This document's objective is to provide a guide to managing Material master data ZVER and ZUNB materials.
This document is a complement to Standard Operating Procedure "Article Creation and Management", adapting the process to ZVER and ZUNB Material ZVER Material master data management for GBU Technology Solutions (Legacy Cytec organization).
...
Requests of Material Master creation or maintenance can be performed by approved requestors listed in Appendix 2 Appendix 1 - List of contacts.
For Composite Materials, the request will be sent via Sharepoints, in this case no additional approval is required.
All requests are sent to Master Data via Freshdesk or alternatively by e-mail. Common e-mail address of Riga SBS Data Management team: datamanage@solvay.com
Request form for packaging should usually be provided by requester. Link The link to the form can be found in Google Documents Template for RM and Packaging.
For Composite Materials, there is a template which is combined with ZMAT materials and will be provided in the Sharepoints/Freshdesk request.
The referral lists mentioned in this procedure, such as Purchasing Groups and Profit Center List are embedded in the TS SAP Material request form file.
...
Under Riga SBS Data Management's scope is the management of ZPRC, ZMAT, ZVER and ZUNB materials for GBU Technology Solutions and Composite Materials Solutions (legacy Cytec) sites in WP1 SAP system. Management of ZERS and ZMAT materials is described in a separate procedure. Riga SBS Data Management can create and extend ZDIE materials if requested so by Finance.
...
ZVER setup can be performed only once MOC-ID code is available.
Prior to submitting a new ZVER/ZUNB request, ZVER request, it is the requester´s responsibility to ensure the material does not exist in SAP already, so no duplicates are created in the system. If the material was not found, the TS SAP Material request form must be filled and submitted to Data Management for material master setup in SAP. A second search in the system is performed by the Data Management team to ensure no duplicates are created.
...
- The plant to which the raw material will be created
- The Impacted Business Unit (this information will be used to determine the profit center and purchase group).
Completed The completed Packaging request form should be attached for all ZVER codes. ZVER description must follow
Packaging rules table which can be found here - Packaging Instructions
2.1.1.2 Checking for duplicates
...
Main activities | Tips / Best practices | Key points1 |
Enter transaction MM03 | T-code can be entered directly in Command field. T-code can be saved in Favorites. | Full path: Logistics -> Materials Management -> Material master -> Material -> Display |
# | Main activities | Tips / Best practices | Key points |
2 | Press multiple choice button to receive pop-up window with search options for material master |
# | Main activities | Tips / Best practices | Key points3 |
Click on to open the menu | |||
4 | Select the option 'Material Number/Material Description' | Field 'Old material number' can be used to look up material by BPCS Code (temporarily). |
# | Main activities | Tips / Best practices | Key points |
5 | Run a search in Material Description | Use Wildcards to best describe | Open the material request form, copy the short text from the requested material and run a search in Material description with wildcards.6 |
Hit Enter |
# | Main activities | Tips / Best practices | Key points7 |
Verify entries found – compare results with the material's "short description" mentioned in the request form. If you have doubts about the material already created, contact the Requester to clarify. | If result points to or if the Requester mentions a new article need to be created then proceed with the creation. |
...
Main activities | Tips / Best practices | Key points |
|---|---|---|
Select Views to be created | Creation of views can be performed all at once or in separate steps | Technology Solutions
NOTE! Warehouse Management 1 & 2 Views to be created and warehouse number added (in brackets) for warehouse managed plants only: Composite Materials Always extend to Warehouse based on the file per plant |
Hit Enter | Use Default Setting button to save your selections for future creations |
...
| Fill in Organizational Levels | Key points | |
|---|---|---|
Technology Solutions
Composite Materials
| Hit Enter |
...
Main activities
...
Tips / Best practices
...
Key points
...
Enter Packaging Description
...
Check the request form for "SHORT DESCRIPTION"
...
Use the Composite Materials Naming Conventions file to validate the description.
...
Enter Base Unit of Measure
...
Enter Material Group
...
Enter Division
...
Always WD
...
Enter General Item Category Group
...
Always VERP
...
Enter UoM for Weight
...
Always KG
...
- Check the request form
- If Gross weight is provided, copy from the template
- If the Gross weight is not provided 0,010
- For pallets we should have the gross weight specified
...
- Check the request form
- If Net weight is provided, copy from the template
- If the Net weight is not provided 0,010
- For pallets we should have the gross weight specified
...
Go to Descriptions tab
...
From Basic Data View Descriptions tab can be accessed by pressing Additional Data button in the top part of screen as well. Tabs in Additional Data can be filled in any sequence.
| Hit Enter |
Main activities | Tips / Best practices | Key points |
|---|---|---|
Enter Packaging Description | Check the request form for "SHORT DESCRIPTION" | Should be checked whether description meets Packaging instructions. [Packaging name + dimensions + capacity + specific characteristics (if exists)]. |
Enter Base Unit of Measure | Always PC (Pieces) | |
Enter Material Group | Should be checked by type of packaging in Packaging Instructions table. | |
Enter Division | Always WD | |
Enter General Item Category Group | Always VERP | |
Enter UoM for Weight | Always KG | |
Go to Descriptions tab | From Basic Data View Descriptions tab can be accessed by pressing Additional Data button in the top part of screen as well. Tabs in Additional Data can be filled in any sequence. |
Main activities | Tips / Best practices | Key points |
|---|---|---|
Enter material descriptions in local languages | Request for should be checked for descriptions in other languages e.g. ZH – Chinese might be indicated in original language. | 12 mandatory languages are: |
Return to Main Data |
| Main activities | Key points |
|---|---|
| Alternative units of measure | Request the PC to KG conversion (mandatory) |
| Go to Basic data 2 |
...
Main activities | Tips / Best practices | Key points | |
|---|---|---|---|
Go to Basic data 2 view | |||
Enter Basic material descriptions in local languages | Request for should be checked for descriptions in other languages e.g. ZH – Chinese might be indicated in original language. | 12 mandatory languages are: | Return to Main Data |
...
Request the PC to KG conversion (mandatory)
...
- Default conversion should be added for all packaging materials 1EA = 1PC
- If the packaging type is pallet, weigh conversion (KG) should be provided
- Proportion: Weight Unit (KG) → Base unit of measure
- Copy from the template if any additional conversion is specified
A) When the net weight and gross weight are not provided and we defaulted to 0,010:
For Alternative UoM conversion to weight it should be 1 KG = 100 PC
B) When the net weight and gross weight are provided:
Calculate the inverse by dividing 1 to that weight: 1/0,029 = 34.48275862068966. It is the number how many Pieces are in 1 KG. Use the template table to calculate Denominator and Numerator:
Populate Alternate Uom conversion:
Generic ZPRC number for all ZVER materials | Always 90029754 | |
Go to Sales: general/plant view |
Main activities | Tips / Best practices | Key points |
|---|---|---|
Enter Availability check | Always 02 | |
Enter Transportation Group | Always 0001 | |
Enter Loading Group | Always 0001 | |
Packaging Mat type | Entered only for Pallets | 0001 |
Enter Profit Center | List of profit centers can be found in the following link. | |
Go to Purchasing view |
Main activities | Tips / Best practices | Key points |
|---|---|---|
Enter Purchasing Group | List of purchasing groups can be found in following ZVER Purchasing Groups | |
Enter Plant-specific material status | Once Finance creates Accounting and Costing Views and performs material costing run, the status will be removed by Finance to allow use of material in operations. | Status Z1 is to be used at the time of material creation. |
Activate automatic Purchase Order indicator | Always checked | |
Enter Purchasing value key | Always 0001 | |
Enter GR processing time | Plant data administrators will change the field value if necessary | Default value at the time of material creation – 2 |
Go to next view | Plant data / storage 1 view |
...
Main activities | Tips / Best practices | Key points | For Composite - material long description (copy from the form). If not provided copy the short description | Use button to add languages12 mandatory languages are: | Return to Main Data |
|---|
...
Main activities
...
Tips / Best practices
...
Key points
...
Go to Basic data 2 view
...
Enter Basic material
...
Generic ZPRC number for all ZVER materials
...
Always 90029754
Enter Physical inventory indicator for cycle counting | Plant data administrators will change the field value if necessary | Default value at the time of material creation – B |
Go to Plant data / storage 2 view | Nothing should be entered as Profit center data are being copied from Sales: general/plant view | |
Save material |
| Technology Solutions |
|---|
After material code is created Finance and Planning teams from the appropriate plant should be informed to create missing views, contacts can be found in TS MM Support Organization file. Also include costing team sbs_riga_rtr_costing@solvay.com Template Dear (Requester's name),
Kind regards, |
2.1.3. Extension of material
Following MOC procedure plants are obligated to review the existing MOC process every two to three years, therefore valid MOC ID is mandatory component for Packaging extension, this information should be provided by requester any time material should be created for a new plant.Lindsay Schramm should be contacted in case of missing MOC-ID.
NOTE: Raw Materials and Packaging should not be extended to Trading plants (8572 – MX, 8573 – CL, 8571 – PE, 8580 – NL, 7788 – ID, 7786 – AU, 8574 - CN).
To extend material enter transaction MM01. Copy from… option can be used, preferably to copy from an existing view of the same material.
To extend ZVER material to a Plant, select Sales: General/Plant Data, Purchasing, General Plant Data/Storage 1 & 2, Warehouse Management 1 & 2.
2.1.4. Extension of Technology Solutions Materials to Sales Organization view
Should be extended only to Intercompany Distribution Channel (9O)
Main activities | Tips |
|---|
...
Go to Sales: general/plant view
For Composite Materials
Main activities
/ Best practices | Key points | |
|---|---|---|
Enter Cross-distribution-chain specific material status | Status 63 is to be set at the moment of material creation to allow use of material in operations | |
Enter Valid from date for Cross-distribution-chain specific material status | DD.MM.YYYY | |
Maintain Tax classifications | System will automatically determine which Countries' tax lines should be added | Always 1 for all countries unless otherwise indicated by Finance or Tax department |
| Go to Sales: sales org. 2 view |
Main activities | Tips / Best practices | Key points |
|---|---|---|
Always 1 | Enter Account assignment group | Check the request form, if not provided populate with Fpackaging type: |
Enter Item category group | Always ZVRP | Save the extension |
...
Main activities
...
Tips / Best practices
...
Key points
...
Enter Availability check
...
Technology Solutions: Always 02
Composite Materials: Always KP
Always VERP | |
| Note! Check if the packaging has the weight conversion in the Alternatives units of measure, if is not add the default 1PC ↔ 1 KG | |
| Save the extension | |
2.2. Material modification
2.2.1. Pre-requisites
Material modification is allowed only if validated by all Plants using the material.
Requests to change Base unit of Measure must not be performed – in this case a new material has to be created.
Another exception can be a mistake for recently created material that has not yet had any stock and stock movements in the system.
Main activities | Tips |
...
Enter Transportation Group
...
Always 0001
...
Enter Loading Group
...
Always 0001
...
Packaging Mat type
...
Entered only for Pallets
...
0001
...
Enter Profit Center
...
Technology Solutions: List of profit centers can be found in following link.
Composites Materials: Check the request form
...
Go to Purchasing view
...
Main activities | Tips / Best practices | Key points |
|---|---|---|
Enter Purchasing Group | Technology Solutions: List of purchasing groups can be found in following ZVER Purchasing Groups Composite Materials: Check the request form | |
Enter Plant-specific material status | Once Finance creates Accounting and Costing Views and performs material costing run, the status will be removed by Finance to allow use of material in operations. | Status Z1 is to be used at the time of material creation. | Activate automatic Purchase Order indicator | Always checked | Enter Purchasing value key | Always 0001 |
Enter GR processing time | Plant data administrators will change the field value if necessary | Default value at the time of material creation – 2 | Go to next view | Plant data / storage 1 view |
...
Main activities
...
Tips / Best practices
...
Key points
...
Enter Physical inventory indicator for cycle counting
...
Plant data administrators will change the field value if necessary
...
Technology Solutions: Default value at the time of material creation – B
Composite Materials: Check the request form
...
Go to Plant data / storage 2 view
...
Nothing should be entered as Profit center data are being copied from Sales: general/plant view
...
Save material
...
...
For packaging creation and extension, if the information is provided in the material form, the PIR and Source List should be created within the same request.
- Remove the Z1 block
- Create the PIR and Source List by following the procedure in SAP WP1 Contract & PIR Maintenance Work Instruction
- Add the Z1 block back
- Complete the Sharepoints request
...
After material code is created Finance and Planning teams from appropriate plant should be informed to create missing views, contacts can be found in TS MM Support Organization file. Also include include costing team sbs_riga_rtr_costing@solvay.com
Template
...
- Material (number) (description)
- MOC (number)
- Documentation from MOC
Kind regards,
transaction MM03 | T-code can be entered directly in Command field. T-code can be saved in Favorites. | Full path: Logistics -> Materials Management -> Material master -> Material -> Display |
Main activities | Tips / Best practices | Key points |
|---|---|---|
Enter Material number | ||
Select Purchasing (or Sales: General/Plant Data) view |
Main activities | Tips / Best practices | Key points |
|---|---|---|
Verify the possible Plants related to the Material by clicking on the match code. | ||
All Plants using the material are listed |
If material is open for more than one Plant, contact the other Plants to validate the requested modification.
If the answer is positive, change the material as shown in section 2.2.2. Manual modification of material.
If the answer is negative, create a new material as described in Chapter 2.1.2. of this OP, associated with the Plant that made the request.
2.3.2. Manual modification of material
Main activities | Tips / Best practices | Key points |
|---|---|---|
Enter transaction MM02 | T-code can be entered directly in Command field. T-code can be saved in Favorites. | Full path: Logistics -> Materials Management -> Material master -> Material -> Change |
Select the view containing the field that needs modification | ||
Select the Organizational Level for which the modification is requested | Repeat the modification for all Sales Areas or Plants if applicable. | |
Save the changes performed |
Appendix 1 – List of contacts
Requests for Packaging requests can be accepted from Purchasing representative.
Detailed Technology Solutions Support Organization file by plants can be found in following link.
Region | Representative | |
US and Canada | Vanessa Scott | |
Leslie Fleming | ||
| Peter Mertzanis | peter.mertzanis@solvay.com | |
Thierry Leclerc | ||
Mario Bruins | ||
LAM | Abril Gomez (Maternity leave) Replacement: Vincent Cifelli and Eduardo Rubalcaba Guizar | abril.gomez@solvay.com |
APAC | Natpapan Chueakongtrakul (Poon) | |
Celine Koh | ||
Catherine Lu | ||
Sorrawit Parknondhkul | ||
Nathan Purvis | ||
EMEA | Thierry Leclerc | |
| Sophie DeClaviere | sophie.declaviere@solvay.com | |
ZPRC/MOC | HazCom | |
MOC-ID | Lindsay Schramm | Lindsay.schramm@solvay.com |
Appendix 2 – List of Plants in non-GTS countries
Whenever a material is extended to any of non-GTS plants, extension has to be added in a file to notify the responsible team. Location of the file.
Country | Plant Code | Description |
Japan | 8524 | 7418 / Gas Chem Logistic Osaka |
Singapore | 8506 | 6062 / Poh Tiong Choon Jurong |
Appendix 3 – List of Single Storage Locations
Storage Location | Description |
8380 | 7786 / JF Hillebrand Fremantle |
8433 | 7788 / Jakarta |
8496 | 7722 / BDP Peru Arequipa |
8500 | 7725 / Andimex San Antonio |
8503 | 7988 / Daesung Whse Yangsan |
8505 | 7723 / FH Logist Azcapotzalco |
8506 | 6062 / Poh Tiong Choon Jurong |
8507 | 7725 / Sercabol Antofagasta |
8508 | 7776 / Sinotrans Intl Shanghai |
8509 | 7734 / KWE Logistics Shanghai |
8511 | 7794 / CML Ltd Walvis Bay |
8515 | 7786 / Toll Contr Laverton Nth |
8519 | 7786 / NSS Port Sth Townsville |
8520 | 7008 / XPO Logistic Bristol |
8521 | 7008 / XPO Logistic La Porte |
8527 | 7794 / Schenker Kempton Park |
8528 | 7734 / Sinotrans Intl Shanghai |
8543 | 7008 / KEMIRA WATER MOBILE |
8545 | 7008 / FLUID ENERGY HATFIELD |
8548 | 7008 / MOBILE SOLVENT EIGHT MILE |
8549 | 7752 / NOVA MOLECULAR PASADENA |
8553 | 7008 / SOUTH COAST HOUSTON |
8554 | 7008 / SPRAY TEK MIDDLESEX |
8559 | 7008 / TOLL COMPACTION NEPTUNE |
8589 | 7734 / Tianjin DLD Beicheng Wh |
8605 | 7794 / Kemira Chem Bradford |
8614 | 7734 / COSCO Logistic Tianjin |
8617 | 7776 / COSCHEM Logist Shanghai |
8618 | 7794 / Praxair Oevel-Westerlo |
Appendix 4 – Sinequa
Link to Sinequa Portal
...
Following MOC procedure plants are obligated to review existing MOC process every two to three years, therefore valid MOC ID is mandatory component for Packaging extension, this information should be provided by requester any time material should be created for a new plant.
...
2.1.4. Extension of Technology Solutions Materials to Sales Organization view
Should be extended only to Intercompany Distribution Channel (9O)
...
#
...
Main activities
...
Tips / Best practices
...
Key points
...
1
...
Enter Cross-distribution-chain specific material status
...
Status 63 is to be set at the moment of material creation to allow use of material in operations
...
2
...
Enter Valid from date for Cross-distribution-chain specific material status
...
DD.MM.YYYY
...
3
...
Maintain Tax classifications
...
System will automatically determine which Countries' tax lines should be added
...
Always 1 for all countries unless otherwise indicated by Finance or Tax department
...
...
#
...
Main activities
...
Key points
...
5
...
Enter Account assignment group
...
Check the packaging type:
F - Pallet (Consumable)
I - Drum, pail, Tote (IBC), Bag, Box
...
6
...
Enter Item category group
...
Always VERP
...
Requester should provide us with correct Description and Plant where material should be created.
2 types of ZBOM:
- Packaging Kits (BUOM EA - Division WD) → assemble from 2 parts of packaging (combination, not consumed, is is a steps in the process, does not have inventory)
- Pre-mixes (BUOM EA - Division provided) → materials which are being used for BOMs
...
#
...
Main activities
...
Tips / Best practices
...
Key points
...
1
...
Enter transaction MM01
...
T-code can be entered directly in Command field. T-code can be saved in Favorites.
...
Full path: Logistics -> Materials Management -> Material master -> Material -> Create (General)
...
#
...
Main activities
...
Tips / Best practices
...
Key points
...
2
...
Enter Industry Sector
...
Always choose “Chemical Industry”
...
3
...
Enter Material Type
...
Always ZBOM for Phantom assemblies
...
4
...
Copy from… Material
...
Option to copy data from an existing material can be useful in some cases.
...
5
...
Hit Enter
...
#
...
Main activities
...
Tips / Best practices
...
Key points
...
6
...
Select Views to be created
...
Creation of views can be performed all at once or in separate steps
...
Select Basic Data 1, Basic Data 2, MRP 1, MRP 2, MRP 3, MRP 4,
Sales Organization and Distribution Channel should not be filled.
...
7
...
Hit Enter
...
Use Default Setting button to save your selections for future creations
...
#
...
Main activities
...
Tips / Best practices
...
Key points
...
8
...
Fill in Organizational Levels
...
Sales Organization and Distribution Channel should not be filled.
...
Fill Plant as indicated in request.
...
9
...
Hit Enter
...
...
#
...
Main activities
...
Tips / Best practices
...
Key points
...
10
...
Phantom Description
...
Check the request
...
11
...
Base Unit of Measure
...
Copy from the form
...
12
...
Material Group
...
Always 0450
...
13
...
Division
...
Copy from the form
...
16
...
UoM for Weight
...
Always KG
...
17
...
Go to Descriptions tab
...
From Basic Data View Descriptions tab can be accessed by pressing Additional Data button in the top part of screen as well. Tabs in Additional Data can be filled in any sequence.
...
...
#
...
Main activities
...
Tips / Best practices
...
Key points
...
18
Enter material descriptions in local languages
...
Request for should be checked for descriptions in other languages
e.g. ZH – Chinese might be indicated in original language.
...
12 mandatory languages are:
EN – English
Z9 – Brazilian Portuguese
ZH – Chinese
KO – Korean
DE – German
FR – French
IT – Italian
JA – Japanese
PL – Polish
PT – Portuguese
ES – Spanish
NL – Dutch
...
19
...
Go to Basic data text tab
...
#
...
Main activities
...
Tips / Best practices
...
Key points
...
20
...
Enter Basic data text – same as material description.
Use button to add languages
Copy English text to all other languages:
...
12 mandatory languages are:
1 – Chinese (EN!)
E – English
F – French
D – German
I – Italian
J – Japanese
3 – Korean
L – Polish
P – Portuguese
S – Spanish
& – Brazilian Portuguese
N – Dutch
...
21
...
Return to Main Data
...
...
#
...
Main activities
...
Tips / Best practices
...
Key points
...
24
...
Enter MRP Type
...
Default value – PD
...
25
...
Enter MRP Controller
...
Default value – P05
...
27
...
Go to MRP 2 view
...
#
...
Main activities
...
Tips / Best practices
...
Key points
...
28
...
Enter Special procurement
...
Default value – 50
...
29
...
Enter Backflush
...
Default value – 2
...
30
...
Go to MRP 3 view
...
#
...
Main activities
...
Tips / Best practices
...
Key points
...
31
...
Enter Period Indicator
...
Default value – M
...
33
...
Go to MRP 4 view
...
#
...
Main activities
...
Tips / Best practices
...
Key points
...
34
...
Enter Individual/coll.
...
Default value – 2
...
35
...
When all data has been entered, save the material by pressing button and exit material creation
2.3. Material modification
2.3.1. Pre-requisites
Material modification is allowed only if validated by all Plants using the material.
...
#
...
Main activities
...
Tips / Best practices
...
Key points
...
1
...
Enter transaction MM03
...
T-code can be entered directly in Command field. T-code can be saved in Favorites.
...
Full path: Logistics -> Materials Management -> Material master -> Material -> Display
...
#
...
Main activities
...
Tips / Best practices
...
Key points
...
2
...
Enter Material number
...
3
...
Select Purchasing (or Sales: General/Plant Data) view
...
#
...
Main activities
...
Tips / Best practices
...
Key points
...
4
...
Verify the possible Plants related to the Material by clicking on the match code.
...
5
...
All Plants using the material are listed
...
2.3.2. Manual modification of material
...
#
...
Main activities
...
Tips / Best practices
...
Key points
...
1
...
Enter transaction MM02
...
T-code can be entered directly in Command field. T-code can be saved in Favorites.
...
Full path: Logistics -> Materials Management -> Material master -> Material -> Change
...
2
...
Select the view containing the field that needs modification
...
3
...
Select the Organizational Level for which the modification is requested
...
Repeat the modification for all Sales Areas or Plants if applicable.
...
4
...
Save the changes performed
Appendix 1 – List of contacts for Technology Solutions
Requests for Packaging requests can be accepted from Purchasing representative.
Detailed Technology Solutions Support Organization file by plants can be found in following link.
...
Region
...
Representative
...
US and Canada
...
Vanessa Scott
...
...
Leslie Fleming
...
...
Thierry Leclerc
...
...
Mario Bruins
...
...
LAM
...
Abril Gomez (Maternity leave)
Replacement: Vincent Cifelli and Eduardo Rubalcaba Guizar
...
abril.gomez@solvay.com
Vincent.Cifelli@solvay.com
eduardo.rubalcabaguizar@solvay.com
APAC
...
Natpapan Chueakongtrakul (Poon)
...
natpapan.chueakongtrakul@solvay.com
...
Celine Koh
...
...
Catherine Lu
...
...
Sorrawit Parknondhkul
...
sorrawit.parknondhkul@solvay.com
...
Nathan Purvis
...
...
EMEA
...
Thierry Leclerc
...
...
ZPRC/MOC
...
HazCom
...
...
MOC-ID
...
Lindsay Schramm
...
Lindsay.schramm@solvay.com
Appendix 2 – List of Plants in non-GTS countries
Whenever a material is extended to any of non-GTS plants, extension has to be added in a file to notify the responsible team. Location of the file.
...
Country
...
Plant Code
...
Description
...
Japan
...
8524
...
7418 / Gas Chem Logistic Osaka
...
Singapore
...
8506
...
6062 / Poh Tiong Choon Jurong
Appendix 3 – List of Single Storage Locations for Technology Solutions
...
Storage Location
...
Description
...
8380
...
7786 / JF Hillebrand Fremantle
...
8433
...
7788 / Jakarta
...
8496
...
7722 / BDP Peru Arequipa
...
8500
...
7725 / Andimex San Antonio
...
8503
...
7988 / Daesung Whse Yangsan
...
8505
...
7723 / FH Logist Azcapotzalco
...
8506
...
6062 / Poh Tiong Choon Jurong
...
8507
...
7725 / Sercabol Antofagasta
...
8508
...
7776 / Sinotrans Intl Shanghai
...
8509
...
7734 / KWE Logistics Shanghai
...
8511
...
7794 / CML Ltd Walvis Bay
...
8515
...
7786 / Toll Contr Laverton Nth
...
8519
...
7786 / NSS Port Sth Townsville
...
8520
...
7008 / XPO Logistic Bristol
...
8521
...
7008 / XPO Logistic La Porte
...
8527
...
7794 / Schenker Kempton Park
...
8528
...
7734 / Sinotrans Intl Shanghai
...
8543
...
7008 / KEMIRA WATER MOBILE
...
8545
...
7008 / FLUID ENERGY HATFIELD
...
8548
...
7008 / MOBILE SOLVENT EIGHT MILE
...
8549
...
7752 / NOVA MOLECULAR PASADENA
...
8553
...
7008 / SOUTH COAST HOUSTON
...
8554
...
7008 / SPRAY TEK MIDDLESEX
...
8559
...
7008 / TOLL COMPACTION NEPTUNE
...
8589
...
7734 / Tianjin DLD Beicheng Wh
...
8605
...
7794 / Kemira Chem Bradford
...
8614
...
7734 / COSCO Logistic Tianjin
...
8617
...
7776 / COSCHEM Logist Shanghai
...
8618
...
7794 / Praxair Oevel-Westerlo
Appendix 4 – Sinequa
Link to Sinequa Portal
Appendix 5 – Data Governance List for Composite Materials
...
Plant
...
Data Governance Lead
...
DGL Backup
...
Anaheim
...
Rehan Suhrwardy
...
Nic Donovan
...
Orange
...
Corinne Nelson
...
D’Air
...
Bruce Gormley
...
Greenville
...
Hope Helton
...
Brianna Hammond
...
Winona
...
Danielle Dietermann
...
Jenna Sand
...
Kalamazoo
...
Carrie Replogle
...
Havre de Grace
...
John Cahoon
...
Kenya Eaton
...
Piedmont / Rock Hill
...
Harrison Blackwelder
...
Mike Zitricki
...
Wrexham
...
Stuart Tudor Jones
...
Peter Kaye
...
Oestringen
...
Nina Kunze
...
Jose Marin
...
Fengxian
...
Rick Marmol
Appendix 6 – List of plants for Composite Materials
...
8350
...
8786
...