| Scrum Team name/ SM name | Jira BOARD (link) Where are sprints documented? | Team's composition (link) Who is part of my team? | Sprint validation | Sprint backlog
| Scrum mastering
| Scrum ceremonies
| Product backlog
|
|
|---|
| Data Squad JIRA board | Data Squad | - The length is (2 weeks)
- Has consistent durations. (starts - ends on Wednesday for one team and Thursday for the other)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (tracked in Jira and Confluence)
| - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- 30min-1h
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum daily- The duration is 15 minutes.
- It is held every day.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 30 min
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- 45 min - 1h
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
| DataLab Squad JIRA board | DataLab Squad | - The length is (2 weeks)
- Has consistent durations. (starts - ends on Wednesday for one team and Thursday for the other)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (tracked in Jira and Confluence)
| - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- 30 min
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum daily- The duration is 15 minutes.
- It is held every day.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 30 min
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- 45 min - 1h
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
| Labware LIMS Squad JIRA Board | Labware LIMS Squad | | - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- Duration here
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum daily- The duration is 15 minutes.
- It is held every day.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- Duration here
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- Duration here
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
Scrum Master: ABELIAN-ext, Sevak Squad name: SolvExtract | SolvExtract board | | - The length is (2 weeks)
- Has consistent durations. (starts - ends on Monday)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (N/A)
| - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- 60min.
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum daily- The duration is 15 minutes.
- It is held every day.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 60-90min.
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- 45-60min.
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
Scrum Master: ABELIAN-ext, Sevak Squad name: SmartFloat
| SmartFloat board | | - The length is (2 weeks)
- Has consistent durations. (starts - ends on Tuesday)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (N/A)
| - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- 60min.
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum bi-weekly- The duration is 15 minutes.
- It is held twice per week
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 60min.
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- 60min.
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
Scrum Master: ABELIAN-ext, Sevak Squad name: Data Usage
| Data Usage board | | - The length is (2 weeks)
- Has consistent durations. (starts - ends on Monday)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (N/A)
| - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- 30min.
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum bi-weekly- The duration is 15 minutes.
- It is held twice per week.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 60-90min.
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- 45-60min.
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
Scrum Master: ABELIAN-ext, Sevak Squad name: Data Transformation
| Data Transformation board | | - The length is (2 weeks)
- Has consistent durations. (starts - ends on Monday)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (N/A)
| - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- 30min.
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum bi-weekly- The duration is 15 minutes.
- It is held twice per week.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 60-90min.
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- 45-60min.
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
Scrum Master: ABELIAN-ext, Sevak Squad name: System
| System board | | | - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- N/A - Kanban
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum bi-weekly- The duration is 15 minutes.
- It is held twice per week.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 60-90min.
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- N/A
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
| Pricing Data Lake | | - The length is (2 weeks)
- Has consistent durations. (starts - ends on which days of the week)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (Jira)
| - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- 1 hour
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum daily- The duration is 15 minutes.
- It is held every day.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 1 hour
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- 1h30
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
| PCF Jira Board | PCF Team Composition | - The length is 3 weeks
- Has consistent durations. (starts on mondays - ends on fridays)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (in Jira Sprint goals)
| - Makes visible all the work to meet the sprint goal.
- Must have at least one improvement plan identified in previous sprint retrospective.
- Only the development team manages the sprint backlog.
- It must represent a live picture of the work done and remaining.
- All items must meet the definition of done before are considered finished
| - Promotes and supports the scrum process.
- Helps everybody to understand the Scrum theory, practices, rules and values.
Helps product owner to: - Ensure that goals, scope and domain are understood by everyone.
- Find techniques to maintain product backlog effectively.
- Facilitate scrum events as requested or needed.
Helps development team to: - Remove progress blockers.
- Facilitates scrum events as requested or needed.
Helps the organization to: - Lead and coach in scrum adoption.
- Work with other scrum masters to increase scrum effectiveness.
| Sprint Planning- 1 hour
- The Product Owner must set a sprint goal.
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team..
Scrum daily- The duration is 15 minutes.
- It is held every day.
- Detailed discussions, adaptations, replannings are outside this meeting.
- The scrum master ensures that the meeting takes place.
- The development team conducts the meeting.
Sprint review- 1 hour
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
Sprint retrospective- 1h30
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
| - The product owner is responsible for its content, availability and ordering.
- Product backlog refinement takes place iteratively.
- The items on top (higher priority) must be clear and meet the definition of ready
|
|
Squad Names - Lead & Sample
- Tech Excellence Squad
- CRM Services
| CRM Services Jira Board
TechEx Jira Board
Lead & Sample Jira Board |

Maintenance
Tech Excellence Squad 
CRM Services

| - The length is (2 weeks)
- Has consistent weeks duration. (starts on Monday- ends on Friday)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (tracked in Jira)
|
|
| Sprint Planning - Duration 45 min
- Frequency - once every two weeks
- PO sets the Sprint goals
- The number of Product Backlog items selected for the sprint backlog, solely depends on the development team
- Development team does estimation for the stories for the sprint
- Scrum Master prepares the presentation for Demo, retro, Planning and reports
- Scrum Master reviews the backlog with PO and sprint goals before Sprint Planning
- Scrum Master ensures that the capacity is at 80% to provide bandwith for the sprint
- Scrum Master is facilitating the meeting and ensures that timebox is respected
Scrum Dailys - Duration 15 min
- Frequency - everyday, except the days of Demo, retro and Planning
- Scrum Master is making team is attending
- Scrum Master facilitates the meeting and helps the team gets focus on the topics at hand
- Development team talks about the work from the day before, the day of and the day after
- Development team expresses any blockers they may have encountered
- Scrum team is ensuring that there is transparency on the blockers
- Scrum Master ensures timebox is respected
Backlog Refinement - Duration - 45 min
- Frequency - once a week
- POs review the stories from the backlog based on complexity with Development team for future Sprints
- Scrum Masters ensure that the meeting stays on topic and timebox is respected
- Based on the Stories, BAs and Devs provide high estimation to be reviewed during Sprint Planning
- Scrum Team ensures that stories are under Qualified status before the sprint starts
Sprint Demo / Review - Duration 45 min
- Frequency - Once every 2 weeks
- The product owner reviews what has been "Done" and what has not been "Done".
- The product backlog is reviewed.
-
Sprint Retrospective - Duration 45 min
- It takes place after the sprint review and before the sprint planning.
- The meeting is positive and productive.
- Create a plan to improve how the scrum team works.
- Scrum Master ensures that the environement is safe for the team to express their feedbacks and concerns
- Scrum Master ensures that there is transparency and timebox is respected
- Scrum Master ensures that previous actions agreed on from previous goals have been implemented
|
|
|
Squad - MSP team Scrum Master - LYAKH-ext, Marina | MSP Jira board | MSP team mission is to provide customers with innovative and user friendly tools that will ease their digital journey and help company to save time and money while working together as a team and having fun in a process. Squad composition (invited in all Scrum events): - Product Owner - Aude Trepier
- Project manager - Jessica Ternier (data tasks related with PIM)
- Lead Analyst - Gonçalo Silva
- Developer - Andre Vieira
- Developer - Jose Fischer (split 50/50 with Lead&Sample team)
- Scrum Master - Marina Lyakh
Team participants on request: - Architect - Dina Mendes
- Tech Lead - Mohan Devarapu
- Security - Julien Gasqueton
- Release Manager - Valeria Khrebtova
| - The length is (2 weeks)
- Has consistent durations. (starts on Monday - ends on Friday)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (WIP)
|
|
|
|
|
|
|
|
| - The length is (2 weeks)
- Has consistent durations. (starts on Monday - ends on Friday)
- New sprints start immediately after the previous concludes is (true)
- A sprint goal is always set and is (tracked in Jira)
|
|
|
|
|
|