Comment: PIR -> Valid from as per request, if not provided today's date

...

Main activities

Tips/Best practices

Technology Solutions

Composite Materials

Planned Delivery Time


If pre-populated with a value lower than 5 days, update to 5 days
Purchasing group



Material Purchasing Group
Industrial Supplies (ZERS)

YBM for plants 8359, 8371 (US)
YMF 8373 (CA)
YBH for plant 8356 (MX)

Other material typesChange only if requested







Reference file

Material Purchasing Group
Raw MaterialsThe planners should add the correct buyer in copy when submitting the request. The purchasing group to be used should be from the buyer on the email.
Intercompany (Stock transfer Orders)

Check where the receiving plant is located and choose the purchasing group lists on the INTERCO / INTRACO (STOCK TRANSFERS) section.

  • Example: 
    • For US based STOs (where receiving plant is US based) - FJ0
    • For GB/UK based STOs (where receiving plant is EU based, for example GB, Wrexham, K&N Bonded and Non Bonded) - FH0
Packaging (ZVER)The purchasing group is defined based on the material group. In order to determine the correct code, refer to tabs: EU (Europe) Packaging or NA (North America Packaging, based on the plant location for which PIR is created.
Industrial Supplies (ZERS)Should be the Site Buyer code per plant plant


Standard Quantity

 

Always 1 if no special requests

Tax Code

Check location of plant and Vendor


Other countries

Plant Country

Local Tax

Import Tax

Australia

C”

D”

Brazil

GO* May have more than one option

GO

Canada

LY

AS

Chile

LR

LQ

China (TS Plant)

LC

JP

China (CM Plant)"OJP

Korea

IE


IndonesiaVXVO

Mexico

NK

NF

Peru

MM

ML

Taiwan (plant 8815) LNAS
Japan"KJW

USA

LN

AS

Europe

Import procedureApplicable for European plants only (Please refer to table above)If the plant that you are creating the PIR is in the same country of the supplier, no import procedure is required.
If the plant that you are creating the PIR is in different country of the supplier then import procedure is required based on vendor's location

Enter Net Price


As requested 

For Brazil Plants (8789) - Intercompany (p. org 3200): Must have price in
USD (Condition ZI01). Contact Sol Silva (Sol.Silva@solvay.com) for the price.
Note! If the price pulling in the PIR is not default USD, also check the vendor master which should have USD currency at plant 8789.

As requested 

  • For STO's:
    The price is required only when the Intercompany vendor is out of WP1
    • How to identify: creates the source list first and if the PPL (Procument plant) populates with plant then you know that the vendor/plant is within WP1
  • For STO's within WP1 - Intercompany: conditions or price needs to be deleted

Incoterms 1 and 2

Mandatory for all!As informed
  • For Brazil Plants (8789) - DAP SANTOS PORT
  • For STO's (p. org 3200) if not provided by the requester use as default DAP CIF DESTINATION
  • For ZERS (Materials with Division WA): Use PPD Destination as default Incoterms in cases when value is not indicated by requestor


Note!
No "." should be used for the second part on the Incoterms, if not provided, clarify with the requester

As informed 

For STO's (p. org 3200) if not provided by the requester use as default DAP DESTINATION

Note! No "." should be used for the second part on the Incoterms, if not provided, clarify with the requester.

US: EXW = Collect for domestic shipments; Pre paid (PPD) can be used only for US domestic; any supplier paid shipments coming into US, can not be PPD it should be DDP.



Confirmation Control Key (CCK)

Check Incoterms

If Incoterms are COL - always Z003, (exception if going from Kemira to Kemira’s plant 8543 then blank). 
For Brazil Plants (8789), CCK is always Z016

For rare cases where there might be, if materials are purchased on consignment, Tax code is LU

US only: For PIRs that are with tax code LN AND INCOTERMS COL ORIGIN Confirmation control key should be populated as Z003;

US only: For PIRs that are an import and Solvay is the importer of record (buyer will know this) confirmation control key should be populated as Z004;

For PIRs that are with tax code LU Confirmation control key should be populated based on the vendor’s country. For domestic - Z003 and for Imports - Z004.

For STO when the receiving plant is located in China confirmation control key should be Z004

GR-Bsd IV
Always checked

For Brazil Plants (8789) - Intercompany (STO): Not marked
Always checked


Ackn. rqd

Order acknowledgement tick mark is mandatory for all PIRs that are from a regular vendor. This includes sites that are not live in WP1, i.e. PE1 and any other Solvay sites that may not be in WP1, but have non-intercompany vendor code as well as go under Purchasing organization 3200.

All STOs (transfers between sites that are live in WP1) DON’T Need the tick mark there. 

Pricing Date Control
For Brazil Plants (8789), Always 1

Price date category is based on whether or not the material is an import (considering against the receiving plant). Applicable for all regions
1 (Purchase Order Date) = Import
2 (Delivery Date) = Domestic

If a vendor is US and plant is in GB, it’s an import = 1
If it’s US to US, domestic  = 2

Go to Conditions view

 


 

Image RemovedImage Added

 

Main activities

Technology Solutions

Composite Materials:
Valid fromAs per request, if not provided today's dateAs per request, if not provided today's date

Update the validity valid to period

The validity period to be used is 31.12.2025 (All material types)

For plant 8789 - 31.07.2021

The validity period to be used is 31.12.9999 (ZMAT and ZVER)

For ZERS (Materials with Division WA) -The validity period to be used is 31.12.2021

Click on



...

Main activities

Tips / Best practices

Key points

After deleting all lines go to header



Change Validity end to the past



Save it 




2.4 Quota Management

Procedure available in the link below:
WP1 - Quotas Management 
Quotas management - Print Screen

Appendix - Approved Requesters - Technology Solutions

...


ZERS (Materials with Division WA) and PIR
creation/modification/deletion

PIR creation/modification/deletion
PlantBuyerStoreroom OwnerLPR
8359Willow IslandUSDennis Andlinger

Tami Smith
Benjamin Burns

Procurement team
8371Mount PleasantUS

Terrence Bybee
Norm Hein
Mike Metcalf

8373WellandCAPeter Mertzanis

Jesse OstapJames Oliver
Alex Cavasin
Peter Anikejew

8356AtequizaMXCesar RivasAlberto MoraAbril Gomez (Maternity leave)
Replacement: Vincent Cifelli and Eduardo Rubalcaba Guizar
8486FengxianCNShen JieMing Liu
Sarawut Sonmuang
Ming Liu
Sarawut Sonmuang

...