General Description |
|---|
Number of days to transform a PReq (Purchasing Requisition) into a PO (Purchasing Order)Lead time details results can be analyzed by:
Date Reference: PO Item Creation date |
KPI Name | Definition |
|
Lead time to transform a conform Preq into a PO |
# of days between conform PReq Release date vs PO Item Creation date:Variation in days between Preq and PO | |
Lead time to transform a non conform Preq into a PO | # of days between non confrom PReq Release date vs PO Item Creation date:Variation in days between Preq and PO | |
Lead time to transform a Preq into a PO | # of days between PReq Release date vs PO Item Creation date:Variation in days between Preq and PO | |
# PO Item with PReq | Number of PO Items with PReq (PReq number <>#)
| |
# Conform PReq | Numbers of PReq in accordance to the conformity (refers to all mandatory information are filled when creating a purchase request)
| |
# Non Conform PReq | Numbers of PReq out of accordance to the conformity (Nom conform)Nom conform refers to either one of these Purchasing Groups is not equal E02, E03 , FQE (missing of at least 1 mandatory information when creating a purchase request to create a PO). Below is the process of Non conform PREq. | |
% Nom Conform PReq | Nb of non-conform Preq | |
Leadtime by range of days | % of a conform/Non conform Preq transformed into a PO spread by range of days |
| Source Information: BW (WP1 & PF1) | |
|---|---|
Core Query: | BW_QRY_MV_PROVG_0004 |
QV Query: | QVSBS_BW_QRY_MV_PROVG_0001 (PREQ) |
BW Filters | PO Transaction = ME21, ME21N, ME22, ME22N, ME23, ME23N, ME52, ME52N, ME53, ME53N, ME59, ME59N, ZBBP, # |
Specific Dimensions | |
PO Item Created By | |
Capex Flag | For CAPEX (IM), the Project type assigned to the relevant WBS element is: II (Investments) type in WP1.For OPEX (NC), the Project type assigned to the relevant WBS element is OI (Internal Operations) type in WP1 |
PO Category | E-Catalogue : PO Need Origin = 1Ref. Material in Stock : Material <> # + Account assignment code = #Ref. Material non in Stock : Material <> # + Account assignment code <> #Services & Material non Ref. : Material = # |
PO Item Critical | Y/N
|
VIP Supplier | Y/N (Vendor Attribute = VIP Vendor => Y=VIP ; N=#) |
Internal Suppliers | Y/N (Vendor Attribute = Class => Y=G ; N=the rest) |
Purchasing Group | |
Purchasing Organization | |
Not able to find the solution? Contact SBS Support.
Page
viewed times