You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Status

  Revision in Progress

OwnerLIU-ext, Ekawati 
Stakeholders

Purpose

The purpose of this document is to define the conversion approach to create Materials - Sales view with sales long text in S/4 HANA.


Conversion Scope

The scope of this document covers the approach for converting active Material Master Sales View including the sales long text from Legacy Source Systems into S/4 HANA following the Material Sales View Master Data Design Standard. 

From the current system landscape, Material Master data exists separately in the legacy systems (WP2 and PF2), with potential discrepancies in both organizations. Harmonization and validation are required to ensure accurate and consolidated data in S/4HANA. While WP2 and PF2 serve as source systems, extensive mapping and transformation logic will be necessary to produce properly formatted load templates in line with the target design.

 

The data from legacy system includes:

  1. Material without sales view block: X-distr.chain status OR DChain-spec. status are blank AND Material has sales transactions within the sales organizations in scope for the last 5 years, e.g. sales order, delivery or billing.
  2. Or Material without sales view block: X-distr.chain status OR DChain-spec. status are blank AND Material does not have sales transactions within the sales organizations in scope for the last 5 years, e.g. sales order, delivery or billing AND Material has stock within the sales organization in scope.


The data from legacy system excludes:

  1. Material with sales view block: X-distr.chain status OR DChain-spec. status are not blank


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

WP2

MVKE - SOrgn in scope - X-distr.chain status/ DChain-spec. status (BLANK or xxx/ check)

Check configuration for X-distr.chain status/ DChain-spec. status and see if we can use all or only some status codes as exclusion.


S/4 HANA


PF2



S/4 HANA












Additional Information

Multi-language Requirement

The material description may need to be printed in non-English. Hence, material masters - sales long text will also need to support the multi-language.  Below languages (International versions and keys) are supported:

Check WP2/ PF2 if all already covered

Check with Syniti team if use international version or language key

International Version

Description

C

Simplified Chinese

R

Cyrillic

K

Kanji (Japanese)

A

Arabic

3

Korean

T

Thai

H

Hangul


Language Key

Description

AR

Arabic

JA

Japanese

KO

Korean

RU

Russian

TH

Thai

ZF

Chinese trad.

ZH

Chinese

Document Management

Legal Requirement

Special Requirements




Target Design

Materials - Sales View with Sales Long Text Data strictly adheres to the Master Data Standard. The complete information of the key fields that hold the Materials - Sales View with Sales Long Text information follows the Master Data Standard document.

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement






















Data Cleansing

IDCriticalityError Message/Report DescriptionRuleOutputSource System

2003-001





PF2/ WP2

2003-002





PF2/ WP2

2003-003





PF2/ WP2


Set sales view block for material not eligible for migration

Check the usage of material sales view not in use for 5 years and without stock, but still active





Conversion Process

The high-level process is represented by the diagram below:

Data Privacy and Sensitivity


Extraction

Extract data from a source into . There are 2 possibilities:

  1. The data exists. connects to the source and loads the data into . There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible

Extraction Scope Definition

- Identify the source systems and databases involved.

- Define the data objects (tables, fields, records) to be extracted.

- Establish business rules for data selection.

Syniti

Extraction Methodology

- Specify the extraction approach (full, incremental, or delta extraction).

- Determine the tools and technologies used.

- Define data filtering criteria to exclude irrelevant records.

Syniti

Extraction Execution Plan

- Establish execution timelines and batch processing schedules.

- Assign responsibilities for extraction monitoring.

- Document dependencies on other migration tasks.

Syniti

Data Quality and Validation

- Define error handling mechanisms for extraction failures.

Syniti


Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set





















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.

Materials - Sales view with sales long text DCT Rules

Field NameField DescriptionRule












Extraction Dependencies

Item #Step DescriptionTeam Responsible
1

Source System Availability

  • Ensure that the source database or application is accessible.
  • Confirm that necessary credentials and permissions are granted

Syensqo IT

2

Data Structure

  • Identify relationships between tables, views, and stored procedures.

Syniti

3

Referential Integrity

  • Ensure dependent records are extracted together.

Syniti

4

Extraction Methodology

  • Define whether extraction is full, incremental, or delta-based.
  • Establish batch processing schedules for large datasets.

Syniti

5

Performance and Scalability Considerations

  • Optimize extraction queries to prevent system overload.
  • Ensure network bandwidth supports data transfer volumes.

Syniti

6

Security and Compliance

  • Adhere to regulatory standards for sensitive information if applicable

Syniti

7

Data cleansing of legacy Material Master - Sales View with sales long text data must be completed.

If standardization within the DCT begins using relevant data from PF2 and WP2 before the cleansing is finalized, it is understood that the business will take due diligence to ensure any subsequent delta cleansing is verified and aligned within the DCT.

Business


Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible













Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic









































Transformation Mapping

Mapping Table NameMapping Table Description








Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible













Pre-Load Validation

Project Team

Completeness

TaskAction





Accuracy

TaskAction





Business

Completeness

TaskAction





Accuracy

TaskAction





Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible













Load Phase and Dependencies

Configuration

Item #Configuration Item






Conversion Objects

Object #Preceding Object Conversion Approach

list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram)




Error Handling

Error TypeError DescriptionAction Taken










Post-Load Validation

Project Team

Completeness

TaskAction





Accuracy

TaskAction





Business

Completeness

TaskAction





Accuracy

TaskAction





Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • is in scope based on data design and any exception requested by business.


See also

Change log

Version Published Changed By Comment
CURRENT (v. 2) Apr 29, 2026 13:44 LIU-ext, Ekawati
v. 30 Apr 28, 2026 08:36 LIU-ext, Ekawati
v. 29 Apr 23, 2026 10:31 LIU-ext, Ekawati
v. 28 Apr 20, 2026 08:15 LIU-ext, Ekawati
v. 27 Feb 27, 2026 10:31 LIU-ext, Ekawati
v. 26 Feb 27, 2026 09:42 LIU-ext, Ekawati
v. 25 Jan 16, 2026 16:33 LIU-ext, Ekawati
v. 24 Jan 06, 2026 12:51 LIU-ext, Ekawati
v. 23 Dec 17, 2025 11:03 LIU-ext, Ekawati
v. 22 Dec 17, 2025 07:27 LIU-ext, Ekawati

Go to Page History

Workflow history

Title Last Updated By Updated Status  
There are no pages at the moment.

  • No labels