OwnerSoumen Laru
StakeholdersStakeholders

Purpose

The purpose of this document is to define the conversion approach of activity types into S4HANA

The document details out the field list, extraction criteria, scoping, mapping of activity type object

. Activity types describe the activity produced in a cost centre within a controlling area. At SyWay, activity types are used to quantify the cost of the services that a department provides to other areas or to production orders, projects or activities in manufacturing, research and development, IT projects etc.

The scope of this conversion spec refers to the migration of Activity types into S/4HANA system. 

Conversion Scope

The scope of this document covers the approach for creating a new Activity Types into S/4HANA following the MDS DD-FUN-050 Master Data Standard_1071-Activity Types,

Conversion Scope

Activity Types which will be listed as part of scope list with new numbering will be in scope of migration. This object's conversion from source to target is an approved DCT document. Therefore, relevancy rules are not applicable for this object as it uses DCT approach with full construct design.

List of source systems and approximate number

of records 

of records. Note: Target records are expected to be lower after finalization of the design.

SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2Activity
TypeS4HANA
Types8994S/4HANA~ 2570 ~
WP2Activity
Type
Types
S4HANA
1099
PI2Activity Type
S/4HANA~ 350 ~
S4HANA

Additional Information

Multi-language Requirement

Activity Types will primarily be managed in English. However, according to KDD055, this master data standard will be implemented in 4 core languages. 

 - English (EN)
 - French (FR)
 - Italian (IT)
 - Chinese (ZN)

 Note: Other language requirements were not finalized while developing this document, refer to Jira ID # PDM 604.

Document Management

N/A

Legal Requirement

N/A

Special Requirements

N/A

Target Design

The technical design of the target for this conversion approach. 

Table

Field

Data Element

Field Description

Data Type

Length

(Decimals)

Requirement

R = Required : Mandatory field

O = Optional: Not mandatory. If a value is entered it doesn't impact Business Process.

C = Conditional: Not mandatory. If a value is entered it impacts Business Process or Reporting.

CSLAKOKRS
Requirement
KOKRSControlling AreaCHAR
R
CSLALSTAR
80    
LSTARActivity TypeCHAR
6R
CSLADATAB
80    
DATABValid-from Date
Date
DATE8R
CSLADATBIDATBIValid-to Date
Date
DATE8R
CSLALANGULANGULanguage in Which Texts Are SavedCHAR80    
NAME
O
CSLTKTEXTKTEXTNameCHAR20    R
CSLTLTEXTLTEXTDescriptionCHAR40    R
CSLALEINHLEINH
_ISO
Activity Unit (ISO Format)
CHAR
UNIT3     R
CSLALATYPLATYPActivity Type CategoryCHAR
1R
CSLALATYPI
80    
LATYPIVariant Activity Type CategoryCHAR
1O
CSLAKSTTY
80    
KSTTYValid Cost
Center
Centre CategoriesCHAR8     
AUSEH_ISO
R
CSLAAUSEHAUSEHOutput Unit (ISO Format)
CHAR
UNIT3     O
CSLAAUSFKAUSFKOutput Factor
Number
DEC5     O
CSLAVKSTAVKSTAAllocation Cost ElementCHAR10    C
CSLASPRKZSPRKZLock IndicatorCHAR1     O
CSLAFIXVOFIXVO
Redistribution
Predistribution of Fixed CostsCHAR1     O
CSLATARKZTARKZPrice IndicatorCHAR3     O
CSLAYRATEYRATEPrice Calc. w. Period-Based Avg. PricesCHAR1     O
CSLATARKZ_ICO_TARKZ_IActual Price IndicatorCHAR3     O
CSLAMANISTCO_MANISTActual Quantity SetCHAR1     O
CSLAMANPLANCO_MANPLANPlan Quantity SetCHAR1     O


Data Cleansing

Data Cleansing is not relevant for this object because the entire Activity types will be afresh designed in S/4HANA. If any cleansing is deemed necessary, it will be performed outside of the system, as a result, the cleansed Activity Types will be populated directly in the Data Collection Template (DCT).

ID

Criticality


Error Message/Report Description

Rule

Output

Source System

1.      

Can load, but business process will fail

Lock any Activity Type not being used for last 5 years

TBD

Report

PF2 / PI2 / WP2N/A







Conversion Process 

The high-level process is represented by the diagram below:

Image RemovedAlthough source extraction is planned, no relevancy or extraction rules are implemented. The Data team will collect the new Activity Types manually in the DCT to support the To-Be design, and an ETL process will be followed to the Target loads.

Data Privacy and Sensitivity

N/A


Extraction

Extract data from a source into . There are 2 possibilities:

The data exists. connects to the source and loads the data into . There are 3 methods:

Perform full data extraction from relevant tables in the source

system(s).
  • Perform extraction through the application layer.
  • Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  • The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in
  • The agreed Relevancy systems into Syniti Migrate. There will be no relevancy criteria is applied to the extracted records to identify the records that are , The DCT is applicable for the Target loads.

    1. Syniti Migrate connects to the sources.
    2. An initial extract of the relevant Activity Types will be made available to assist business with any standardization.

    Extraction Run Sheet

    Req #

    Requirement description

    Team responsible

    1.      

    Ensure source tables CEPC and CEPCT are extracted in tool according to the agreed cut-off date in the project plan

    Ensure DCT is collected for the Activity Types based on the collection template

    Data team

    2.      

    Perform preliminary completeness check documented in section 5.2.8.1.1

    Data team

    3.      

    Raise issues as defects if Req # 1 to 2 are not met

    Data team

    4.      

    Repeat Req # 1 to 3 if required

    Data team

    5.      

    Report extraction result to person in charge of APOI conversion

    Data team

    The new Activity Types will be collected using the Data Collection Template (DCT)

    R2R Data Team

    Selection Screen

    Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set
    N/A



    Data Collection Template (DCT)

    Target Ready Data Collection Template will be created for data Activity Types with exception of some fields which require transformation as mentioned in the transformation rule.

    DCT Rules- 1 for Activity Types with English language


    Table & Field Name

    Field description

    Rule

    CSLA - KOKRSControlling Area

    Defaults to 'XXXX' (XXXX will be finalized after config item)

    CSLA - LSTAR

    Activity Types


    CSLA - DATABValid-from Date

    First Day of fiscal period when the activity type is created

    CSLA - DATBIValid-to Date

    Set to be '31.12.9999'

    CSLA - LANGULanguage in Which Texts Are Saved


    CSLT - KTEXTName


    CSLT - LTEXTDescription


    CSLA - LEINHActivity Unit (ISO Format)


    CSLA - LATYPActivity Type Category

    Set to be '3'

    CSLA - LATYPIVariant Activity Type Category

    Set to be '2'

    CSLA - KSTTYValid Cost Centre Categories


    CSLA - AUSEHOutput Unit (ISO Format)


    CSLA - AUSFKOutput Factor


    CSLA - VKSTAAllocation Cost Element

    Choose an appropriate secondary cost element, there will be a relationship of 1:1 in between the activity type and the secondary cost element

    CSLA - SPRKZLock Indicator


    CSLA - FIXVOPredistribution of Fixed Costs


    CSLA - TARKZPrice Indicator

    Set to be '1'

    CSLA - YRATEPrice Calc. w. Period-Based Avg. Prices


    CSLA - TARKZ_IActual Price Indicator

    Set to be '5'

    CSLA - MANISTActual Quantity Set


    CSLA - MANPLANPlan Quantity Set


    DCT - 2 for Activity Types that use a language other than English. Activity types with Descriptions will be collected in multiple languages, hence a separate DCT will be used

    Field Name

    Field description

    Rule
    CSLT-KOKRSControlling AreaDefaults to 'XXXX' (XXXX will be finalized after config item)
    CSLT - LSTARActivity Types
    CSLT - SPRASLanguage KeyInput Language Key, ex: If Chinese, CN
    CSLT-DATBIValid toSet to be '31.12.9999'
    CSLT - KTEXTNameEnter

    CEPC-PRCTR

    Activity Type

    Business to enter
    content as per data type and length permitted

    Suggestion to add:

    Decimal validation - Check table TCURX for the document currency key and if Decimals (TCURX-CURRDEC) is ‘0’, validate that no decimal value is populated.
    CSLT - LTEXTDescriptionEnter content as per data type and length permitted

    Extraction Dependencies

    Item #

    Step description

    Team responsible

    1.      

    Any period / year end close activities have been fully completed

    Business

    2.      

    Reconciliation for intercompany payables have been completed, and adjustment made in legacy SAP system

    Business

    3.      

    Reconciliation of migrated Purchase Order is completed before the extraction of Accounts Payable Open Items

    Business and Data

    N/A  



    Transformation

    To prepare the data for Target, the

    Transformation

    The Target fields are mapped to the applicable ECC field that corresponding Legacy field (DCT will be its the source , this is a 3-way activity involving the Business, Functional team and Data team.  This identifies the transformation activity required to allow to make the data Target ready:for this object) 

    1. Perform value mapping and data transformation rules.
      1. ECC Legacy values are mapped to the to-be values (this could include a default value)Values are transformed according to the rules defined in
    2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool.  This This step also produces the load data ready for business to perform Pre-load Data Validation

    Transformation Run Sheet

    Item #

    Step description

    Team responsible

    1.      

    Ensure all the fields that require value mapping, as stipulated  Mapping tables, have the latest signed-off mapping files imported into toolMigrate.

    Obtain DCT Sign-off from Business

    R2R Data TeamData team

    2.      

    In tool, select the Trial Balance object PY.

    Data team

    3.      

    Go to Process Area Launch and Process the Object - Trial Balance object - R4 Trial Balance PY.

    Data team

    4.      

    Launch the Objects to execute transformation.

    Data team

    Generate Load Files

    R2R Data Team

    3.5.      

    Monitor the transformation progress and ensure that performance and completion is are within the allowed timeframetimelines

    R2R Data teamTeam

    64.      

    Generate Pre-Load reports .

    Data team

    7.      

    Generate data load count.

    Data team

    Review and Validate Error and Preload Reports

    R2R Data Team

    5.8.      

    Log errors as defects , if for any kind of errors and address resolutions. Close defects.resolution

    R2R Data teamTeam

    96.      

    Re-transform and re-validate the Pre-load reports if necessary.

    Data team

    10.   

    Validate the transformed file as part of pre-load validation, raise data defects or provide the pre-load sign-off.

    Business

    11.   

    Analyse and resolve any pre-load defects logged by business.

    Data team

    12.   

    Repeat steps 6 to 11 if necessary

    Data team

    files, validate and ready for load (This step is applicable If step 5 is active, else No)

    R2R Data Team

    7.      

    Proceed for final loads

    R2R Data Team

    13.   

    Proceed to pre-load validations

    Data team

    Transformation Rules

    Rule #Source systemSource TableSource FieldSource descriptionTarget systemTarget TableTarget FieldTarget descriptionTransformation logic
    1
    ECC
    DCT
    CEPC
    CSLAKOKRSControlling Area
    *
    The controlling area is the highest organizational unit in Controlling.
    Type: Text
    Length: 80S/4HANACEPCKOKRSControlling Area*
    The controlling area is the highest organizational unit in Controlling.
    Type: Text
    Length: 80Default to Controlling Area XXXX

    Transformation Mapping

    S/4HANACSLAKOKRSControlling AreaDefault to 'XXXX'
    2DCTCSLALSTARActivity TypeS/4HANACSLALSTARActivity TypeDirect mapping from DCT
    3DCTCSLADATABValid-from DateS/4HANACSLADATABValid-from DateDirect mapping from DCT
    4DCTCSLADATBIValid-to DateS/4HANACSLADATBIValid-to DateSet to '31.12.9999'
    5DCTCSLALANGULanguage in Which Texts Are SavedS/4HANACSLALANGULanguage in Which Texts Are SavedDirect mapping from DCT
    6DCTCSLTKTEXTNameS/4HANACSLTNAMENameDirect mapping from DCT
    7DCTCSLTLTEXTDescriptionS/4HANACSLTLTEXTDescriptionDirect mapping from DCT
    8DCTCSLALEINHActivity Unit (ISO Format)S/4HANACSLALEINHActivity Unit (ISO Format)Direct mapping from DCT
    9DCTCSLALATYPActivity Type CategoryS/4HANACSLALATYPActivity Type CategoryDirect mapping from DCT
    10DCTCSLALATYPIVariant Activity Type CategoryS/4HANACSLALATYPIVariant Activity Type CategoryDirect mapping from DCT
    11DCTCSLAKSTTYValid Cost Center CategoriesS/4HANACSLAKSTTYValid Cost Center CategoriesDirect mapping from DCT
    12DCTCSLAAUSEHOutput Unit (ISO Format)S/4HANACSLAAUSEHOutput Unit (ISO Format)Direct mapping from DCT
    13DCTCSLAAUSFKOutput FactorS/4HANACSLAAUSFKOutput FactorDirect mapping from DCT
    14DCTCSLAVKSTAAllocation Cost ElementS/4HANACSLAVKSTAAllocation Cost ElementDirect mapping from DCT
    15DCTCSLASPRKZLock IndicatorS/4HANACSLASPRKZLock IndicatorDirect mapping from DCT
    16DCTCSLAFIXVORedistribution of Fixed CostsS/4HANACSLAFIXVORedistribution of Fixed CostsDirect mapping from DCT
    17DCTCSLATARKZPrice IndicatorS/4HANACSLATARKZPrice IndicatorDirect mapping from DCT
    18DCTCSLAYRATEPrice Calc. w. Period-Based Avg. PricesS/4HANACSLAYRATEPrice Calc. w. Period-Based Avg. PricesDirect mapping from DCT
    19DCTCSLATARKZ_IActual Price IndicatorS/4HANACSLATARKZ_IActual Price IndicatorDirect mapping from DCT
    20DCTCSLAMANISTActual Quantity SetS/4HANACSLAMANISTActual Quantity SetDirect mapping from DCT
    21DCTCSLAMANPLANPlan Quantity SetS/4HANACSLAMANPLANPlan Quantity SetDirect mapping from DCT

    Transformation Mapping

    Mapping Table Name

    Mapping Table Description

    Activity Types

    Old to New Activity Types

    Mapping Table Name

    Mapping Table Description

    Activity Type

    Mapping of ECC Profit Center to target system value

    Person Responsible

    Mapping of ECC Person Responsible to New Person Responsible

    User ID

    Mapping of ECC User ID

    Hierarchy Group

    Mapping of ECC Hierarchy Group to Hierarchy Group

    Transformation Dependencies

    List the steps that need to occur before transformation can commence
    Item #Step DescriptionTeam Responsible
    1Ensure all the fields that require value mapping, as stipulated. Mapping tables, have the correct values mapped and imported into tool.DCT completenessR2R Data Team
    2

    Ensure Activity Type hierarchies are loaded into target Value Mappings are according to the target design in S/4HANA

    R2R Data Team


    Pre-Load Validation

    Project Team

    Completeness


    Task

    Action

    Generation of
    Pre-load reports

    Mandatory field check.
    Activity Types are mapped to new values

    Activity Type Hierarchy Mapped to new values

    Person Responsible / HR positions mapped to new values

    Record Count

    Confirm the record counts in preload summary report

    Total Records: 

    Valid Records:

    Invalid Records:

    Accuracy

    Verify Record CountR2R Data Team to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets.


    Accuracy


    Task

    Action

    Conversion Accuracy

    R2R Data Team to ensure that all fields listed below pass the checks:

    1. Mandatory Fields
    2. Field and Value Mapping Correctness
    3. Null Checks
    4. Filed Length Checks
    Review Error ReportsReview and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source DCT

    Task

    Action

    Mandatory field mapping and transformation

    Obtain a list of the fields to be populated with values from mapping files and ensure all these fields contain S/4HANA values. 
    Review the data report to ensure mapping value is not missing in tool.
    Capture errors in the Data Error report
    .


    Business

    Completeness

    TaskAction
    Verify
    record count in Pre-load reports by regionConfirm the Preload File contains all the records in scope of migration ( Based on list of Activity Types mapped from old to new ) 
    Record CountBusiness Data Owner/s to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets.

    Accuracy

    TaskAction
    Conversion
    accuracy
    AccuracyBusiness Data Owner/s to verify that all the data in the load table/file is accurate
    Verify Activity Types are transformed accurately
    as per endorsed transformation / mapping rules (and signed-off DCT data).

    Review error reports in tool for any mismatch or missing transformed values.

    In ECC system, execute ECC tcode SE16N to display table to confirm copied fields are accurately copied. 

    If any of the sum is different, raise defect and flag the relevant record as error.
    Load


    Load

    Activity types will be migrated using the SAP tool 'Migration Cockpit', Object: Activity Type used for this specific import. Migration template is attached as a reference.

    1071_Source data for CO - Activity type.xml

    View file
    name1071_Source data for CO - Activity type.xml
    height250

    The load process includes:

    1. Execute the automated data load into target system using load tool or produce the load file if the loading of records to be done using LTMC cockpit object of Activity Typei.e., SAP Migration Cockpit
    2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation with side by side check of each fields in scope of the objects with fields to be displayed as XXXX_ECC, XXXX_S4HANA, XXXX_MATCH ( As TRUE or FALSE) with an additional column denoting fields not matching and status of loading in S/4HANA as LOADED_IN_S4HANA ( As TRUE or FALSE) Validation 

    Load Run Sheet


    .2Resolve defects by reupload and re-generate reports if necessary.

    Item

    Step description

    Team responsible

    1

    Ensure Pre-load sign-offs are obtained

    R2R Data team

    2

    Ensure the load tools are transported into the correct tool instance

    R2R Data team

    Ensure DCTs and all required mappings are submitted and complete

    Data team

    3

    Go to <Load tool>

    R2R

    3

    Ensure Pre-load sign-offs are obtained.

    Data team

    4

    Execute upload of Activity Type Object using Migration Cockpit Object for Activity Type Upload

    Load 1 or 2 records for "Activity Types" to validate if data is loaded successfully without errors

    R2R Data team

    5

    Generate the post load reports in tool.

    Proceed with full load if step 4 is successful and validated

    R2R Data team

    6

    Log errors as defects, if any and address resolutions. Close defects.

    Validate few records loaded by accessing standard transactions or tables from S/4HNA E.g. KL03 or FIORI: Manage Activity Types

    R2R Data team

    7

    Generate post load

    Data team

    8

    Business to validate the post load files as part of post-load validation, raise data defects or provide the post-load sign-off.

    Business

    9

    Repeat steps 5 to 7 if necessary.

    Data team

    report if step 4 is validated

    R2R Data team


    Load Phase and Dependencies

    Pre-Cut over

    Configuration

    Item #

    Configuration item

    1.      

    Controlling Area

    2.      

    Standard Hierarchy is Maintained

    3.      

    Currencies (currency keys, decimal places in currencies)

    Secondary Cost Elements

     Conversion Objects

    Object #Preceding Object Conversion Approach
    1067GL Account Operational COA (Incl. Secondary CE)N/A

    Error Handling


    Error type

    Error description

    Action taken

    P

    Posting period is blocked for posting

    Review project / cutover plan and ensure posting periods can be opened for postings

    Activity Type does not exist

    Activity Type does not exist in company code

    Configuration

    Invalid Secondary Cost Element

    System provides opportunity to review the incorrectly populated data and these need to be analysed and corrected

    Consult Functional team to expedite and fix the error in the system

    Configuration

    Invalid Cost Centre Categories

    System provides opportunity to review the incorrectly populated data and these need to be analysed and corrected

    Consult Functional team to expedite and fix the error in the system

    Configuration

    Invalid Activity Type Categories

    System provides opportunity to review the incorrectly populated data and these need to be analysed and corrected

    Consult Functional team to expedite and fix the error in the system

    Ensure the Activity Type mapping is correct and or create the Activity Type if it is valid


    Post-Load Validation

    Project Team

    Completeness

    TaskAction
    Reconciliation of Record

    Verify Count

    Record Count

    Check the sum of record count of the open items in the load file is the same as S/4HANA. The record count for TB Balance ( PY )  will be done on the group basis. The fields in the group are consist of: Company Code, Vendor Account

    R2R Data Team to verify the record count created in target S/4 HANA by accessing post load reports using standard reports from S/4 HANA.

    Verify Logs

    Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.).


    Accuracy

    TaskAction
    Check values in key fields for accuracy

    Post-load reports will have the same structure as the load file and some additional columns as required to facilitate the post load validation.

    Leverage on tool to create a Post Load report that reports S/4HANA loaded records along with the ECC values side-by-side to allow for 100% check of all these fields in the shortest possible time.

    Any mismatch will be reported under the Post Load - Error report
    Conversion Accuracy

    Verify that the Activity Types in target S/4 HANA are loaded correctly via load program and validate post load reports using standard t.code KL03 / KL13 or database tables CSLA from S/4 HANA.


    Business

    Completeness

    TaskAction
    Record

    Verify Count

    CheckReview

    Download Post Load Reports from load program and verify that the record count

    report from the Data Team and ensure it is correct by cross-checking with the record count confirmed during Pre-load Business Validations

    loaded in the target S/4 HANA is the same count as of the approved load file.


    Accuracy

    TaskAction
    Spot
    check
    checksBusiness should choose some Activity
    Type
    Types and perform comprehensive check of the fields
    in S4
    in S/4 HANA
    Conversion AccuracyVerify that the Activity Types in target S/4 HANA are loaded correctly via load program and validate post load reports using standard t.code KL03 / KL13 or database tables CSLA / CSLT from S/4 HANA.


    Key Assumptions

    • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.  is in scope based on data design and any exception requested by business.
    • Data values in DCT are target ready data unless a specific transformation rule is stated for that field in the transformation rules
    • Basic required configuration to be completed prior to this conversation

    Change log

    Change History
    limit10

    Workflow history

    Workflow Report
    parent@self
    hideheadertrue
    typeapprovals