You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

Tolling sites are not meant to be managed in the PP module of DynaSys.  

Instead we search to calculate a non constrained plan. Uniquely in DIP with a DRP calculation. 

When a site becomes a tolling site, materials with Procurement Type = F and SPK code = 30 (subcontracting), are considered as produced SKUs.

In this case DynaSys calculates a Production Plan. Which means that it is not possible to force any Production Plan.

In order to force a Production Plan, DynaSys needs to calculate a Receipt Plan. 

For that, the following modifications must be done. 


1- Change the Main shipping site to “SUPPLIER”



2- Cancel production in the data field "Cancel Production" for all the concerned materials : 


Now there is a calculation for a Receipt Plan instead of a Production Plan (except current month frozen). 

A Receipt Requirement can be forced in the tab "Inbound Flows". 




  • No labels