1 OBJECTIVE AND SCOPE


1.1 Objective of this Procedure

This document describes the full procedure related to contract and PIR maintenance in SAP WP1 system. It’s a revised version from previous working instructions (Work Instruction - PUR - SAP - 02 & PIR Maintenance).
For Technology Solutions, requests can be performed by buyers and planners from each plant and for Composite Materials PIRs, Source Lists and Contracts can be modified and created by site Buyers (Strategic RM buyers. Planners can not (and should not) make changes themselves, but turn to buyers or us for that. 
All requests are sent to Data Operations team via FreshDesk 


1.2 Scope

Under Riga SBS Data Operations scope is the management of Contracts, PIRs and Source Lists for all Technology Solutions and Composite plants.

1.3 Abbreviations


Abbr.

Description

SBS

Solvay Business Services

HSE

Health, Safety and Environment

DG

Dangerous goods

MRP

Material Resource Planning

UoM

Units of Measure

PIR

Purchasing Info Record

STO

Stock Transfer Order

SLSource lists


1.4 Roles and responsibilities

Prior to submitting a new Contract/PIR/SL request, it is the requester’s responsibility to ensure the contract/PIR/SL does not exist in SAP already, so no duplicates are created in the system. If the contract/PIR/SL was not found, a request should be submitted to Data Operations for its set up in SAP. A second search in the system is performed by the Data Operations team to ensure no duplicates are created.


2 STANDARD OPERATING PROCEDURE DESCRIPTION


Purchase Info Record (PIR) is a method of managing the purchase price. An alternate management method is a contract. When a contract exists, then the PIR should not be used for the same material. A new PIR is created when a purchase from a new material/supplier combination is needed. Within the PIR there is another unique combination named Purchasing Org. Data, formed by the combination of the Purchasing Org., Info Category and Plant Code. If one of those elements is changed, this results in a new record within the PIR. In the PIR’s General View the global fields are available. These fields determine the information common to all plants using the material/supplier combination. The PIR’s maintenance is the responsibility of the Buyer. Any information missing in the ZERS form (approved by the Buyer) and necessary in the PIR should be completed by them.

2.1 Creation of PIR (Purchase Info Record) in WP1

PIRs are created when we have STO,  consignment PO or a subcontracting contract.

We have 4 types of PIR: 

  • Standard - Specifies that the info record is used only in connection with standard purchase orders. This is the most ordinary PIR type and is the one used for STO.

  • Subcontracting - Specifies that the info record is used only in connection with subcontract orders.

  • Pipeline - Specifies that the info record is used specifically for pipeline withdrawals.

  • Consignment - Specifies that the info record is only used in the case of consignment withdrawals.


2.1.1 Requirements for new PIR

In order to create new PIR we will need the following information:

  • Vendor

  • Plant

  • Price

  • Purchase organization (list can be found on Appendix 4)
  • Incoterms


Note! If you have a request with more than one PIR to be created/updated, add the TAG in Freshdesk with the number of PIRs created/updated.

2.1.2 Creating PIR

Main activities

Tips / Best practices

Key points

Enter transaction ME11

T-code can be entered directly in Command field. T-code can be saved in Favorites.


Vendor 


Information provided in the request

Material


As informed

Purchasing Organization

Information may change depending on the plant region/type of order

If not informed, see table below

Note! If the material is Finished Product (material group 0450) and the Purchasing Organization in not mentioned in the ticket, return to the requester and confirm the correct purchasing organization to be used.

Plant 


Information provided in the request

PIR category


If not informed, choose Standard

The PIR category should match purchasing organization for consignment only.

If it is subcon the purchasing org. will be a raw material

For ZERS (Materials with Division WA) - Standard

Press enter




Purchasing Organization

Domain

Europe

North America

Latin America

APAC

Packaging (ZVER)

3002

3010

3018

3026

Industrial Supplies (ZERS)

3004

3012

3020

3028

Raw Materials (ZMAT)

3006

3014

3022

3030

Inter-Company

3200

Third Party

3100

3101

3102

3103

Consignment3400340134023403


Main activities

Tips / Best practices

Key points

Vendor Material Number


Check the request form

Salesperson


Check the request form

Telephone


Check the request form

Order Unit

Example: If the price is 1.02 USD / per 1 YD, then the Order Unit should be YD

  • Creation: This field should match with the price unit of measure given by the requester.

Note! If the PIR is shared between 2 plants, they should be contacted in order to agree on the order unit.

  • Option 1: If they are different buyer needs to negotiate with supplier and local sites (inventory management and production teams)
  • Option 2: Change the order unit of measure on the Purchase Requisition. - link

Composites:

This field should be aligned with unit of issue. If there is a request to update unit of issue, it needs to come via Sharepoints and the buyer's approval attached to the workflow. 
Note! Purchasing, Inventory Management, and production needs to be involved as the Issue unit should be what is on BOMs.  

Go to Purchasing Organization Data 1 view

Pressing Enter will move you to Purch. Org. Data 1

 

Main activities

Tips/Best practices

Technology Solutions

Composite Materials

Planned Delivery Time


If pre-populated with a value lower than 5 days, update to 5 days
Purchasing group



Material Purchasing Group
Industrial Supplies (ZERS)

YBM for plants 8359, 8371 (US)
YMF 8373 (CA)
YBH for plant 8356 (MX)

Other material typesChange only if requested







Reference file

Material Purchasing Group
Raw MaterialsThe planners should add the correct buyer in copy when submitting the request. The purchasing group to be used should be from the buyer on the email.
Intercompany (Stock transfer Orders)

Check where the receiving plant is located and choose the purchasing group lists on the INTERCO / INTRACO (STOCK TRANSFERS) section.

  • Example: 
    • For US based STOs (where receiving plant is US based) - FJ0
    • For GB/UK based STOs (where receiving plant is EU based, for example GB, Wrexham, K&N Bonded and Non Bonded) - FH0
Packaging (ZVER)The purchasing group is defined based on the material group. In order to determine the correct code, refer to tabs: EU (Europe) Packaging or NA (North America Packaging, based on the plant location for which PIR is created.
Industrial Supplies (ZERS)Should be the Site Buyer code per plant plant

Standard Quantity

 

Always 1 if no special requests

Tax Code

Check location of plant and Vendor


Other countries

Plant Country

Local Tax

Import Tax

Australia

C”

D”

Brazil

GO* May have more than one option

GO

Canada

LY

AS

Chile

LR

LQ

China (TS Plant)

LC

JP

China (CM Plant)"OJP

Korea

IE


IndonesiaVXVO

Mexico

NK

NF

Peru

MM

ML

Taiwan (plant 8815) LNAS
Japan"KJW

USA

LN

AS

Europe

Import procedureApplicable for European plants only (Please refer to table above)If the plant that you are creating the PIR is in the same country of the supplier, no import procedure is required.
If the plant that you are creating the PIR is in different country of the supplier then import procedure is required based on vendor's location

Enter Net Price


As requested 

For Brazil Plants (8789) - Intercompany (p. org 3200): Must have price in
USD (Condition ZI01). Contact Sol Silva (Sol.Silva@solvay.com) for the price.
Note! If the price pulling in the PIR is not default USD, also check the vendor master which should have USD currency at plant 8789.

As requested 

  • For STO's:
    The price is required only when the Intercompany vendor is out of WP1
    • How to identify: creates the source list first and if the PPL (Procument plant) populates with plant then you know that the vendor/plant is within WP1
  • For STO's within WP1 - Intercompany: conditions or price needs to be deleted

Incoterms 1 and 2

Mandatory for all!As informed
  • For Brazil Plants (8789) - DAP SANTOS PORT
  • For STO's (p. org 3200) if not provided by the requester use as default CIF DESTINATION
  • For ZERS (Materials with Division WA): Use PPD Destination as default Incoterms in cases when value is not indicated by requestor


Note!
No "." should be used for the second part on the Incoterms, if not provided, clarify with the requester

As informed 

For STO's (p. org 3200) if not provided by the requester use as default DAP DESTINATION

Note! No "." should be used for the second part on the Incoterms, if not provided, clarify with the requester.

US: EXW = Collect for domestic shipments; Pre paid (PPD) can be used only for US domestic; any supplier paid shipments coming into US, can not be PPD it should be DDP.



Confirmation Control Key (CCK)

Check Incoterms

If Incoterms are COL - always Z003, (exception if going from Kemira to Kemira’s plant 8543 then blank). 
For Brazil Plants (8789), CCK is always Z016

For rare cases where there might be, if materials are purchased on consignment, Tax code is LU

US only: For PIRs that are with tax code LN AND INCOTERMS COL ORIGIN Confirmation control key should be populated as Z003;

US only: For PIRs that are an import and Solvay is the importer of record (buyer will know this) confirmation control key should be populated as Z004;

For PIRs that are with tax code LU Confirmation control key should be populated based on the vendor’s country. For domestic - Z003 and for Imports - Z004.

For STO when the receiving plant is located in China confirmation control key should be Z004

GR-Bsd IV
Always checked

For Brazil Plants (8789) - Intercompany (STO): Not marked
Always checked


Ackn. rqd

Order acknowledgement tick mark is mandatory for all PIRs that are from a regular vendor. This includes sites that are not live in WP1, i.e. PE1 and any other Solvay sites that may not be in WP1, but have non-intercompany vendor code as well as go under Purchasing organization 3200.

All STOs (transfers between sites that are live in WP1) DON’T Need the tick mark there. 

Pricing Date Control
For Brazil Plants (8789), Always 1

Price date category is based on whether or not the material is an import (considering against the receiving plant). Applicable for all regions
1 (Purchase Order Date) = Import
2 (Delivery Date) = Domestic

If a vendor is US and plant is in GB, it’s an import = 1
If it’s US to US, domestic  = 2

Go to Conditions view

 


 

 

Main activities

Technology Solutions

Composite Materials:
Valid fromAs per request, if not provided today's dateAs per request, if not provided today's date

Update the valid to period

The validity period to be used is 31.12.2025 (All material types)

For plant 8789 - 31.07.2021

The validity period to be used is 31.12.9999 (ZMAT and ZVER)

For ZERS (Materials with Division WA) - The validity period to be used is 31.12.2021

Click on




Main activities

Key points

Go to Texts view


Main activities

Key points

Purchase Order text

Double click the Purchase order text field to add longer tests via text editor – see step below

Main activities

Key points

Purchase Order text in text editor

For ZERS (Materials with Division WA): Check the request form, if not provided add the material´s long description.

For other material types add only if requested.

Click on


Click on  to save the PIR


The PIR number is displayed in the confirmation message at the bottom of SAP screen – copy it to request form for further reference

2.1.2.1 Adding Scale

When in conditions we are able to add Scales related to the price of the material. 

Some items we can have discounts when we buy in a higher quantity.

Main activities

Key points

Select the price line


Click on Scale 

 

Main activities

Key points

Add the scale quantity


Add price for new quantity

 

Save it 



2.1.2.2 STO PIRs

For Stock Transfer Orders we have 2 types:

  • Intra STO's: Trading between plants on the same company code. Only Source List is required (Skip to section 2.2. Source list creation)
  • Inter STO': Trading between company codes. PIR and Source List are required 

When creating a STO (Stock Transfer) PIR, we need to delete the condition in order to the correct price reflect for the item. 

NOTE: ALL STO PIRs ARE CREATED FOR PURCHASING ORGANIZATION 3200, NO NEED TO UPDATE THE “VALID TO” IN THIS CASE.

After saving the new PIR, go back to the conditions and follow the procedure below:

Main activities

Key points

Select Price line


Delete 

Confirm deletion

Save it

As informed


2.1.2.3 Adding Freight condition


Main activities

Key points

Condition type

As informed

Price

As informed

Currency

As informed


Note! The list below are those that will print on a PO output sent to a supplier. 


2.1.3 Change PIR

Main activities

Key points

Enter transaction ME1M


Vendor 

If informed, otherwise keep it blank

Material

As informed

Purchasing Organization

If informed, otherwise keep it blank

Plant 

If informed, otherwise keep it blank

Click on

 



Main activities

Key points

Select PIR

 

Press Change Info Record 

 



Main activities

Key points

Go to Conditions



Main activities

Key points

Single click on the valid period


New with reference



Main activities

Key points

Validity From

As informed, other wise current date

Valid to

if not informed, end of current year

Amount

As informed

Per

As informed

Price Unit of measure

As informed

Save it 




2.1.4 Delete PIR

Important!

PIR’s created for plants [WP1] not maintained by Data Operations Riga [Industrial Supplies]:

  • Freshdesk ticket for other Data Operations team should be created.
    • Data Operations Curitiba;
    • Data Operations Lisbon;
    • Data Operations Bangkok; 

PIR’s created for purchasing organisation [WP1] 3012; 3020; 3028; 3004 [Industrial Supplies]:

  • Created / Inactivated by Data Operations Riga team.
    • Site Buyers or Store Room Owner in charge must be informed of any inactivation’s and creations of new PIR’s in case of Duplicate accounts/Tax ID changes.

PIR’s created for other Purchasing Organizations [WP1]:

  • Maintained by Site Buyers’s and/or Data Operations Riga [Raw Materials] for Technology Solutions & Composite Materials.
    • The buyers/planners should be informed on the inactivation

PIR's created in PF1_020 are maintained locally, buyers should be contacted based on this list.


Main activities

Key points

Enter transaction ME12 or ME1M as on Change section


Vendor 

Information provided in the request

Material

As informed

Purchasing Organization

As informed

Plant 

As informed

PIR category

If not informed choose Standard

Press enter



Main activities

Tips / Best practices

Key points

Purchasing Group


E00

Extras > Deletion Flags

Shift + F12



Main activities

Key points

Complete info record

Flag if Full PIR should be deleted

Purch. Org. Data

Flag if only plant/p. Org data should be deleted.

Go to Conditions



Main activities

Key points

Double click on the valid period



Main activities

Key points

Validity To

Date in the past

Save it 



2.1.5 Re-activating a supressed PIR

Requests to re-activate PIR that is marked for deletion can be received.


Main activities

Key points

Enter transaction ME1M

Full path: Logistics -> Materials Management -> Purchasing -> Master Data -> Info Record -> List Displays -> By Material


Main activities

Key points

Enter material number


Click on



Main activities

Key points

Check value in Deletion Flag column


Select the PIR to be re-activated


Click on Change Info Record button

Alternatively F7 can be used.

Warning message(s) will be displayed to inform that the record is flagged for deletion.


 



Main activities

Key points

Go to Extras -> Deletion Flags

After removing deletion flag take care to update other information – Purchasing Group, Net price, currency, unit and validity period, Incoterms.


Main activities

Key points

Un-check the Deletion flag box(es)

Save the changes by clicking

Save the changes by clicking



2.2 Source List

A source list is needed every time a new contract is created, a new line is added in an existing contract or when a PIR is created.


We have 2 options on how to create/update source list

1st option:

2.2.1 Creating Source List


Main activities

Key points

Enter transaction ME01


Material

As informed

Plant

As informed

Press enter




Main activities

Key points

Click on generate records



Main activities

Key points

Press enter or click on confirm



Main activities

Key points

Select “Not changed”


Press enter or click on confirm




Main activities

Technology Solutions

Composite Materials

Valid to

The validity period to be used is 31.12.2025 (All material types)

The validity period to be used is 31.12.9999 (ZMAT and ZVER)
For ZERS (Materials with Division WA) - The validity period to be used is 31.12.2021
MRPImportant! The MRP should be populated with default 1 if there is only one vendor, when you have more that one source vendor, return to the requested in order to confirm the main source of supply
Blk (Block)The block should be used only when requested by the buyer 

Save it 




2nd option:

Main activities

Tips / Best practices

Key points

Valid from


Today’s date

Valid to


If contract - validity to from contract/PIR

If PIR or STO - 31.12.2999

Purchasing Organization


From contract/PIR

Purchasing Plant

Ony for STO

Add Shipping from plant (source plant)

Contract

For external Purchase

Add contract# 

Item

For external Purchase

Add line from contract related to the item

MRP Relevant 

If there are several sources, we should verify with Buyer, which source needs to be marked as MRP relevant. 

Always 1

Save it 




2.2.2 Deleting Source List


Main activities

Key points

Enter transaction ME01


Material

As informed

Plant

As informed

Press enter




Main activities

Key points

Select the line to be deleted


Press


Save



2.3 Creation of contract

2.3.1 Prerequisites

A contract is created in WP1 when:

  • Some special negotiation was made with the vendor, for example, some specific material is paid with better terms than it is already set up on Vendor Master Data.
  • For subcontracting/standard when the delivery address should be defaulted as a drop ship address of another supplier/subcontractor
  • When the currency needs to be different then the vendor master
  • For a separate Goods Supplier vendor number

NOTE: THIS IS NOT A STANDARD PROCESS AND SHOULD BE PERFORMED ONLY WHEN NO OTHER OPTION IS AVAILABLE.

2.3.2 Checking for duplicates

 

Main activities

Tips / Best practices

Key points

Enter transaction ME33K

T-code can be entered directly in Command field. T-code can be saved in Favorites.


Press multiple choice button to receive pop-up window with search options for material master

you can also press F4


Main activities

Tips / Best practices

Key points

Select Purchasing Documents per vendor

T-code can be entered directly in Command field. T-code can be saved in Favorites.


Add vendor


Information provided in the request

Purchasing Document Category


Always K

Press enter

If no values return, you can proceed with the creation



Main activities

Tips / Best practices

Key points

Enter on contracts that shows up

We have one contract by plant. In case it’s not the plant requested, proceed with contract creation, otherwise add item to the existing contract.



2.3.3 Creating a contract

Main activities

Tips / Best practices

Key points

Enter transaction ME31K

T-code can be entered directly in Command field. T-code can be saved in Favorites.


Vendor 


Information provided in the request

Item category

Standard - blank

Subcontracting - L

Agreement type


WK - Value based Contract

For subcontracting you have MK - quantity based contract)

Purchasing Organization


Consult the Appendix  - Purchasing Organizations

Purchasing Group


Plant buyer code

For Composite Materials: (group starts with Y…i.e. YFJ..)

Press enter





Main activities

Tips / Best practices

Key points

Validity end


As requested

Composite Materials: 31.12.9999

Target Value 


Leave blank


Note! In the header you can also set up some different information other than the one in vendor master data, such as different payment term, incoterms, etc. (this information will be the one selected when PO is created)


Press Item Overview 




Main activities

Tips / Best practices

Key points

Material 


As informed

Order Unit

If not populated, it will get from Material Master


Target Qty.For MK (Subcontracting) types only

Put the highest value possible

Example: 999,999

Net Price

NOTE: Price can only be added with 2 decimal characters, in case price informed is as example $1.012 USD/EA > net price would be $10.12 and per will be 10

As informed

Per


See above example 10

Order Unit Price


As informed

Text
As requested (notepad icon)
Incoterms
As requested (puzzle icon)
Partner functionsIf GS is different from standard of that supplierAs requested (people icon)
Delivery addressEnter drop ship vendor number into vendor field to change delivery addressAs requested (truck icon)

Save it 

After the contract  is created, source list should be created


 

2.3.4 Adding new item in an existing contract

Main activities

Tips / Best practices

Key points

Go to transaction ME32K

T-code can be entered directly in Command field. T-code can be saved in Favorites.


Add contract number



Main activities

Tips / Best practices

Key points

Material number

Find the first blank line
Follow the same procedure as step XX to XX

Add information as requested

Save it




2.3.5 Changing items in an existing contract

Main activities

Tips / Best practices

Key points

Go to transaction ME32K

T-code can be entered directly in Command field. T-code can be saved in Favorites.


Add contract number



Press enter




Main activities

Tips / Best practices

Key points

Select line that needs to be changed

T-code can be entered directly in Command field. T-code can be saved in Favorites.


Click on conditions




Main activities

Tips / Best practices

Key points

Single click on the valid period



New with reference




Main activities

Tips / Best practices

Key points

Amount


Information provided

Save it 

Note: Additional information can be changed also (texts)



2.3.6 Changing Target value in an existing contract



Main activities

Tips / Best practices

Key points

Go to transaction ME32K

T-code can be entered directly in Command field. T-code can be saved in Favorites.


Add contract number



Select Header Details 




Main activities

Tips / Best practices

Key points

Change to Target value to the information provided



Save it 




2.3.7 Deleting item in an existing contract

Main activities

Tips / Best practices

Key points

Go to transaction ME32K

T-code can be entered directly in Command field. T-code can be saved in Favorites.


Add contract number



Press enter




Main activities

Tips / Best practices

Key points

Select Line(s) you want to delete



click on “Delete” 



Save it 



Main activities

Tips / Best practices

Key points

After deleting all lines go to header



Change Validity end to the past



Save it 




2.4 Quota Management

Procedure available in the link below:
WP1 - Quotas Management 
Quotas management - Print Screen

Appendix - Approved Requesters - Technology Solutions

  • Direct Procurement PIR (Raw Material and Packaging) and Third party: Only Buyers. In case there is a request from planner add the buyer once you update the price/create the PIR.
    • Packaging NA: Stephane Labelle / Matt Kalat
  • Intercompany PIRs: Buyers or Planners
  • Plant 7008 Willow Island - 8359 is shared between Technology Solutions and Novecare
  • Plant code 8536 -7008 / Allchem Service Houston & 8553 -7008 / South Coast Houston.
    • Requests can be accepted from Vincent Cifelli

The full list can be found here.

NOTE: Requests from Finance team related to Kemira Water Solutions vendor,  can be accepted without further approval. The supplier sends to Finance the summary billing invoice which is reviewed and Finance decides which prices to use as planned for the next period. The Buyers are not involved, since the type of operation with Kemira is tolling and not purchases.



ZERS (Materials with Division WA) and PIR
creation/modification/deletion

PIR creation/modification/deletion
PlantBuyerStoreroom OwnerLPR
8359Willow IslandUSDennis Andlinger

Tami Smith
Benjamin Burns

Procurement team
8371Mount PleasantUS

Terrence Bybee
Norm Hein
Mike Metcalf

8373WellandCAPeter Mertzanis

Jesse Ostap
Alex Cavasin
Peter Anikejew

8356AtequizaMXCesar RivasAlberto MoraAbril Gomez (Maternity leave)
Replacement: Vincent Cifelli and Eduardo Rubalcaba Guizar
8486FengxianCNShen JieMing Liu
Sarawut Sonmuang
Ming Liu
Sarawut Sonmuang


Appendix - Approved Requesters - Composite Materials 


Strategic buyers (Raw Material Buyer) and Site buyers are trained to create PIR's, Contracts and Source List as Riga Data Operations team, they are the owners of this data/process. Planners can also request PIR creation, since they can either turn to the Strategic buyers (Raw Material Buyer) and Site buyers or to Data Operations team. For Source List creation no approval is required.

The full list can be found here (Note: this is only a guidance file).


Note! Planners can ask without buyer's approval: Planned delivery lead time; vendor material number; text changes


Note! The table below should be used only for ZERS - Industrial Supplies, for full table of approvers check the link


ZERS (Materials with Division WA) and PIR
creation/modification/deletion
PIR creation/modification/deletion
PlantBuyerStoreroom OwnerOthers
83677180 PiedmontUS

Kay Drake

David Williams
Matt Holland
David Lynn

Procurement team
8456 

7180 KalamazooUS

8785

7180 Rock Hill

US

8350

7771 Wrexham

GBKen SharpBen PineProcurement team
83617180 OrangeUSMichael EnesIan TachellProcurement team
8363

7180 Anaheim D'Aircraft

US
83647180 AnaheimUSProcurement team
83657180 Greenville, TXUSMichael Adler


Robert Long (Greenville)
Derek Johnson


Procurement team
83687180 Havre De GraceUSProcurement team
83707180 WinonaUSProcurement team
83477772 OestringenDESteffen Schweickert
Procurement team


Appendix - Additional Definitions

CONSIGNMENT 

A form of business in which a vendor (external supplier) maintains a stock of materials at a customer (purchaser) site. The vendor retains ownership of the materials until they are withdrawn from the consignment stores. Payment for consignment stock is required only when the material is withdrawn for use. For this reason, the vendor is informed of withdrawals of consignment stock on a regular basis.

SUBCONTRACTING

An instruction to a supplier (subcontractor) to manufacture an ordered part, material or assembly using specified "materials to be provided" (free-issue materials).  A subcontract order contains a maximum of one order item for the ordered material, service, or work, and one or more "material to be provided" items for materials that the ordered makes available to the subcontractor, without charge, for processing.

Appendix  - Q&A


In this link we have a Q&A where we can find the most common questions and answers regarding this activity.

Appendix  - Embargo check in Purchase Order


If the following message appears, trade.control@solvay.com team should be contacted.




Appendix  - ARIBA Project


Once a vendor in enrolled in the ARIBA project the following set up will be created in SAP


  • Vendor Master: Search Term 2  → Contains ARIBA
  • Purchasing Organization / Plant Level → Confirmation Control Key field contains one of the values: Z017; Z018 or Z019
  • PIR or Contracts →  Confirmation Control Key field contains one of the values: Z017; Z018 or Z019


When these criteria are matched, it means the supplier is working with Solvay using the Ariba Platform, receiving Purchase Orders and sending Invoices.


If we already have the above information at Vendor Level and Contracts / PIR, all new creation will assume the code by default that cannot be removed, unless the request comes from the Ariba Team.
All new PIR / Contracts will take the default Control Key from Purchasing / Plant Level.

Appendix - Table of Incoterms