Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


Panel
borderColor#4DBED3
bgColor#4DBED3


SYMPA ACADEMY



HideElements
metastrue
breadcrumbtrue
childpagestrue
titletrue
space-logotrue
labelstrue
Viewtracker
hidetrue




Panel
borderColor#B2E2EC
bgColor#B2E2EC

Structure of the training


Panel
borderColor#B2E2EC
bgColor#f2f2f2

1- The first part explains the construction of the BFC P/L. Several concepts need to be presented such as Master Data, closing process and Product Costing. Master Data are the static concepts used to carry out properly the closing process. Closing subsection demonstrate the dynamic use of the master data. Product costing is a sub-product but it is an important section because a big amount of the Cost of Goods Sold (COGS) is built during product costing process.  

2- The second part presents all the reports to be used to carry out performance analysis and how you can use those reports.


Image Added






Panel
borderColor#B2E2EC
bgColor#B2E2EC

Read me first

Introduction


Expand
titleUnderstand BFC P&/L

 

SECTION 1 Construction of the P&L
methodology

Include Page
SYMPA academy - Understand BFC P/L methodology
SYMPA academy - Understand BFC P/L methodology


Expand
titleHow P&L is builtWhere are the data coming to build BFC P/L

Include Page
Where are the data coming from to build BFC P/L?
Where are the data coming from to build BFC P/L?


Rules P&L - PF1

Panel
borderColor#B2E2EC
bgColor#B2E2EC

SECTION 1 Construction of the P/L

 
Include Page
Rules P&L - PF1


Expand
titleMaster data


Expand
titleOverview of the CO structure


Expand
titleCO structure

Include Page
CostFAQ:Rules - CO structure - PF2
CostFAQ:Rules - CO structure - PF2


Expand
titleBusiness structure

Include Page
CostFAQ:Rules - Business structure
CostFAQ:Rules - Business structure


Expand
titleProduct hierarchy

Include Page
CostFAQ:Rules - PF1 - PIF
CostFAQ:Rules - PF1 - PIF


Expand
titlePlant

Logistics Organizational Unit representing the place where either materials are produced or goods and services provided.

Identification of production and non production plants.

Use in CO:

  • Organizational Cost Centers standard hierarchy 
  • Profit Centers standard hierarchy 
  • Cost Object Hierarchy (first 2 levels in the structure) 
  • Materials: To identify the ones relevant for costing and to be updated during the Project (Accounting / Costing views). 
  • Material Ledger activation (customizing).


Expand
titleCountry code

1 digit code identifying the country inside Solvay ERP.

Use in CO:

  • Reporting Profit Centers codification at PIF level (position before last)


Expand
titleEstablishment code

It is used in the codification of the Cost Centers (=first two digits) in PF1.

The establishment code is a combination of a legal company on a site

  • SM = cy 0001 SCH
  • XR = cy 0270 Solvay Quimica, Italian in Rosignano
  • SV = cy 0306 Solvay Portugal, Prod Quim.

The codes are part of the enterprise structure and managed by Core Tables 

The establishment code can be displayed with PF1 PF2 - ZPRI Display table ETAB


Expand
titleStructure axes

Include Page
CostFAQ:Rules - PF2 - Activity 1
CostFAQ:Rules - PF2 - Activity 1



Expand
titleCost element


Info
titleSAP t-code

KA03 - Display Cost Element


Expand
titleCodification

Include Page
CostFAQ:Rules - Cost Element codification - PF1element Codification
CostFAQ:Rules - Cost Element codification - PF1element Codification


Expand
titleCost elements group


Info
titleSAP t-code

KAH3 - Display cost element group


Expand
titleZRCS-FC

Include Page
CostFAQ:Rules - Cost element Group ZRCS-FC
CostFAQ:Rules - Cost element Group ZRCS-FC


Expand
titleXCS-ALL

 

Include Page
CostFAQ:Rules - Cost element Group XCS-ALL
CostFAQ:Rules - Cost element Group XCS-ALL




Cost Collector
Expand
titleCost Center

 


Expand
titleA. Standard hierarchy & codification


Expand
titleStandard hierarchy

 

Include Page
CostFAQ:Rules - PF1 PF2 - Cost Center Standard hierarchy
CostFAQ:Rules - PF1 PF2 - Cost Center Standard hierarchy


Expand
titleReporting Cost Centers - PF1

 

Include Page
CostFAQ:Rules - PF1 PF2 - Cost Center Reporting codification - HISTORICAL INFORMATION ONLY !
CostFAQ:Rules - PF1 PF2 - Cost Center Reporting codification - HISTORICAL INFORMATION ONLY !


Expand
titleOrganizational Cost Centers - PF1

 

Include Page
CostFAQ:Rules - PF1 PF2 - Cost Center Organizational codification
CostFAQ:Rules - PF1 PF2 - Cost Center Organizational codification



Expand
titleB. ZCBS hierarchy

 

Include Page
CostFAQ:Rules - Cost Center ZCBS hierarchy
CostFAQ:Rules - Cost Center ZCBS hierarchy


Expand
titleC. Validity date

 

Include Page
CostFAQ:Rules - Cost Center Validity date
CostFAQ:Rules - Cost Center Validity date


Expand
titleD. Profit Center

The Result (Reporting) Profit Centers are the basis for Group reporting

All elements for BFC statement are extracted from the Profit centers (except NETV, QTV and TPT which are extracted from CO-Profitability Analysis -> CO-PA). To make this extraction work (through interfaces), all objects in CO must be assigned to a profit center;
  • Material (plant level, Costing view)
  • Cost centers
  • CO orders
  • PM orders
  • PP orders
  • Cost collectors
  • WBS
The Result Profit centers are depending on the Profit center group “CHEFCHEOPS”. These profit centers are generally assigned to all the ERP companies;
The non reporting Profit Center are in group “CHEF_CNTRL
 


Expand
titleOrganizational Profit Centers

 

Include Page
CostFAQ:Rules - PF1 PF2 - Profit Center Organizational codification
CostFAQ:Rules - PF1 PF2 - Profit Center Organizational codification


Expand
titleReporting Profit Centers

 

Include Page
CostFAQ:Rules - PF1 PF2 - Profit Center Reporting codification
CostFAQ:Rules - PF1 PF2 - Profit Center Reporting codification



Expand
titleE. Business area

Include Page
CostFAQ:Rules - Cost Center Business Area
CostFAQ:Rules - Cost Center Business Area


Expand
titleF. Responsible

The person responsible of a cost center is accountable for the elements allocated in the cost center

The companies using SRM7 for purchasing should have a SRM7 user ID (=BIP user ID) entered in this field, starting with 5, such as 50000000

To display the list of person responsible use the report PF1 PF2 - SRM Validators in cost centers


Expand
titleG. Name in english

Usually the name & description of a cost center is free but in some cases there can be special needs.


 
Expand
titleH. Assessment cycles
Cycles


Expand
title
Assessment cycles

Definition

Cost object in Product Cost by Period that collects the periodic actual costs incurred in the production of a material. When a cost collector is used, the product is the main cost object. 

Use

Product cost collectors are independent of the production type. This means that costs can be collected on product cost collectors in the following production environments:

  • In order-related production (using production orders) to analyze the costs by period rather than by lot;
  • In process manufacturing (using process orders) to analyze the costs by period rather than by lot;
  • Repetitive manufacturing: product cost collectors are used as cost objects. 

Practically speaking

Cost collectors are independent of the production type. This means that costs can be collected

Expand
titleAllocation Structure
  • All Organizational Cost centers, depending on the original cost elements posted in them, have to allocate their cost as Fixed Cost or Depreciation.  Also in the case of Utilities partially as variable
  • Sometimes it may be necessary to track these allocations with separate assessment cost elements so they can be used for instance to determine the origin of the cost for product Costing purpose (activity types / Cost component structure or PRG)
  • This can be done creating several segments for each cost center or cost center group allocation
  • But we may SIMPLIFY this allocation by unifying all the multiple allocation into a single segment, using an allocation structure.
  • With this, we may also adopt standardized assessment cycles for all companies, treating equally the allocation of cost elements and cost centers to Reporting CC or to Production CC
  • We’ll have just one segment per cost center
Expand
titleSplitting Structure
Splitting structure is used in cost center planning to define which cost elements are considered for calculating which prices of activity types, when a cost center has more than one activity associated to it, and the price is not manually determined (most of the cases in production CC). Also for actual price calculation of the activity types. It links Cost elements (and its amounts) with activities types of a given production CC.
  • It is done at CC level. 
  • The level of complexity is determined by the different types of activity types used in production CC.
  • The right design of the splitting Structure/Activity Types  is a preliminary step to have the Cost Component structure as detailed or as simple as we want.
Expand
titleCost Component

Cost Component structure are used to classify within the cost collector which cost elements are fixed, variable or Depreciation. But not only this. The level of granularity depends on the GBU election (election of Cost Component), but it has to be coherent with activity types. It links them to material ledger classification

  • It is customized at Company level. 
  • The level of detail provided and its complexity is determined by the different types of activity types used in production CC.
  • The right design of the Splitting structure / Activity Types  is a preliminary step to have the Cost Component structure as detailed or simple as we want.
Expand
titleClosing

 


Info

An assessment cycle is used in SAP to assign all primary cost elements and secondary cost elements from a sending cost center to the receiver cost center.When you want to transfer costs from one cost center to another through an assessment cycle, sap use a secondary cost element and accumulates all the primary cost and secondary cost and send it to the receiving cost center.

Include Page
CostFAQ:Assessment cycles
CostFAQ:Assessment cycles


Expand
titleDistribution cycles


Info

distribution cycle is used in SAP to transfer primary costs from a sender cost center to receiving controlling objects. The original cost element remains the same. 

Include Page
CostFAQ:Distribution cycles - PF1
CostFAQ:Distribution cycles - PF1


Expand
titleCOPA cycles


Info

COPA Assessment cycle assesses costs from a Cost Center to COPA Value Fields. 

Include Page
CostFAQ:COPA cycles - PF2
CostFAQ:COPA cycles - PF2



Expand
titleKey Principles

Include Page
Costing Key Principles - PF1
Costing Key Principles - PF1



Expand
titleCost Collector

Include Page
Cost collector
Cost collector


Expand
titleAllocation Structure

Include Page
CostFAQ:Allocation structure - PF1
CostFAQ:Allocation structure - PF1


Expand
titleSplitting Structure

Include Page
Splitting structure - PF1
Splitting structure - PF1


Expand
titleCost Component

Include Page
Cost Component Structures - PF1
Cost Component Structures - PF1



Expand
titleClosing

Include Page
Understand the closing process
Understand the closing process


Expand
titleProduct costing

Include Page
Understand the closing process
Understand the closing process


 
Panel
borderColor#B2E2EC
bgColor#B2E2EC
Expand
titleProduct Costing-PL

SECTION 2 Usage of different reports to explain

PL

the P/L


Expand
titleKE30
Use PF2 - KE30 - Report Z1KCHEOPS to have a report of Sales (R10000) & variable logistic costs (R12910)

Image Added 



 Open a data source or workbook
Expand
titleBW


Info

PF1 Data have been merged in BW – production - WBP to facilitate the analysis of GBUs using WP1 & PF1. For more details, you can visit RtR PE Reporting

Access WBP and Open data source or workbook or go to BW - Analysis Workbook Guide for more details regarding BW

To have the P&L in BW you can use the report ZZKPL_M01_BASIC_02


Expand
titleZZKPL_M01_BASIC_02 - Basic Report

 

Include Page
ZZKPL_M01_BASIC_02 - Basic Report
ZZKPL_M01_BASIC_02 - Basic Report


Other reports that can be used

ReportDescription of the report

ZZKPL_M01_CONSO_01

P&L - Consolidation Report.

Not used at legal entity level but used by GBU controllers. It is set-up with the consolidation methodology used in BFC

ZZKPL_M01_CONSO_03

P&L - Consolidation Report

Integrated Margin. It considers the Margin taking in account the production cost at Origin. Only available for SpP and Soda Ash (active also for Peroxide but not validated yet with GBU controller).

Expand
titleAccess a BW report
Include Page
Open a data source or workbook




Expand
titleGR55

Include Page
CostOP:PF2 - GR55 - BFC Monthly evolution
CostOP:PF2 - GR55 - BFC Monthly evolution
 



Expand
titleML

Include Page
Material ledger - reports
Material ledger - reports
 



Expand
titleCCs Reports

With S_ALR_87013615 - Breakdown by Partner,

Info

To have a report of R25460 - Absorption variance: Period non-proportional costs of production (excl depr) & R25860 - Absorption variance: Period non-proportional depreciation of production

Select:

  • Cost centers group : CCCCXXCC; where CCCC is company code XX the 2 digits of the division (or activity 1)
  • Cost elements group. Use the group Rules - Cost element Group XCS-ALL or its subgroups
    • XCS-FCPE  in case you want to report Period Fixed costs
    • XCS-DEPPE in case you want to report Period Depreciation

Image Added

Info

To have a report of Administrative expenses (non-functions) (R33310), Commercial expenses (R33320) & Shared service function expenses (function costs at the origin) (R33400)

Select:

Image Added


Warning

The report will not tie with the P&L when:

  • there are direct posting in Reporting cost centers,
  • there are costs centers not using the appropriate allocation structure

 




Expand
titleQlikView

Include Page
CostFAQ:Qlikview Fixed costs dashboard
CostFAQ:Qlikview Fixed costs dashboard



Expand
titlePRG

Use the report PF2- Z1K_MATCOST_SYMPA - Prix de revient

There are PRG

templates that:

  • Are provided to controllers for their scope: Entity - plant
  • There are adapted to local request.
  • Filters can be changed by controllers: eg unfilter depreciation services. Or they can add other dimension.


Image Added 



Expand
(*) RECONCILIATION FC
titleFixed costs reconciliation

Include Page
PF1 - Fixed costs reconciliation
PF1 - Fixed costs reconciliation