There are two types of data import - Static & Dynamic

  • Static data - Update of the master data from 2 sources : 
    • From SAP for the material data (SKU Plant, warehouse): Material Group/Subgroup, Production hierarchy, customer group/SubGroup
    • From Dynasys DP: SKU ship-to 

  • Dynamic data - Update of the data linked to the planning flows (MRP elements (Frim Shipment, Sales order book), Inventories, Actuals (Shipments, Production)...) through BW interface. 



The detail of the batches scheduling can be found here.


You will find below the data used in DynaSys DIP. The source of the data can either be DynaSys DP or SAP. Next to each description, you will find a link to the corresponding Wiki page in order to have more details about this specific data. 


> Master Data

DataDescriptionRelevant for DIP or PP ?SourceLink to the Wiki Page (For users)
SKU PW (Plant / warehouse)This element comes from SAP. If there are information on a Material@Plant combination, it will automatically create the SKU in the Dynasys database.Both (Mandatory)SAP (MM03)






Master Data from SAP

Material

Material information is managed in SAP. It is retrieved from MM03 SAP transaction and then transferred into Dynasys DIP.

Both (Mandatory)SAP (MM03)
Plants / Warehouses sites

Plants and warehouses sites are interfaced from SAP information following the list that is given to the SBS team. A new plant and/or warehouse can only be added by SBS in DIP.

Both (Mandatory)SAP (SE38 to create new plant)
MSS for a SKU (material@site)

The main shipping site for a SKU allows to create a network between 2 sites. Dynasys will automatically define a MSS for each SKU based on procurement type.

DIP (Mandatory)SAP (MM03 - MRP2 view)
Main production site (MPS)A main production site is the default production plant for a SKU. It can be determined in 2 ways. DIP (Not mandatory)SAP (MM03 - MRP2 view)
SKU Ship-toSKU ship-to are managed through DFU activation / deactivation in DP.Both (Mandatory)



Dynasys DP



Master data from Dynasys DP

DFU Activation/Deactivation

Activate or deactivate a DFU following the need. 

It also allows to clean the scope of each user.

Both (Mandatory)

Ship-to sites

Ship-to sites from Dynasys DIP are based on DFU activation in DP.Both (Mandatory)
MSS for a DFU

The Main Shipping site for a DFU allows to create the link between a customer and a site.

DIP (Mandatory)

> Production / Distribution

DataDescriptionRelevant for DIP or PP ?SourceLink to the Wiki Page (For users)
Procurement TypeDefinition if the SKU will have a Production Plan or a Receipt Plan.DIP (Mandatory)SAP (MM03 - MRP2 view)









Network, prod & distribution data from SAP

SPK - Special Procurement KeyDefinition of the sourcing site for the receipt plan, will create automatically the network between 2 SKUs.DIP (Mandatory)SAP (MM03 - MRP2 view)
Rounding valueRounding valueDIP (Not mandatory)  SAP (MM03 - MRP1 view)
Bill of materials (BOMs)The BOMs will be used to calculate the dependant requirements and then the Production PlanBoth (Not mandatory)SAP (CS03)
Fixed Lot size

Multiple of production / distribution. If it is used, the production plan will be rounded to this value even if you need to produce less.

DIP (Not mandatory)SAP (MM03 - MRP1) but possibility to override in DIP
Minimum lot size

Minimum of production / Distribution. If it is used, the production / receipt plan will be rounded to this value.

DIP (Not mandatory)SAP (MM03 - MRP1 view)
Pallet SizeMultiple of DistributionDIP (Not mandatory)SAP (MM03 - MRP1 view)
Value StreamIt is used as a filter in DIP-PPDIP (Not mandatory)SAP (Table ZWFAT186)
Lead time in daysLead time is calculated based on history and is an information to be taken into account when planning.DIP (Not mandatory)Calculated in BW from SAP data
Total Replenishment Lead time (RLT)Total time required to procure or manufacture a product. DIP (Not mandatory)SAP (MM03 - MRP3 view)
Frozen period production

Time lapse during which the production planning for a material will not change regardless of events or changes that can occur (e.g. new order)

Frozen period production is set in SAP and retrieved into Dynasys DIP.

DIP (Not mandatory)SAP (MM03 - MRP1 view)
Unit standard costUnit standard cost for a material.DIP (Not mandatory)SAP (MM03 - Costing 2 view)
Maximum Stock levelWill determine the maximum stock level that you can have in order to not exceed this level for the safety stock calculationDIP (Not mandatory)SAP but possibility to override in DIP


Stocks from SAP

Planning Strategy

Definition if the SKU is MTO, MTF or MTSDIP (Not mandatory)SAP (WP1 only)
Safety stock from SAPOnly for displayDIP (Not mandatory)SAP (MM03 - MRP2 view)
Final Forecast ETD

The final forecast is coming from DP and will be used for the calculation of Independant requirements with the netting.

Final Forecast matches the Demand Review validated in DP.

Both (Mandatory)



Dynasys DP



Data from Dynasys DP

Unconstraint demand from DPFinal forecast validated in DP with ETA point of view. Both (Mandatory)
Budget demandBudgeted demand is done in DP. It is used for reports.Both (Not mandatory)

> Stocks

These stocks are mainly used as display.

DataDescriptionRelevant for DIP or PP ?SourceLink to the Wiki Page (For users)
Blocked stockBlocked stocks that can’t be used (e.g. rejected product)DIP (Used for display)




SAP (MMBE)




Stock from SAP





Actual inventory

Actual inventory at the current dateDIP (Used for display)
QM (quality management) batch Stock awaiting for quality checkDIP (Used for display)
Customer inventoryStocks belonging to the customer at the shiptoDIP (Used for display)
Vendor inventoryProducts from a subcontractorDIP (Used for display)
Restricted inventoryStock kept on purpose (e.g. for a specific customer)DIP (Used for display)
Initial inventoryAvailable inventory at the beginning of the monthDIP (Integrated in the planning) 

> Planning elements

DataDescriptionRelevant for DIP or PP ?SourceLink to the Wiki Page (For users)
BackorderOrderbooks that are due for the pastBoth (Integrated in the planning)




SAP (MD04)




Planning elements from SAP

External Purchase Order

Purchase orders from SAPBoth (Integrated in the planning)
Firm Shipments in shippingShipments to a customer, a warehouse or a production plant in shipping date.Both (Integrated in the planning)
Intransit inventory in reicept dateShipments in transit to a plant in receipt date.Both (Integrated in the planning)
Process ordersProcess orders from SAPBoth (Integrated in the planning)
Sales orderbook in ETAOrderbooks from SAPBoth (Integrated in the planning)

> Actuals

DataDescriptionRelevant for DIP or PP ?SourceLink to the Wiki Page (For users)
Actual consumptionConsumption for a product with the use of BOMsPP (Used for display)




SAP (MB51)





Actuals from SAP





Actual productionActual production at the current datePP (Used for display)
Actual receipt (from PO)Actual receipt from SAPPP (Used for display)
Actual receipt (from PO) with source siteActual receipt from SAP with source sitePP (Used for display)
Receipt value from POReceipt value from SAPPP (Used for display)
Actual shipped at GI dateActual shipped at good issue date (shipping date)PP (Used for display)
Invoiced quantityQuantity of product that has been invoiced to the customerPP (Used for display)SAP (VL03N)

The best way to get IT support is to use the new Service One Platform.