 02

Composite Materials: Always KP

Always VERP

Note! Check if the packaging has the weight conversion in the Alternatives units of measure, if is not add the default 1PC ↔ 1 KG
Save the extension


2.2. Material modification

2.2.1. Pre-requisites

Material modification is allowed only if validated by all Plants using the material.
Requests to change Base unit of Measure must not be performed – in this case a new material has to be created.
Another exception can be a mistake for recently created material that has not yet had any stock and stock movements in the system.


Image Added

Main activities

Tips

...

Enter Transportation Group

...

Always 0001

...

Enter Loading Group

...

Always 0001

...

Packaging Mat type

...

Entered only for Pallets

...

0001

...

Enter Profit Center

...

Technology Solutions: List of profit centers can be found in following link.

Composites Materials: Check the request form

...

Go to Purchasing view

...

Tips

Main activities

/ Best practices

Key points

Enter Purchasing Group

Technology Solutions: List of purchasing groups can be found in following ZVER Purchasing Groups

Composite Materials: Check the request form

Enter Plant-specific material status

Once Finance creates Accounting and Costing Views and performs material costing run, the status will be removed by Finance to allow use of material in operations.

Status Z1 is to be used at the time of material creation.

Activate automatic Purchase Order indicator

Always checked

Enter Purchasing value key

Always 0001

Enter GR processing time

Plant data administrators will change the field value if necessary

Default value at the time of material creation – 2

Go to next view

Plant data / storage 1 view

...

Main activities

...

Tips / Best practices

...

Key points

...

Enter Physical inventory indicator for cycle counting

...

Plant data administrators will change the field value if necessary

...

Technology Solutions: Default value at the time of material creation – B

Composite Materials: Check the request form

...

Go to Plant data / storage 2 view

...

Nothing should be entered as Profit center data are being copied from Sales: general/plant view

...

Save material

...

Image Removed

...

For packaging creation and extension, if the information is provided in the material form, the PIR and Source List should be created within the same request.

  • Remove the Z1 block
  • Create the PIR and Source List by following the procedure in SAP WP1 Contract & PIR Maintenance Work Instruction 
  • Add the Z1 block back
  • Complete the Sharepoints request

...

After material code is created Finance and Planning teams from appropriate plant should be informed to create missing views, contacts can be found in TS MM Support Organization file. Also include  include costing team sbs_riga_rtr_costing@solvay.com

Template

...

  • Material (number) (description)
  • MOC (number)
  • Documentation from MOC

Kind regards,

transaction MM03

T-code can be entered directly in Command field. T-code can be saved in Favorites.

Full path: Logistics -> Materials Management -> Material master -> Material -> Display


Image Added

Main activities

Tips / Best practices

Key points

Enter Material number



Select Purchasing (or Sales: General/Plant Data) view




Image Added

Main activities

Tips / Best practices

Key points

Verify the possible Plants related to the Material by clicking on the match code.



All Plants using the material are listed




If material is open for more than one Plant, contact the other Plants to validate the requested modification.

If the answer is positive, change the material as shown in section 2.2.2. Manual modification of material.

If the answer is negative, create a new material as described in Chapter 2.1.2. of this OP, associated with the Plant that made the request.

2.3.2. Manual modification of material

Image Added

Main activities

Tips / Best practices

Key points

Enter transaction MM02

T-code can be entered directly in Command field. T-code can be saved in Favorites.

Full path: Logistics -> Materials Management -> Material master -> Material -> Change

Select the view containing the field that needs modification



Select the Organizational Level for which the modification is requested

Repeat the modification for all Sales Areas or Plants if applicable.


Save the changes performed




Appendix 1 – List of contacts

Requests for Packaging requests can be accepted from Purchasing representative.
Detailed Technology Solutions Support Organization file by plants can be found in following link.

 Region

Representative

Email

US and Canada





Vanessa Scott

vanessa.scott@solvay.com

Leslie Fleming

leslie.fleming@solvay.com

Peter Mertzanispeter.mertzanis@solvay.com

Thierry Leclerc

thierry.leclerc@solvay.com

Mario Bruins

mario.bruins@solvay.com

LAM

Abril Gomez (Maternity leave)

Replacement: Vincent Cifelli and Eduardo Rubalcaba Guizar

abril.gomez@solvay.com
Vincent.Cifelli@solvay.com
eduardo.rubalcabaguizar@solvay.com

APAC





Natpapan Chueakongtrakul (Poon)

natpapan.chueakongtrakul@solvay.com

Celine Koh

celine.koh@solvay.com

Catherine Lu

catherine.lu@solvay.com

Sorrawit Parknondhkul

sorrawit.parknondhkul@solvay.com

Nathan Purvis

nathan.purvis@solvay.com

EMEA

Thierry Leclerc

thierry.leclerc@solvay.com

Sophie DeClavieresophie.declaviere@solvay.com

ZPRC/MOC

HazCom

hazcom.rawmat@solvay.com

MOC-ID

Lindsay Schramm

Lindsay.schramm@solvay.com

Appendix 2 – List of Plants in non-GTS countries


Whenever a material is extended to any of non-GTS plants, extension has to be added in a file to notify the responsible team. Location of the file.

Country

Plant Code

Description

Japan

8524

7418 / Gas Chem Logistic Osaka

Singapore

8506

6062 / Poh Tiong Choon Jurong


Appendix 3 – List of Single Storage Locations

Storage Location

Description

8380

7786 / JF Hillebrand Fremantle

8433

7788 / Jakarta

8496

7722 / BDP Peru Arequipa

8500

7725 / Andimex San Antonio

8503

7988 / Daesung Whse Yangsan

8505

7723 / FH Logist Azcapotzalco

8506

6062 / Poh Tiong Choon Jurong

8507

7725 / Sercabol Antofagasta

8508

7776 / Sinotrans Intl Shanghai

8509

7734 / KWE Logistics Shanghai

8511

7794 / CML Ltd Walvis Bay

8515

7786 / Toll Contr Laverton Nth

8519

7786 / NSS Port Sth Townsville

8520

7008 / XPO Logistic Bristol

8521

7008 / XPO Logistic La Porte

8527

7794 / Schenker Kempton Park

8528

7734 / Sinotrans Intl Shanghai

8543

7008 / KEMIRA WATER MOBILE

8545

7008 / FLUID ENERGY HATFIELD

8548

7008 / MOBILE SOLVENT EIGHT MILE

8549

7752 / NOVA MOLECULAR PASADENA

8553

7008 / SOUTH COAST HOUSTON

8554

7008 / SPRAY TEK MIDDLESEX

8559

7008 / TOLL COMPACTION NEPTUNE

8589

7734 / Tianjin DLD Beicheng Wh

8605

7794 / Kemira Chem Bradford

8614

7734 / COSCO Logistic Tianjin

8617

7776 / COSCHEM Logist Shanghai

8618

7794 / Praxair Oevel-Westerlo

Appendix 4 – Sinequa

Link to Sinequa Portal
Image Added

...

Following MOC procedure plants are obligated to review existing MOC process every two to three years, therefore valid MOC ID is mandatory component for Packaging extension, this information should be provided by requester any time material should be created for a new plant.

...

2.1.4. Extension of Technology Solutions Materials to Sales Organization view

Should be extended only to Intercompany Distribution Channel (9O)

Image Removed

...

#

...

Main activities

...

Tips / Best practices

...

Key points

...

1

...

Enter Cross-distribution-chain specific material status

...

Status 63 is to be set at the moment of material creation to allow use of material in operations

...

2

...

Enter Valid from date for Cross-distribution-chain specific material status

...

DD.MM.YYYY

...

3

...

Maintain Tax classifications

...

System will automatically determine which Countries' tax lines should be added

...

Always 1 for all countries unless otherwise indicated by Finance or Tax department

...

Image Removed

...

#

...

Main activities

...

Key points

...

5

...

Enter Account assignment group

...

Check the packaging type:
F - Pallet (Consumable)
I - Drum, pail, Tote (IBC), Bag, Box

...

6

...

Enter Item category group

...

Always VERP

...

Requester should provide us with correct Description and Plant where material should be created. 

2 types of ZBOM:

  • Packaging Kits (BUOM EA - Division WD) → assemble from 2 parts of packaging (combination, not consumed, is is a steps in the process, does not have inventory)
  • Pre-mixes (BUOM EA - Division provided) → materials which are being used for BOMs 

Image Removed

...

#

...

Main activities

...

Tips / Best practices

...

Key points

...

1

...

Enter transaction MM01

...

T-code can be entered directly in Command field. T-code can be saved in Favorites.

...

Full path: Logistics -> Materials Management -> Material master -> Material -> Create (General)

Image Removed

...

#

...

Main activities

...

Tips / Best practices

...

Key points

...

2

...

Enter Industry Sector

...

Always choose “Chemical Industry”

...

3

...

Enter Material Type

...

Always ZBOM for Phantom assemblies

...

4

...

Copy from… Material

...

Option to copy data from an existing material can be useful in some cases.

...

5

...

Hit Enter

Image Removed

...

#

...

Main activities

...

Tips / Best practices

...

Key points

...

6

...

Select Views to be created

...

Creation of views can be performed all at once or in separate steps

...

Select Basic Data 1, Basic Data 2, MRP 1, MRP 2, MRP 3, MRP 4,

Sales Organization and Distribution Channel should not be filled.

...

7

...

Hit Enter

...

Use Default Setting button to save your selections for future creations

Image Removed

...

#

...

Main activities

...

Tips / Best practices

...

Key points

...

8

...

Fill in Organizational Levels

...

Sales Organization and Distribution Channel should not be filled.

...

Fill Plant as indicated in request. 

...

9

...

Hit Enter

...

 

Image Removed

...

#

...

Main activities

...

Tips / Best practices

...

Key points

...

10

...

Phantom Description

...

Check the request

...

11

...

Base Unit of Measure

...

Copy from the form

...

12

...

Material Group

...

Always 0450

...

13

...

Division

...

Copy from the form

...

16

...

UoM for Weight

...

Always KG

...

17

...

Go to Descriptions tab

...

From Basic Data View Descriptions tab can be accessed by pressing Additional Data button in the top part of screen as well. Tabs in Additional Data can be filled in any sequence.

...

 

Image Removed

...

#

...

Main activities

...

Tips / Best practices

...

Key points

...

18

Enter material descriptions in local languages

...

Request for should be checked for descriptions in other languages

e.g. ZH – Chinese might be indicated in original language.

...

12 mandatory languages are:

EN – English

Z9 – Brazilian Portuguese

ZH – Chinese

KO – Korean

DE – German

FR – French

IT – Italian

JA – Japanese

PL – Polish

PT – Portuguese

ES – Spanish

NL – Dutch

...

19

...

Go to Basic data text tab

Image Removed

...

#

...

Main activities

...

Tips / Best practices

...

Key points

...

20

...

Enter Basic data text – same as material description.

Use Image Removed  button to add languages

Copy English text to all other languages:

 Image Removed

...

12 mandatory languages are:

1 – Chinese (EN!)

E – English

F – French

D – German

I – Italian

J – Japanese

3 – Korean

L – Polish

P – Portuguese

S – Spanish

& – Brazilian Portuguese

N – Dutch

...

21

...

Return to Main Data

...

Image Removed

...

#

...

Main activities

...

Tips / Best practices

...

Key points

...

24

...

Enter MRP Type

...

Default value – PD

...

25

...

Enter MRP Controller

...

Default value – P05

...

27

...

Go to MRP 2 view

Image Removed

...

#

...

Main activities

...

Tips / Best practices

...

Key points

...

28

...

Enter Special procurement

...

Default value – 50

...

29

...

Enter Backflush

...

Default value – 2

...

30

...

Go to MRP 3 view

Image Removed

...

#

...

Main activities

...

Tips / Best practices

...

Key points

...

31

...

Enter Period Indicator

...

Default value – M

...

33

...

Go to MRP 4 view

Image Removed

...

#

...

Main activities

...

Tips / Best practices

...

Key points

...

34

...

Enter Individual/coll.

...

Default value – 2

...

35

...

When all data has been entered, save the material by pressingImage Removed  button and exit material creation

2.3. Material modification

2.3.1. Pre-requisites

Material modification is allowed only if validated by all Plants using the material.

...

#

...

Main activities

...

Tips / Best practices

...

Key points

...

1

...

Enter transaction MM03

...

T-code can be entered directly in Command field. T-code can be saved in Favorites.

...

Full path: Logistics -> Materials Management -> Material master -> Material -> Display

...

#

...

Main activities

...

Tips / Best practices

...

Key points

...

2

...

Enter Material number

...

3

...

Select Purchasing (or Sales: General/Plant Data) view

...

#

...

Main activities

...

Tips / Best practices

...

Key points

...

4

...

Verify the possible Plants related to the Material by clicking on the match code.

...

5

...

All Plants using the material are listed

...

2.3.2. Manual modification of material

Image Removed

...

#

...

Main activities

...

Tips / Best practices

...

Key points

...

1

...

Enter transaction MM02

...

T-code can be entered directly in Command field. T-code can be saved in Favorites.

...

Full path: Logistics -> Materials Management -> Material master -> Material -> Change

...

2

...

Select the view containing the field that needs modification

...

3

...

Select the Organizational Level for which the modification is requested

...

Repeat the modification for all Sales Areas or Plants if applicable.

...

4

...

Save the changes performed

Appendix 1 – List of contacts for Technology Solutions

Requests for Packaging requests can be accepted from Purchasing representative.
Detailed Technology Solutions Support Organization file by plants can be found in following link.

...

 Region

...

Representative

...

Email

US and Canada

...

Vanessa Scott

...

vanessa.scott@solvay.com

...

Leslie Fleming

...

leslie.fleming@solvay.com

...

Thierry Leclerc

...

thierry.leclerc@solvay.com

...

Mario Bruins

...

mario.bruins@solvay.com

...

LAM

...

Abril Gomez (Maternity leave)

Replacement: Vincent Cifelli and Eduardo Rubalcaba Guizar

...

abril.gomez@solvay.com
Vincent.Cifelli@solvay.com
eduardo.rubalcabaguizar@solvay.com

APAC

...

Natpapan Chueakongtrakul (Poon)

...

natpapan.chueakongtrakul@solvay.com

...

Celine Koh

...

celine.koh@solvay.com

...

Catherine Lu

...

catherine.lu@solvay.com

...

Sorrawit Parknondhkul

...

sorrawit.parknondhkul@solvay.com

...

Nathan Purvis

...

nathan.purvis@solvay.com

...

EMEA

...

Thierry Leclerc

...

thierry.leclerc@solvay.com

...

ZPRC/MOC

...

HazCom

...

hazcom.rawmat@solvay.com

...

MOC-ID

...

Lindsay Schramm

...

Lindsay.schramm@solvay.com

Appendix 2 – List of Plants in non-GTS countries

Whenever a material is extended to any of non-GTS plants, extension has to be added in a file to notify the responsible team. Location of the file.

...

Country

...

Plant Code

...

Description

...

Japan

...

8524

...

7418 / Gas Chem Logistic Osaka

...

Singapore

...

8506

...

6062 / Poh Tiong Choon Jurong

Appendix 3 – List of Single Storage Locations for Technology Solutions

...

Storage Location

...

Description

...

8380

...

7786 / JF Hillebrand Fremantle

...

8433

...

7788 / Jakarta

...

8496

...

7722 / BDP Peru Arequipa

...

8500

...

7725 / Andimex San Antonio

...

8503

...

7988 / Daesung Whse Yangsan

...

8505

...

7723 / FH Logist Azcapotzalco

...

8506

...

6062 / Poh Tiong Choon Jurong

...

8507

...

7725 / Sercabol Antofagasta

...

8508

...

7776 / Sinotrans Intl Shanghai

...

8509

...

7734 / KWE Logistics Shanghai

...

8511

...

7794 / CML Ltd Walvis Bay

...

8515

...

7786 / Toll Contr Laverton Nth

...

8519

...

7786 / NSS Port Sth Townsville

...

8520

...

7008 / XPO Logistic Bristol

...

8521

...

7008 / XPO Logistic La Porte

...

8527

...

7794 / Schenker Kempton Park

...

8528

...

7734 / Sinotrans Intl Shanghai

...

8543

...

7008 / KEMIRA WATER MOBILE

...

8545

...

7008 / FLUID ENERGY HATFIELD

...

8548

...

7008 / MOBILE SOLVENT EIGHT MILE

...

8549

...

7752 / NOVA MOLECULAR PASADENA

...

8553

...

7008 / SOUTH COAST HOUSTON

...

8554

...

7008 / SPRAY TEK MIDDLESEX

...

8559

...

7008 / TOLL COMPACTION NEPTUNE

...

8589

...

7734 / Tianjin DLD Beicheng Wh

...

8605

...

7794 / Kemira Chem Bradford

...

8614

...

7734 / COSCO Logistic Tianjin

...

8617

...

7776 / COSCHEM Logist Shanghai

...

8618

...

7794 / Praxair Oevel-Westerlo

Appendix 4 – Sinequa

Link to Sinequa Portal
Image Removed

Appendix 5 – Data Governance List for Composite Materials 

...

Plant

...

Data Governance Lead

...

DGL Backup

...

Anaheim

...

Rehan Suhrwardy

...

Nic Donovan

...

Orange

...

Corinne Nelson

...

D’Air

...

Bruce Gormley

...

Greenville

...

Hope Helton

...

Brianna Hammond

...

Winona

...

Danielle Dietermann

...

Jenna Sand

...

Kalamazoo

...

Carrie Replogle

...

Havre de Grace

...

John Cahoon

...

Kenya Eaton

...

Piedmont / Rock Hill

...

Harrison Blackwelder

...

Mike Zitricki

...

Wrexham

...

Stuart Tudor Jones

...

Peter Kaye

...

Oestringen

...

Nina Kunze

...

Jose Marin

...

Fengxian

...

Rick Marmol

Appendix 6 – List of plants for Composite Materials  

...

8350

...

8786

...