You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Status

  Update in progress

Owner
Stakeholders

Purpose

The purpose of this document is to define the conversion approach to create Measurement Document in S/4 HANA.


Conversion Scope

The scope of this document covers the approach for converting active Measurement Document from Legacy Source Systems into S/4HANA following the Master Data Design Standard.

The approach is to migrate the last Measurement Document for each active Measuring Point which is driving the active Maintenance Plans and Items in order to start the Maintenance Plan in S/4 HANA with the objective to continue with the cycle.

The data from legacy system includes:

  1. Relevant measuring point that is a counter will have its latest measurement document without reversal indicator migrated to S/4HANA for business continuity to capture new measuring readings based on its last reading, facilitating the trigger of maintenance plan.
  2. If the Measuring Point is assigned to an ACTIVE Maintenance Plan, it must have valid and relevant Measurement Document to be migrated
  3. Historical Data for associated active Measuring Points for active Functional Locations and Equipment for the past 3 years, limited to specific Technical Object Type (list to be confirmed).

The data from legacy system excludes:

  1. Measuring Document with reversal indicator


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2, WP2Last Reading of Measurement Documents will be extracted from PF1 and WP16000

S/4HANA

6000
PF2, WP2Historical Measurement Documents will be extracted from PF1 and WP1nnnS/4HANAnnn










Additional Information

Multi-language Requirement

Measurement document does not have multi language support. Measurement document text will be migrated using EN logon.

Document Management

N/A

Legal Requirement

N/A

Special Requirements






Target Design

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement






















Data Cleansing

IDCriticalityError Message/Report DescriptionRuleOutputSource System


























Conversion Process

The high-level process is represented by the diagram below:


Data Privacy and Sensitivity


Extraction

Extract data from a source into . There are 2 possibilities:

  1. The data exists. connects to the source and loads the data into . There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible













Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set





















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.

DCT Rules

Field NameField DescriptionRule












Extraction Dependencies

Item #Step DescriptionTeam Responsible













Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible













Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic









































Transformation Mapping

Mapping Table NameMapping Table Description








Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible













Pre-Load Validation

Project Team

Completeness

TaskAction





Accuracy

TaskAction





Business

Completeness

TaskAction





Accuracy

TaskAction





Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible













Load Phase and Dependencies

Configuration

Item #Configuration Item






Conversion Objects

Object #Preceding Object Conversion Approach

list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram)




Error Handling

Error TypeError DescriptionAction Taken










Post-Load Validation

Project Team

Completeness

TaskAction





Accuracy

TaskAction





Business

Completeness

TaskAction





Accuracy

TaskAction





Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • is in scope based on data design and any exception requested by business.


See also

Change log

Version Published Changed By Comment
CURRENT (v. 2) Apr 23, 2026 07:06 PUN-ext, Eddy
v. 144 Apr 07, 2026 16:51 PUN-ext, Eddy
v. 143 Apr 06, 2026 10:45 PUN-ext, Eddy
v. 142 Mar 17, 2026 10:15 PUN-ext, Eddy CR0282-Update in Relevancy Criteria: 1. The logic used to identify APM-related Measurement Documents needs to be revised so that the relevancy assessment does not depend on S/4 data.
v. 141 Mar 17, 2026 10:12 PUN-ext, Eddy
v. 140 Mar 12, 2026 09:41 PUN-ext, Eddy
v. 139 Mar 12, 2026 09:40 PUN-ext, Eddy
v. 138 Mar 12, 2026 09:39 PUN-ext, Eddy
v. 137 Mar 12, 2026 09:34 PUN-ext, Eddy CR0282
v. 136 Dec 18, 2025 11:44 PUN-ext, Eddy

Go to Page History

Workflow history

Title Last Updated By Updated Status  
There are no pages at the moment.

  • No labels