| Scrum Team name/ SM name | Jira BOARD (link) Where are sprints documented? | Team's composition (link) Who is part of my team? | Sprint validation | Sprint backlog
| Scrum mastering
| Scrum ceremonies
| Product backlog
|
|
|---|
| Data Squad JIRA board | Data Squad | - The length is (2 weeks)
- Has consistent durations. (starts - ends on Wednesday for one team and Thursday for the other)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (tracked in Jira and Confluence)
| - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- 30min-1h
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum daily- The duration is 15 minutes.
- It is held every day.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 30 min
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- 45 min - 1h
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
| DataLab Squad JIRA board | DataLab Squad | - The length is (2 weeks)
- Has consistent durations. (starts - ends on Wednesday for one team and Thursday for the other)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (tracked in Jira and Confluence)
| - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- 30 min
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum daily- The duration is 15 minutes.
- It is held every day.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 30 min
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- 45 min - 1h
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
| Labware LIMS Squad JIRA Board | Labware LIMS Squad | | - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- Duration here
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum daily- The duration is 15 minutes.
- It is held every day.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- Duration here
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- Duration here
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
Scrum Master: ABELIAN-ext, Sevak Squad name: SolvExtract | SolvExtract board | | - The length is (2 weeks)
- Has consistent durations. (starts - ends on Monday)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (N/A)
| - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- 60min.
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum daily- The duration is 15 minutes.
- It is held every day.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 60-90min.
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- 45-60min.
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
Scrum Master: ABELIAN-ext, Sevak Squad name: SmartFloat
| SmartFloat board | | - The length is (2 weeks)
- Has consistent durations. (starts - ends on Tuesday)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (N/A)
| - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- 60min.
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum bi-weekly- The duration is 15 minutes.
- It is held twice per week
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 60min.
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- 60min.
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
Scrum Master: ABELIAN-ext, Sevak Squad name: Data Usage
| Data Usage board | | - The length is (2 weeks)
- Has consistent durations. (starts - ends on Monday)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (N/A)
| - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- 30min.
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum bi-weekly- The duration is 15 minutes.
- It is held twice per week.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 60-90min.
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- 45-60min.
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
Scrum Master: ABELIAN-ext, Sevak Squad name: Data Transformation
| Data Transformation board | | - The length is (2 weeks)
- Has consistent durations. (starts - ends on Monday)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (N/A)
| - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- 30min.
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum bi-weekly- The duration is 15 minutes.
- It is held twice per week.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 60-90min.
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- 45-60min.
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
Scrum Master: ABELIAN-ext, Sevak Squad name: System
| System board | | | - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- N/A - Kanban
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum bi-weekly- The duration is 15 minutes.
- It is held twice per week.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 60-90min.
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- N/A
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
| Pricing Data Lake | | - The length is (2 weeks)
- Has consistent durations. (starts - ends on which days of the week)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (Jira)
| - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- 1 hour
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum daily- The duration is 15 minutes.
- It is held every day.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 1 hour
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- 1h30
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
| PCF Jira Board | PCF Team Composition | - The length is 3 weeks
- Has consistent durations. (starts on mondays - ends on fridays)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (in Jira Sprint goals)
| - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- 1 hour
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum daily- The duration is 15 minutes.
- It is held every day.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 1 hour
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- 1h30
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
| BENETT-ext, Lou-Ann |
|
| - The length is (2 weeks)
- Has consistent weeks durations. (starts on Monday- ends on Friday)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (tracked in Jira)
|
|
| Sprint Planning - Duration 45 min
- Frequency - once every two weeks
- PO sets the Sprint goals
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team
- Development team does estimation for the stories for the sprint
- Scrum Master prepares the presentation for Demo, retro, Planning and reports
- Scrum Master reviews the backlog with PO and sprint goals before Sprint Planning
- Scrum Master ensures that the capacity is at 80% to provide bandwith for the sprint
- Scrum Master is facilitating the meeting and ensures that timebox is respected
Scrum Dailys - Duration 15 min
- Frequency - everyday, except the days of Demo, retro and Planning
- Scrum Master is making team is attending
- Scrum Master facilitates the meeting and helps the team gets focus on the topics at hand
- Development team talks about the work from the day before, the day of and the day after
- Development team expresses any blockers they may have encountered
- Scrum team is ensuring that there is transparency on the blockers
- Scrum Master ensures timebox is respected
Backlog Refinement - Duration - 45 min
- Frequency - once a week
- POs review the stories from the backlog based on complexity with Development team for future Sprints
- Scrum Masters ensure that the meeting stays on topic and timebox is respected
- Based on the Stories, BAs and Devs provide high estimation to be reviewed during Sprint Planning
- Scrum Team ensures that stories are under Qualified status before the sprint starts
Sprint Demo / Review - Duration 45 min
- Frequency - Once every 2 weeks
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
-
Sprint Retrospective - Duration 45 min
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
- Scrum Master ensures that the environement is safe for the team to express their feedbacks and concerns
- Scrum Master ensures that there is transparency and timebox is respected
- Scrum Master ensures that previous actions agreed on from previous goals have been implemented
|
|
|
|
|
| - The length is (2 weeks)
- Has consistent durations. (starts on Wednesday - ends on Tuesday)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (tracked in Jira)
|
|
|
|
|
|
|
|
| - The length is (2 weeks)
- Has consistent durations. (starts on Monday - ends on Friday)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (tracked in Jira)
|
|
|
|
|
|