- Demands for access to everything? wiki, sap, bw query, QV(?), Jira
- General info (GBUs etc)
- Interface
- User creation
- SKU management
- Different roles
- Import/Export
- Distribution
- Production Planning
- Exercises
→ Put the tickets we are treating for now and classify concerning the difficulty
1/ Bonjour La projection de stock s'arrête à Avril 22. Pourquoi ? Ghyslaine
2/ Is it possible to add ressources AHL2MEL on Melle plant (7666) ? It is used for the attached materials which appeared in the list of SKU without MDC.
3/ I will take over a part of Felix Lessard mission. Therefore, you can give the same rights as in his profile.; User ID : YOKO3589
Felix will keep Ospiate, New comer will take the Moerdjik plant.
4/
Ticket :
J'ai un niveau de "dependant requirement" trop élevé par rapport aux forecasts ou au besoins interco.
Pouvez vous m'aider à l'expliquer ?
Response:
Dans la vue “Where-used list by component” qu’on trouve dans l’onglet “3-DRP result”, on trouve la BOM de notre SKU “Rhodiastab 92 Bulk ZFR3 Melle”. ( vue du bas)
Ce SKU rentre dans la fabrication de “Rhodiastab 92/200 KG POLYETHYLEN DRUM” avec un coefficient de 1, donc notre Dependant requirement pour le bulk sera notre besoin en production du DRUM (“Proposed production plan”).
Maintenant on va aller voir le détail du plan de production pour comprendre d'où viennent les 57 200. Pour ce faire , on va sous l’onglet “5-Constrained Prod plan” on trouvera la vue “Novecare - Detailed Production Plan”. On va prendre le “parent product” “Rhodiastab 92/200 KG POLYETHYLEN DRUM”
Partant du mois de mai, on a 5200 en Available inventory qui est le résultat de l’available inventory du mois d’avril 6600 moins l’independent requirement de 1400. Pour le mois de juin le besoin est de 20 000 donc notre available inventory sera égal à 5200-20000 donc on aura un besoin qui se génère de 20000-5200=14 800. Le stock de sécurité pour le mois de juin est de 17 732 donc le besoin s’élève à 14800+17732=32 532 Kg. Donc, l’outil va nous proposer un “Production plan”. La quantité proposée est de 57200 et non pas de 32532 parce qu’on a une contrainte de lot présentée par la ligne “Production batch size [Kg]” qui est égal à 28600 donc on peut produire qu’un multiple de ce chiffre.
5/
Ticket :
I have a question about what is loaded into MRP?
Example: Material 143899 at 0294
July Forecast shows 25,397 and we have two orders from Rohm & Haas, so I would think the forecast should be 25,397 + 32,000 KG = 57,397 (assuming the forecast is consumed by orders in MRP)
This is the forecast I see in MRP
DIP Netting = 53,897...they are close, but I wonder why they are different. And, if I would see more extreme differences in other products.
Also, I see the 32MT open orders in the netting screen, but can I assume the netting takes place in MRP?
Response:
The forecast is sent to SAP after the S&OP validation at around 10 of the month. After that we’re not in the frozen period and the data is moving which explains the difference between what we have today in DIP Netting and SAP.
If we check what was sent to SAP after the last validation, we find in U01-Novecare Z800- S&OP reference datas-> independent requirement :
The sum of the independent requirements in July is 57397, which is the same value that we find in SAP by clicking in “element details” of ind req at 29.07.2022
In the view below, we find the independent requirement equal to 25397 because we have received two customer orders with the total of 32000 so that was deduced from the 57395 that we had before.
6/
Ticket :
a. Pourquoi fin février le stock résiduel est de 2560? je trouve (9600-5760=) 3840
b. Pourquoi en Avril on n'a pas la ligne 'initial inventory' puisqu'il y a manifestement du stock résiduel?
Response:
7/
Ticket :
This morning I have re-activated SKU 203785 @ BWF in the DiP Master Data workspace.
The SKU is visible in the DiP Demand Netting, however, not yet in the DRP Results. I have also run the "DRP run".
- How long does it take (availalbe after which refresh / reload) after re-activation that an SKU is visible in the DRP Results?
- Alternativatily, is there an issue with the SKU?
Response:
The SKU will be visible tomorrow in the DRP result afterthe update of the Hierarchy following the Static import run.
8/
Ticket :
Could you please check on short notice why SKU 321406 @ GAR is not available in DiP.
It is not visible in SKU Management and also not in SOP Planning. I need the SKU for planning.
The SAP material creation had been completed at the beginning of April.
Response:
9/
Ticket :
I see an issue in DIP for 2 SKUs on Mereville scope on 2 products : Peridiam Extra 311 1000L IBC and Peridiam Quality 009 1000L IBC. Attached the email sent to Duygu Karaca for help.
1/ EXTRA 311 :
PERIDIAM EXTRA 311 1000L IBC ZFR3 Mereville | 319496R@8913R : the issue is that in DIP orderbook is reported but not the sales forecast. So the forecast = 0 whereas it shouldn't be 0. --> Is something wrongly parametrized in DIP ? Moreover I can see this SKU in "Outbound flows". but I cannot see it in the netting part (see below : customer Santo Andre does not appear)
2/Quality 009 : (same issues as Extra 311)
PERIDIAM QUALITY 009 1000L IBC ZFR3 Mereville | 319518R@8913R : the issue is that in DIP orderbook is reported but not the sales forecast. So the forecast = 0 whereas it shouldn't be 0. --> Is something wrongly parametrized in DIP ? Moreover I can see this SKU in "Outbound flows"
but I cannot see it in the netting part (see below : customers Toll Contract Arndell, Laverton and Lytton do not appear) :
I already did a ticket for that so I am a little bit desperate ! Thanks in advance for your help !
Response:
Concerning the material 319496, the DFU’s main shipping site is Santo Andre.The DFU is Defined in DP . The Mereville site is sourced by Santo Andre, so that is why The forecast is at the level of this site and not at the level of the Mereville site. That explains why you don’t see the forecast in the DIP Netting.The forecast is only for the SKU shipto and not for the shipping site.
So, if we see at the Santo Andre level we have forecast for those shipto:
The result of the DRP shows that we have an independent requirement, but we don’t have the receipt plan because we have enough stocks to cover the demand and that is why at the level of Mereville Site we don’t have the shipping plan at the “Outbound flows” view.
It’s the same thing about the material 319518. Let us take the example of “Toll Contract Arndell Site”. The DRP result is as follow
So in this example, we have a proposed receipt plan because we don’t have enough stocks to cover the demand so if we see at the Merville site level which is sourced by Toll Contract Arndell we can see that we have a shipping plan as you found it in “Outbound Flows” View. It’s in Month of May because we have a lead time of two months.