- Created by François LE, last modified on Feb 12, 2020
You are viewing an old version of this page. View the current version.
Compare with Current View Page History
« Previous Version 26 Next »
| Authorized flow | Is often referred to as the assignment table, that is, who must send which goods to a given site. |
| Active BFR | Active Working Capital Requirements WCR = Besoin en Fonds de Roulement (BFR) |
| Active DFUs: | Active DFU is the results of the default automatic activation with the manual activate/deactivate option. By default, a DFU coming from SAP is active |
| Actual shipped & Remaining Demand | In the past : Shipped history (departure date) |
| Alert : Demand Order Book | Sum of Order book (requested departure date) |
| Assignment %: | Who must send how much percentage of which goods to a given site. |
| Approval (homologation) | To substitute a product by the same one but not produced at the same site |
| BW | Business Warehouse |
| BU | Business Unit |
| Batch Size (or incremental quantity) | Production must be a multiple of indicated quantity. |
| BFR 03 | Working Capital Requirements WCR = Besoin en Fonds de Roulement (BFR) of 3 months |
| BFR 06 | Working Capital Requirements WCR = Besoin en Fonds de Roulement (BFR) of 6 months |
| BFR 09 | Working Capital Requirements WCR = Besoin en Fonds de Roulement (BFR) of 9 months |
| Budget | Budget uploaded in DynaSys |
| BOM (Bill of Material) | A bill of material is applied to a production plan (with finite or infinite capacity) to calculate a dependant requirement |
| Bulk | Type of a packaging: amount of production in volumes |
| Big bags | Type of packaging |
| Backorder | Orders that can't be fulfilled at the moment but still taken into account so it will be fulfilled later |
| Calculation history and raw forecast | In the past : Demand history corrected (review past sales) In the future : forecast calculated |
| CSR Collaborative review | Each month, the CSR has the possibility to indicate to the demand planner that he reviewed his forecast by ticking the collaborative button in the Web |
| CSR Comment for Demand Planner | Comment sent from CSR to demand planner |
| CSR Forecast | Forecast entered by the Customer Sales Assistant |
| CSR Forecast M-1 | CSR Forecast archived at the 6th of current year |
| CSR Overall comment | Comment entered at CSR level in the Web by sales rep for each run of forecast |
| DP | Demand planning |
| DIP-PP | Distribution & production planning |
| Datafield | Data type (ex: sales requirements / initial inventory / actual production...) |
| DC | Distribution channel |
| DFU (Demand Forecast Unit) | It is the smallest demand management unit which is Material x Shipto@DC combination = Material@shipto@DC in DynaSys |
| DFU created (last 3 months) | Indicator if the DFU has been created for the last 3 months by the interface |
| Deactivate DFU | True or False in order to force the deactivation of a DFU. Then, the DFU will not visible anymore by anyone in the system and the historical data/budget/forecasts will be lost (except if you made a supersession |
| Deactivation Comment | Comment put at the deactivation of DFU |
| Demand Order Book | Open order book in SAP (MD04) in ETA |
| Demand Review | Demand Review is fed by the sales team forecast and can be amended before final validation |
| DRP (Distribution Requirement Planning) | Allocating the demand from the distribution sites to the production sites. This calculation is cascaded by going upstream the distribution network |
| Deployment strategy |
|
| DoS (Days of Supply) | Cover stock converted into duration that says how long you can hold with that stock |
| ETA (Estimated time of arrival) | Usually is used in the customer view
|
| ETD (Estimated time of departure) | Usually is used in the shipper view
|
| External sales | Sales into the same S&OP Zone. |
| Forecast |
|
| Forced history and forecast | History & final forecast |
| Forecast Consumption - SIL | ratio = Shipped History (GI) + Order Book (ETD) / Gross history and final forecast |
| Forecast instability | ratio = Gap last month fcst vs new fcst / Forecast validated last month |
| Forecast validated last month | Forecast validated last month recovered from archives |
| To kill a forecast | Cancel actual production and leave it as it is at the moment |
| Final net price | Result of forcing loop : Net Price > forced net price |
| Flag new DFU | Flag new DFU |
| GBU | Global Business Unit |
| Gap Final Fcst vs Budget | = Gross history and final forecast - Budget |
| Gap last month fcst vs BFR | = Gross history and final forecast - active BFR |
| Gap last month fcst vs new fcst | = Gross history and final forecast - Forecast validated last month |
| Gap Order Book vs Final Forecast | = Shipped History (ETA) and Customer Request (ETA) - Gross history and final forecast |
| Gap Potential x Order Book | = Actual shipped & Remaining Demand - Gross history and final forecast |
| Gap Volume (Forecast vs BFR6) | = Gross history and final forecast - BFR |
| Gap Volume (Forecast vs Budget) | All GBU except PA : = Gross history and final forecast - Budget PA : = Final Forecast (ETD) - Budget |
| Gross history and final forecast | In the future (include current month) : Final Forecast In the past : PA , SI, TS, Perox except NA : Sales history (arrival date) EP : Sales history (departure date) SAD , Perox NA: Shipped history (departure date) |
| Intercos | Products shipped from a zone to another.
|
| Intersite | Trades between sites from the same continent (ex: sites at Livorno and Collonges) |
| Incorrect CSR | Check box if the DFU is assigned to the wrong CSR |
| Incorrect Sales Rep | Check box if the DFU is assigned to the wrong Sales rep |
| Invoiced History and Demand Review | in the future : Demand review in the past : invoiced history |
| Invoiced History and Final Forecast | in the future : Demand review in the past : Final Forecast |
| Invoiced Net Sales | Invoiced history net sales |
| Invoiced Qty | Invoiced history quantity |
| KPI | Key Performance Indicators |
| Lead time | Time from the moment the customer places an order (the moment the supplier learns of the requirement) to the moment it is ready for delivery + the time required to ship the parts from the supplier |
| Last update BUDGET - SILICA | Date of last time the budget was validated by Demand Planner |
| LC (Local Currency) | The Local Currency is the currency used for recording the sales price for each DFU, not affected by the exchange rate. It can be forced in DynaSys |
| Manual ABC lvl1 | DFU Classification ( A,B,C,N) |
| Minimum receipt plan | It is taken into account both by DRP calculation and deployment calculation, which enables to specify a minimum amount to be deployed, and to leave it up to DynaSys DSCP to calculate what remains. |
| Maximum distribution quantity | Can be useful for limiting deployment |
| NIOP (Network Inventory & Optimization Planning) | Calculates the optimum sourcing rule, which is then used in DIP to determine the plan |
| Netting = net requirements calculation | Difference between unconstrained demand and actuals + taking into consideration in transit & orderbook. |
| Order Book To Be Issued (Confirmed - ETA) | Order Book To Be Issued (Confirmed arrival date) |
| Order Book To Be Issued (Confirmed - ETD) | Order Book To Be Issued (Confirmed departure date) |
| Order book diff | = Shipped History (ETA) and Order Book (ETA) - Gross history and final forecast |
| Proposition to activate | Alert checked when : DFU is not active & “Activation Alert checked” is not checked & Future Demand |
| Proposition to deactivate | Alert checked when : DFU is active & “Deactivation Alert checked” is not checked & No: History & Final forecast [Y-2,Y+2] Actual Demand [current Month] CRM Value [Future] Demand Order Book [M+1, end Y+2] Budget [Y-1, end Y+2] BFR 6 [Y-1, end Y+2] |
| RTP (Ready To Plan) | It is a setup pre-configured, ready to use data set, implementing good practices and standardized indicators. It allows a production plan to be calculated complying with the capacities of all resources. |
| Reporting | To report results and data and major information, usually on a dashboard with KPI |
| Requirement | = need Different types of requirement:
|
| Ship-to | Customer / receiver |
| Ship to KA | Group of Ship-to (ex : Michelin is a ShiptoKA and Michelin France= Shipto, Michelin Poland= Ship-to) |
| SKU | Stock Keeping Unit (used DIP-PP) = Material@site in DynaSys |
| Site |
|
Sourcing | Where products are supplied from. There are 2 types of sourcing:
|
Shippings [ ... ] | Shippings met: packages delivered Shippings met on time: packages delivered on time Shippings met late: delay authorized for a delivery, once this delay is exceeded = shortage Shippings not met: packages not delivered |
| Shipped not billed | Delivery that was received and is not billed yet |
| SOB (sales of order book) | Sales orders ventilated by customer requested date in the futur |
| Sales history (arrival date) | Sales history (arrival date) |
| Sales Team Forecast | Input from the sales Rep |
| Sales Team Forecast consolidated | Result of forcing loop , the sales forecast copied in demand review |
| Sales Team Forecast M-1 | Recovered from archive of Sales Team Forecast consolidated M-1 |
| Shipped history (arrival date - current month) | Shipped history (arrival date) |
| Shipped History (ETA) and Customer Request (ETA) | In the past : Shipped history (arrival date) In the future : Order Book To Be Issued (Requested - ETA) |
| Shipped History (ETA) and Order Book (ETA) | In the past : Shipped history (arrival date) In the future : Open Order Book (Confirmed - ETA) |
| Shipped History (ETD) and Demand Review | In the past : Shipped history (departure date) In the future : Demand Review |
| Shipped History (ETD) and Final Forecast | In the past : Shipped history (departure date) In the future : Gross History and Final Forecast |
| Shipped History (GI) | Shipped history (departure date) |
| Shipped History (GI) + Order Book (ETD) | In the past : Shipped history (departure date) |
| Specific AP | Check box to force the S&OP Zone to AP |
| Specific EU | Check box to force the S&OP Zone to EU |
| Specific LA | Check box to force the S&OP Zone to LA |
| Specific NA | Check box to force the S&OP Zone to NA |
| SRep Collaborative review | Each month, the sales rep has the possibility to indicate to the demand planner that he reviewed his forecast by ticking the collaborative button in the Web |
| SRep Comment for Demand Planner | Comment sent from SRep to demand planner |
| SRep Overall comment | Comment entered at Sales rep level in the Web by sales rep for each run of forecast |
| Statistical Forecast- M-01 | Archive of last month of Statistical Forecast |
| Statistical history and forecast | Calculation history and Raw forecast |
| Substituted reference | Check box to activate supersession between two DFU |
| S&OP | Sales & Operation Planning = SOIP (I for inventory) = it covers demand management, and mid-term distribution and production planning (3-18 months horizon). |
| Shortage | forecast not fulfilled after a given delay |
| Workflow | Sequence of many activities aligned |
| Workshop | Place where goods are manufactured |
| Yearly trend | Relative yearly growth = average of the 12 next month sales divided by average of the 12 last month sales. |
| Zone | Geo Zone of ship to |
| Zone S&OP L3 | Zone S&OP at level 3 = ProductGroup:ShipTo@BU |
The best way to get IT support is to use the new
Service One Platform.