Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

This article explains how to create a control chart: a line chart showing the evolution of a measure with some reference lines representing the average of the sample, an upper line for the upper control limit, and a lower line for the lower control limit. The limits correspond to +/- 3 standard deviations.

In our example, the measure is the peak_duration which will be plotted against the batch id.

Let's create a dashboard based on our worksheet, drag a chart item into the page designer and click on the pencil icon which appears when hovering over it.


You can read the official documentation for more inforation (link)


The best way to get IT support is to use the new Service One Platform.