The purpose of this document is to define the conversion approach of activity types into S4HANA

The document details out the field list, extraction criteria, scoping, mapping of activity type object

Conversion Scope

Activity Types which will be listed as part of scope list with new numbering will be in scope of migration. 


List of source systems and approximate number of records 
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2Activity Type
S4HANA
WP2Activity Type
S4HANA
PI2Activity Type
S4HANA

Additional Information

Multi-language Requirement

Document Management

Legal Requirement

Special Requirements




Target Design

The technical design of the target for this conversion approach. 


Table

Field

Data Element

Field Description

Data Type

Length (Decimals)

Requirement


KOKRS
Controlling AreaCHAR80    

LSTAR
Activity TypeCHAR80    

DATAB
Valid-from DateDate


DATBI
Valid-to DateDate


LANGU
Language in Which Texts Are SavedCHAR80    

NAME
NameCHAR20    

LTEXT
DescriptionCHAR40    

LEINH_ISO
Activity Unit (ISO Format)CHAR3     

LATYP
Activity Type CategoryCHAR80    

LATYPI
Variant Activity Type CategoryCHAR80    

KSTTY
Valid Cost Center CategoriesCHAR8     

AUSEH_ISO
Output Unit (ISO Format)CHAR3     

AUSFK
Output FactorNumber5     

VKSTA
Allocation Cost ElementCHAR10    

SPRKZ
Lock IndicatorCHAR1     

FIXVO
Redistribution of Fixed CostsCHAR1     

TARKZ
Price IndicatorCHAR3     

YRATE
Price Calc. w. Period-Based Avg. PricesCHAR1     

TARKZ_I
Actual Price IndicatorCHAR3     

MANIST
Actual Quantity SetCHAR1     

MANPLAN
Plan Quantity SetCHAR1     


Data Cleansing


ID

Criticality


Error Message/Report Description

Rule

Output

Source System

1.      

Can load, but business process will fail

Lock any Activity Type not being used for last 5 years

TBD

Report


PF2 / PI2 / WP2












Conversion Process 

The high-level process is represented by the diagram below:

Data Privacy and Sensitivity


Extraction

Extract data from a source into . There are 2 possibilities:

  1. The data exists. connects to the source and loads the data into . There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet


Req #

Requirement description

Team responsible

1.      

Ensure source tables CEPC and CEPCT are extracted in tool according to the agreed cut-off date in the project plan

Ensure DCT is collected for the Activity Types based on the collection template

Data team

2.      

Perform preliminary completeness check documented in section 5.2.8.1.1

Data team

3.      

Raise issues as defects if Req # 1 to 2 are not met

Data team

4.      

Repeat Req # 1 to 3 if required

Data team

5.      

Report extraction result to person in charge of APOI conversion

Data team


Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set





















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.

DCT Rules

Field Name

Field description

Rule

CEPC-PRCTR

Activity Type

Business to enter content as per data type and length permitted



Suggestion to add:

Decimal validation - Check table TCURX for the document currency key and if Decimals (TCURX-CURRDEC) is ‘0’, validate that no decimal value is populated.


Extraction Dependencies


Item #

Step description

Team responsible

1.      

Any period / year end close activities have been fully completed

Business

2.      

Reconciliation for intercompany payables have been completed, and adjustment made in legacy SAP system

Business

3.      

Reconciliation of migrated Purchase Order is completed before the extraction of Accounts Payable Open Items

Business and Data



Transformation

The Target fields are mapped to the applicable ECC field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team.  This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. ECC values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool.  This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet


Item #

Step description

Team responsible

1.      

Ensure all the fields that require value mapping, as stipulated  Mapping tables, have the latest signed-off mapping files imported into toolMigrate.

Data team

2.      

In tool, select the Trial Balance object PY.

Data team

3.      

Go to Process Area Launch and Process the Object - Trial Balance object - R4 Trial Balance PY.

Data team

4.      

Launch the Objects to execute transformation.

Data team

5.      

Monitor the transformation progress and ensure performance and completion is within allowed timeframe

Data team

6.      

Generate Pre-Load reports .

Data team

7.      

Generate data load count.

Data team

8.      

Log errors as defects, if any and address resolutions. Close defects.

Data team

9.      

Re-transform and re-validate the Pre-load reports if necessary.

Data team

10.   

Validate the transformed file as part of pre-load validation, raise data defects or provide the pre-load sign-off.

Business

11.   

Analyse and resolve any pre-load defects logged by business.

Data team

12.   

Repeat steps 6 to 11 if necessary

Data team

13.   

Proceed to pre-load validations

Data team

Transformation Rules


Rule #

Source system

Source Table

Source Field

Source description

Target system

Target Table

Target Field

Target description

Transformation logic


1ECCCEPCKOKRSControlling Area*

The controlling area is the highest organizational unit in Controlling.

Type: Text
Length: 80
S/4HANACEPCKOKRSControlling Area*

The controlling area is the highest organizational unit in Controlling.

Type: Text
Length: 80
Default to Controlling Area XXXX



Transformation Mapping

Mapping Table Name

Mapping Table Description

Activity Type

Mapping of ECC Profit Center to target system value

Person Responsible

Mapping of ECC Person Responsible to New Person Responsible

User ID

Mapping of ECC User ID

Hierarchy Group

Mapping of ECC Hierarchy Group to Hierarchy Group

Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible
1Ensure all the fields that require value mapping, as stipulated. Mapping tables, have the correct values mapped and imported into tool.Data Team
2

Ensure Activity Type hierarchies are loaded into target S/4HANA

Data Team


Pre-Load Validation

Project Team

Completeness


Task

Action

Generation of
Pre-load reports

Mandatory field check.
Activity Types are mapped to new values

Activity Type Hierarchy Mapped to new values

Person Responsible / HR positions mapped to new values


Record Count

Confirm the record counts in preload summary report

Total Records: 

Valid Records:

Invalid Records:


Accuracy


Task

Action

Mandatory field mapping and transformation

Obtain a list of the fields to be populated with values from mapping files and ensure all these fields contain S/4HANA values. 
Review the data report to ensure mapping value is not missing in tool.
Capture errors in the Data Error report.



Business

Completeness

TaskAction
Verify record count in Pre-load reports by region

Confirm the Preload File contains all the records in scope of migration ( Based on list of Activity Types mapped from old to new ) 


Accuracy

TaskAction
Conversion accuracy

Verify Activity Types are transformed accurately as per endorsed transformation/mapping rules.

Review error reports in tool for any mismatch or missing transformed values.

In ECC system, execute ECC tcode SE16N to display table to confirm copied fields are accurately copied. 

If any of the sum is different, raise defect and flag the relevant record as error.


Load

The load process includes:

  1. Execute the automated data load into target system using load tool or produce the load file if the loading of records to be done using LTMC cockpit object of Activity Type. 
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation with side by side check of each fields in scope of the objects with fields to be displayed as XXXX_ECC, XXXX_S4HANA, XXXX_MATCH ( As TRUE or FALSE) with an additional column denoting fields not matching and status of loading in S/4HANA as LOADED_IN_S4HANA ( As TRUE or FALSE) 

Load Run Sheet


Item

Step description


Team responsible

1

Ensure the load tools are transported into the correct tool instance.

Data team

2

Ensure DCTs and all required mappings are submitted and complete

Data team

3

Ensure Pre-load sign-offs are obtained.

Data team

4

Execute upload of Activity Type Object using Migration Cockpit Object for Activity Type Upload

Data team

5

Generate the post load reports in tool.

Data team

6

Log errors as defects, if any and address resolutions. Close defects.

Data team

7

Resolve defects by reupload and re-generate post load reports if necessary.

Data team

8

Business to validate the post load files as part of post-load validation, raise data defects or provide the post-load sign-off.

Business

9

Repeat steps 5 to 7 if necessary.

Data team



Load Phase and Dependencies

Configuration

Item #

Configuration item

1.      

Controlling Area

2.      

Standard Hierarchy is Maintained

3.      

Currencies (currency keys, decimal places in currencies)

 Conversion Objects

Object #Preceding Object Conversion Approach
N/A

Error Handling


Error type

Error description

Action taken

P

Posting period is blocked for posting

Review project / cutover plan and ensure posting periods can be opened for postings

Activity Type does not exist

Activity Type does not exist in company code

Ensure the Activity Type mapping is correct and or create the Activity Type if it is valid


Post-Load Validation

Project Team

Completeness

TaskAction
Reconciliation of Record Count


Record Count

Check the sum of record count of the open items in the load file is the same as S/4HANA. The record count for TB Balance ( PY )  will be done on the group basis. The fields in the group are consist of: Company Code, Vendor Account



Accuracy

TaskAction
Check values in key fields for accuracy

Post-load reports will have the same structure as the load file and some additional columns as required to facilitate the post load validation.

Leverage on tool to create a Post Load report that reports S/4HANA loaded records along with the ECC values side-by-side to allow for 100% check of all these fields in the shortest possible time.

Any mismatch will be reported under the Post Load - Error report.




Business

Completeness

TaskAction
Record Count Check

Review the record count report from the Data Team and ensure it is correct by cross-checking with the record count confirmed during Pre-load Business Validations



Accuracy

TaskAction
Spot checkBusiness should choose some Activity Type and perform comprehensive check of the fields in S4


Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load. 
  • is in scope based on data design and any exception requested by business.



Change log

Version Published Changed By Comment
CURRENT (v. 4) Feb 23, 2026 10:11 PARA-ext, Anil
v. 41 Nov 20, 2025 11:44 PARA-ext, Anil
v. 40 Oct 28, 2025 13:26 PILLAY-ext, Lawrence
v. 39 Oct 20, 2025 12:16 PARA-ext, Anil
v. 38 Oct 08, 2025 08:05 PILLAY-ext, Lawrence
v. 37 Oct 02, 2025 10:27 PARA-ext, Anil
v. 36 Sept 30, 2025 11:43 PARA-ext, Anil
v. 35 Sept 29, 2025 09:27 GARCIA-ext, Angel Luis
v. 34 Sept 23, 2025 18:55 PARA-ext, Anil
v. 33 Sept 23, 2025 15:56 PARA-ext, Anil

Go to Page History

Workflow history

Title Last Updated By Updated Status  
There are no pages at the moment.

  • No labels