This KDD document identifies the main material inspection processes that will be in scope of the QM stream of ERP Rebuld project.

These are the processes currently running in Syensqo WP1 and PF1 systems, as identified in the AS-IS analysis:

  • Inspection at Purchasing Goods Receipt (01)
  • In Process Production Inspection (03)
  • Inspection at Production Goods Receipt (04)
  • Inspection at Other Goods Receipt (05)
  • Inspection at Customer Returns (06)
  • Inspection at Stock Transfer (08)
  • Recurring Inspection (09)
  • Outbound Inspection (10-11-12)
  • Manual non-stock-based inspection (89)

All these inspection types are used in combination with inspection plans.

We identify the opportunities to introduce:

  • Inspection for Asset maintenance and calibration (14)
  • Sample Inspection (15)
  • Usage of Material Specification instead of / in combination with Inspection Plans


Recommendation

Option A is the recommended one: introduce in scope of the project inspection types 14 and 15 and allow the usage of Material Specification.


Background & Context

The two systems PF1 and WP1 have a very similar QM model, based on custom inspection types which are copies of the original standard types. 

Material inspection is largely used in SAP ECC, in some cases in combination with Labware and WEBLIMS, in other cases with a full E2E process in SAP.

The QM Material Inspection is a crucial part of the traceability and Quality Assurance process in Syensqo and involves all steps of the process: Inbound, Production, Outbound, Stock Management.



Assumptions

  • the new ERP system will be S4 HANA version 2023 or higher
  • one single instance will exist, instead of the current WP1, PF1 and WPX
  • current Labware and WEBLIMS systems remain
  • the QMS project with EQT will go on only for Composite GBU, while Specialty Polymers and the other GBUs will investigate the corresponding SAP functionalities in the Detailed Design phase


Constraints

  • We must guarantee the ability of each GBU and each single plant to maintain their own inspection plans where required

Impacts

  • it is a basic requirement to introduce Inspection type 14 (calibration) to integrate properly SAP S/4HANA Asset Management for Resource Scheduling


Business Rules

A decision tree will be designed in Detail Design to identify the inspection types to be activated for each material.

A decision tree will be designed in Detail Design to define whether a material specifiation or an insection plan should be created to host the tests required for a new material.

Options considered

Option A: Add Inspection Types 14 and 15 to the scope and allow material specification


Option B: Keep only currently used Inspection Types and do not allow Material Specification

This option is a replica of the current AS-IS solution. It would not be possible to create Inspection Lots for Samples and for Tool Calibration. It would be mandatory to use Inspection Plan for each material/plant to inspect.


Evaluation



Option A

Option B
Criterion 1

(plus)Pro

(minus)Con

(plus)Pro

(plus)Pro

Criterion 2

(plus)Pro

(minus)Con

(minus)Con
Criterion 3(plus)Pro(minus)Con

See also


No files shared here yet.

Change log

Version Published Changed By Comment
CURRENT (v. 5) Sept 17, 2024 17:03 NICASTRI-ext, Michele
v. 25 Sept 06, 2024 17:05 NICASTRI-ext, Michele
v. 24 Sept 06, 2024 17:02 NICASTRI-ext, Michele
v. 23 Sept 05, 2024 15:58 NICASTRI-ext, Michele
v. 22 Sept 05, 2024 13:56 NICASTRI-ext, Michele
v. 21 Sept 05, 2024 11:41 NICASTRI-ext, Michele
v. 20 Aug 14, 2024 12:38 WENNINGER-ext, Sascha
v. 19 Aug 09, 2024 08:04 WENNINGER-ext, Sascha
v. 18 Aug 08, 2024 13:15 NICASTRI-ext, Michele
v. 17 Aug 08, 2024 13:11 NICASTRI-ext, Michele
v. 16 Aug 08, 2024 13:10 NICASTRI-ext, Michele
v. 15 Aug 08, 2024 12:01 NICASTRI-ext, Michele
v. 14 Aug 08, 2024 12:00 NICASTRI-ext, Michele
v. 13 Aug 08, 2024 11:58 NICASTRI-ext, Michele
v. 12 Aug 08, 2024 11:57 NICASTRI-ext, Michele
v. 11 Aug 08, 2024 10:37 NICASTRI-ext, Michele
v. 10 Aug 08, 2024 10:34 NICASTRI-ext, Michele
v. 9 Aug 06, 2024 18:50 NICASTRI-ext, Michele
v. 8 Aug 06, 2024 18:48 NICASTRI-ext, Michele
v. 7 Aug 06, 2024 18:47 NICASTRI-ext, Michele
v. 6 Aug 06, 2024 18:07 NICASTRI-ext, Michele
v. 5 Aug 06, 2024 13:05 NICASTRI-ext, Michele
v. 4 Aug 06, 2024 11:46 NICASTRI-ext, Michele
v. 3 Aug 05, 2024 20:41 NICASTRI-ext, Michele
v. 2 Aug 05, 2024 15:00 NICASTRI-ext, Michele
v. 1 Jul 19, 2024 10:05 NICASTRI-ext, Michele

Workflow history

Title Last Updated By Updated Status  
There are no pages at the moment.

  • No labels