The purpose of this document is to define the conversion approach to create Work Order in S/4 HANA.

Legacy Plant Maintenance Work order is using a diverse range of formats across the different systems. There are instances where the same Work order is duplicated within and/or across sources, with informal words. This results in data inconsistency. As per SyWay design, EAM Maintenance Work order will be standardized.


Conversion Scope

The scope of this document covers the approach for converting active Work Order from Legacy Source Systems into S/4HANA following the Work Order Master Data Design Standard.


The data from legacy system includes:

  1. Open Work Orders - Outstanding; In Process (Historical for Selected Equipment Type)

The data from legacy system excludes:

  1. Open Work Order older than 1 month (based on Creation Date)

    Exception:

    Orders with Technically Completed (TECO) status that have external services assigned – to be manually reviewed by the Business

  2. Open Priority Work Orders older than 2 weeks (based on Creation Date)
  3. Work order with user status DUPL or CANC


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2, WP2

An initial extract will be provided to business to evaluate.

Additional data/records may be required and these will be constructed via DCT.

Enrichment of in-scope data may be required and will be added via transformation rules (business/technical).

131137

S/4HANA 

131137
















Additional Information

Multi-language Requirement

Notification and Work Order do not have multi language support. Work Order and Notification text will be migrated using EN logon.

Document Management

Long text and DIR are not covered in this document as they are defined as another data object.

Legal Requirement

Not Applicable

Special Requirements




Target Design

EAM Maintenance Work Order Data strictly adheres to the Master Data Standard. The complete information of the key fields that hold the Class information follows the Master Data Standard document that is located here <include hyperlink>

The technical design of the target for this conversion approach.

General Data (mandatory)

TableFieldData ElementField DescriptionData TypeLengthRequirement

ORDERID
Legacy Order NumberText80Mandatory

ORDER_TYPE
Order TypeText80Mandatory

SHORT_TEXT
DescriptionText40

LONG_TEXT
Long TextTextunrestricted

PRIORITY
PriorityText80

START_DATE
Required Start DateDate


BASICSTART
Required Start TimeTime


FINISH_DATE
Required End DateDate


BASIC_FIN
Required End TimeTime


LACD_DATE
Final Due DateDate


FUNCT_LOC
Technical Object (Functional Location)Text80

EQUIPMENT
Technical Object (Equipment)Text80

ASSEMBLY
AssemblyText80

SYSTCOND
System ConditionText80

NOTIF_NO
Assigned NotificationText80

PMACTTYPE
Maintenance Activity TypeText80

MN_WK_CTR
Work CenterText80Mandatory

PLANT
Work Center PlantText80

PLANPLANT
Planning PlantText80Mandatory

PLANGROUP
PlangroupText80

LOC_WK_CTR
Production Work CenterText80

MAINTPLANT
Maintenance PlantText80

LOCATION
LocationText80

MAINTROOM
RoomText8

PLSECTN
Plant SectionText80

LOC_COMP_CODE
Company CodeText80

LOC_WBS_ELEM
WBS Element (Acc Assignment)Text80

COSTCENTER
Cost CenterText80

RESPCCTR
Responsible Cost CenterText80

WBS_ELEM
Planning WBS ElementText80

OBJECTCLASS
Object ClassText80

PROFIT_CTR
Profit CenterText80

Phase Control

TableFieldData ElementField DescriptionData TypeLengthRequirement

ORDERID
Legacy Order NumberText80Mandatory

EAMBLOCKERCODE
Phase Control CodeText80Mandatory

CODEACTIVE
Set Automatically IndicatorText1

 Organizational Data - Partners

TableFieldData ElementField DescriptionData TypeLengthRequirement

ORDERID
Legacy Order NumberText80Mandatory

PARTN_ROLE
Partner FunctionText80Mandatory

PARTNER1
PartnerText80Mandatory

Operation Data (mandatory)

TableFieldData ElementField DescriptionData TypeLengthRequirement

ORDERID
Legacy Order NumberText80Mandatory

ACTIVITY
Operation/ActivityText4Mandatory

SUB_ACTIVITY
SuboperationText4

DESCRIPTION
Operation DescriptionText40

LONG_TEXT
Long TextTextunrestricted

WORK_CNTR
Work CenterText80Mandatory

PLANT
Work Center PlantText80Mandatory

PERS_NO
Person ResponsibleText80

CONTROL_KEY
Control KeyText80Mandatory

PRICE
PriceNumber13

CURRENCY
CurrencyText80

COST_ELEMENT
Cost ElementText80

PURCH_ORG
Purchasing OrganizationText80

PUR_GROUP
Purchasing GroupText80

MATL_GROUP
Material GroupText80

SYSTCOND
System ConditionText80

ACTTYPE
Activity TypeText80

WORK_ACTIVITY
WorkNumber7

UNIT
Work UnitText80

CALC_KEY
Calculation KeyText80

DURATION_NORMAL
DurationNumber5

UNIT1
Duration UnitText80

EQUIPMENT
Technical Object (Equipment)Text80

FUNCT_LOC
Technical Object (Functional Location)Text80

PERCENT_OF_WORK
Work Percentage - %Number3

ASSEMBLY_LONG
AssemblyText80

NUMBER_OF_CAPACITIES1
Required CapacitiesNumber3

EXECUTION_STAGE
Execution StageText80

MAINTENANCE_ACTIVITY_TYPE1
Maintenance Activity TypeText80

QUANTITY1
Operation QuantityNumber13

BASE_UOM1
UnitText80

PRICE_UNIT
Price UnitNumber5

VENDOR_NO
VendorText80

AGREEMENT
AgreementText80

AGMT_ITEM
ItemNumber5

GR_RCPT
RecipientText12

TRACKINGNO
Tracking NumberText10

SORT_FLD
Sort TermText10

INFO_REC
Purchasing Info RecordText80

PREQ_NAME
Name of RequisitionerText12

UNLOAD_PT
Unloading PointText25

PLND_DELRY
Planned Delivery Time - DayNumber3

AVON
Note (Text ID - AVON)Textunrestricted

AVOD
Remark (Text ID - AVOD)Textunrestricted

AVOC
Comment (Text ID - AVOC)Textunrestricted

 Operation Data - Phase Control

TableFieldData ElementField DescriptionData TypeLengthRequirement

ORDERID
Legacy Order NumberText80Mandatory



Operation/ActivityText4Mandatory



SuboperationText4



Phase Control CodeText80Mandatory



Set Automatically IndicatorText1

Operation Data - Materials

TableFieldData ElementField DescriptionData TypeLengthRequirement

ORDERID
Legacy Order NumberText80Mandatory

ACTIVITY
Operation NumberText4Mandatory

SUB_ACTIVITY
SuboperationText4

RES_ITEM
Item Number of ReservationNumber4Mandatory

MATERIAL
MaterialText80

MATL_DESC
DescriptionText40

LONG_TEXT
Long TextTextunrestricted

ITEM_CAT
Item CategoryText80

PRODUCT_TYPE
Product Type GroupText80

REQUIREMENT_QUANTITY
QuantityNumber13

REQUIREMENT_QUANTITY_UNIT
UnitText80

MRP_RELEVANT
Reservation/Purc. ReqText80

PLANT
PlantText80

REQ_DATE
Requirements DateDate


MANUAL_REQ_DATE
Manual Reqmt Date IndicatorText1

STGE_LOC
Storage LocationText80

BATCH
BatchText80

PRICE
PriceNumber15

PRICE_UNIT
Price UnitNumber5

CURRENCY
CurrencyText80

PURCH_ORG
Purchasing OrganizationText80

PUR_GROUP
Purchasing GroupText80

VENDOR_NO
SupplierText80

INFO_REC
Purchasing Info RecordText80

MATL_GROUP
Material GroupText80

GL_ACCOUNT
G/L AccountText80

GR_RCPT
Goods RecipientText12

UNLOAD_PT
Unloading PointText25

STARTDATE
Service Performance Start DateDate


PERFORMANCEPERIODSTARTTIME
Service Performance Start Time (UTC)Time


ENDDATE
Service Performance End DateDate


PERFORMANCEPERIODENDTIME
Service Performance End Time (UTC)Time


SERVICEDURATION
Duration of Lean ServiceNumber5

SERVICEDURATIONUNIT
Duration Unit for a Lean ServiceText80

EXPECTEDOVERALLLIMITAMOUNT
Expected ValueNumber13

OVERALLLIMITAMOUNT
Overall LimitNumber13

OPERATIONWORKCENTERALIGNMENT
Align with Work Center IndicatorText1

 Operation Data - Relationships

TableFieldData ElementField DescriptionData TypeLengthRequirement

ORDERID
Legacy Order NumberText80Mandatory

ACTIVITY
Legacy OperationText4Mandatory

ORDER_PREDECESSOR
Assigned OrderText80

OPERATION_PREDECESSOR
Assigned OperationText4Mandatory

NCHKZ
Successor IndicatorText1

RELATION_TYPE
Type of RelationshipText80Mandatory

DURATION_RELATION
Time IntervalNumber5

DURATION_RELATION_UNIT
UnitText80

PERCENT_OF_SUCCESSOR
Time Interval %Number3

DURATION_KEY
Time Interval KeyText80

FACTORY_CALENDAR
Factory CalendarText80

WORK_CNTR
Work CenterText80

PLANT
PlantText80

Operation Data - PRT

TableFieldData ElementField DescriptionData TypeLengthRequirement

ORDERID
Legacy Order NumberText80Mandatory

ACTIVITY
Operation NumberText4Mandatory

ITEM_NO_OF_PRODUCTION_RESOURCE
PRT Item NumberNumber4Mandatory

DESCRIPTION
PRT Item TextText40

PRT_CATEGORY
CategoryText80Mandatory

PRT_PLANT
PlantText80

MATERIAL_LONG
Number (Material)Text80

MISCELLANEOUS
Number (Miscellaneous)Text80

STD_VALUE_FOR_PRT_QTY
QuantityNumber9Mandatory

PRT_USAGE_QUANTITY_SUM_UNIT
Quantity UnitText80

CTRL_KEY
Control KeyText80Mandatory

Object List

TableFieldData ElementField DescriptionData TypeLengthRequirement

ORDERID
Legacy Order NumberText80Mandatory

COUNTER
CounterNumber10Mandatory

SORTFIELD
SortText20

FUNCT_LOC
Technical Object (Functional Location)Text80

EQUIPMENT
Technical Object (Equipment)Text80

SERMAT_LONG
MaterialText80

SERIALNO
Serial NumberText80

NOTIF_NO
NotificationText80

ASSEMBLY_LONG
AssemblyText80

ACTIVITY
Assignment to OperationsText4

SUB_ACTIVITY
Assignment to SuboperationsText4

 Costs

TableFieldData ElementField DescriptionData TypeLengthRequirement

ORDERID
Legacy Order NumberText80Mandatory

VALUE_CATEGORY
Cost CategoryText80Mandatory

COSTS_EST
Estimated CostsNumber15Mandatory

CURRENCY
CurrencyText80Mandatory

Costs - Settlement Rules

TableFieldData ElementField DescriptionData TypeLengthRequirement

ORDERID
Legacy Order NumberText80Mandatory

EXTNR
Distribution Rule NumberNumber3Mandatory

COMP_CODE
Company CodeText80

ACTIVITY
Operation/ActivityText4

COSTCENTER
Settlement Receiver (Cost Center)Text80

ORDERID2
Settlement Receiver (Order)Text80

WBS_ELEMENT
Settlement Receiver (WBS Element)Text80

ASSET_NO
Settlement Receiver (Asset)Text80

SETTL_TYPE
Settlement TypeText80Mandatory

PERCENTAGE
Settlement Percentage Rate - %Number5Mandatory

  

Data Cleansing

IDCriticalityError Message/Report DescriptionRuleOutputSource System

9005-001

C1 

Invalid or Inactive Equipment or Functional Location linked to Work Order 

Work Order as per Relevancy Criteria assigned with an Equipment / Functional which does not belong below:
1. Equipment as per Relevancy Criteria
2. Functional Location as per Relevancy Criteria 

The criteria for this report includes all Work Orders with system status not CRTD and not TECO 

Equipment, Functional Location 

PF1, WP1 

9005-002

C1

Invalid or Inactive Activity Type linked to Work Order 

Work Order as per Relevancy Criteria assigned with an Activity Type which does not belong below:
1. Activity Type (FI) as per Relevancy Criteria 

Activity Type 

PF1, WP1 

9005-003

C1

Invalid or Inactive Business Partner (Employee Personnel) linked to Work Order 

Work Order as per Relevancy Criteria assigned with a Business Partner (Employee Personnel) which does not belong below:
1. Business Partner (Employee Personnel) as per Relevancy Criteria 

Business Partner (Employee) 

PF1, WP1 

9005-004

C1 

Invalid or Inactive Cost Centre linked to Work Order 

Work Order as per Relevancy Criteria assigned with a Cost Centre which does not belong below:
1. Cost Centre (FI) as per Relevancy Criteria 

Cost Centre 

PF1, WP1 

9005-005

C1 

Invalid or Inactive Maintenance Item linked to Work Order 

Work Order as per Relevancy Criteria assigned with a Maintenance Plan and Item which does not belong below:
1. Maintenance Plan and Item as per Relevancy Criteria 

Maintenance Item 

PF1, WP1 

9005-006

C1 

Invalid or Inactive Material linked to Work Order 

Work Order as per Relevancy Criteria assigned with a Material which does not belong below:
1. Material Master (S2P) as per Relevancy Criteria 

Material 

PF1, WP1 

9005-007

C1 

Invalid or Inactive Notification linked to Work Order

Work Order as per Relevancy Criteria assigned with a Notification which does not belong below:
1. Notification as per Relevancy Criteria 

Notification 

PF1, WP1 

9005-008

C1 

Invalid or Inactive Production Resources & Tool linked to Work Order 

Work Order as per Relevancy Criteria assigned with a Production Resources & Tool which does not belong below:
1. Production Resources & Tool as per Relevancy Criteria 

Production Resources & Tool 

PF1, WP1 

9005-009

C1 

Invalid or Inactive Profit Centre linked to Work Order

Work Order as per Relevancy Criteria assigned with a Profit Centre which does not belong below:
1. Profit Centre (FI) as per Relevancy Criteria 

Profit Centre 

PF1, WP1 

9005-010

C1 

Invalid or Inactive Revision linked to Work Order 

Work Order as per Relevancy Criteria assigned with a Revision which does not belong below:
1. Revision as per Relevancy Criteria 

Revision 

PF1, WP1 

9005-011

C1 

Invalid or Inactive Standard Text linked to Work Order

Work Order as per Relevancy Criteria assigned with a Standard Text which does not belong below:
1. Standard Text as per Relevancy Criteria 

Standard Text 

PF1, WP1 

9005-012

C1 

Invalid or Inactive Task List linked to Work Order 

Work Order as per Relevancy Criteria assigned with a Task List which does not belong below:
1. Task List as per Relevancy Criteria 

Task List 

PF1, WP1 

9005-013

C1 

Invalid or Inactive WBS linked to Work Order 

Work Order as per Relevancy Criteria assigned with a WBS which does not belong below:
1. Work Breakdown Structure (PS) as per Relevancy Criteria 

Work Breakdown Structure 

PF1, WP1 

9005-014

C1 

Invalid or Inactive Work Centre linked to Work Order 

Work Order as per Relevancy Criteria assigned with a Work Centre which does not belong below:
1. Work Centre as per Relevancy Criteria 

Work Centre 

PF1, WP1 

9005-015

C1 

Invalid, Inactive or no Fixed Asset linked to Work Order 

Work Order as per Relevancy Criteria assigned with a Fixed Asset which does not belong below:
1. Fixed Asset (FI) as per Relevancy Criteria 

Fixed Asset 

PF1, WP1 

9005-016

C1 

Work Orders technically completed but with Open Commitments (POs not closed, Open reservations, Open PR) 

TBD 

Work Order, Status 

PF1, WP1 

9005-017

C2

Open Work Orders older than 12 months

Open Work Orders older than 12 months 

Creation Date, Status 

PF1, WP1 

9005-018

C2 

Open Priority Work Orders older than 3 months 

Open Work Orders older than 3 months with Priority as follows:
0: Call in
1: Urgent (<=1 day)
2: Urgent (<=3 days) 

Creation Date, Status, Priority 

PF1, WP1 

9005-019

C1 

Notification Storage Location incorrect. 

Notificationas per Relevancy Criteria with Invalid Storage Location (T001L) 

Storage Location 

PF1, WP1 

9005-020

C1 

Work Order UOM Missing / incorrect. 

Work Order as per Relevancy Criteria with no UoM Assigned or Invalid UoM (T006) 

Unit of Measure 

PF1, WP1 

9005-021

C1 

Work Order Purchasing Groups incorrect. 

Work Order as per Relevancy Criteria with Invalid Purchasing Group (T024) 

Purchasing Group 

PF1, WP1 

9005-022

C1 

Work Order Purchasing Organization incorrect. 

Work Order as per Relevancy Criteria with Invalid Purchasing Organization (T024E) 

Purchasing Organization 

PF1, WP1 

9005-023

C2

Work Order Planning Plant and Maintenance Plant are not the same. 

Work Order as per Relevancy Criteria with Planning Plant <> Maintenance Plant 

Maintenance Plant, Planning Plant 

PF1, WP1 


Informal Words **

Group 1

Group 2

Group 3

Group 4

Group 5

*DNU

Delete

donot

Formerly

Old #

..

Deletion

DONT USE

From

Old[ ]

/

DELISTED

DON'T USE

Incorrect

PLEASE USE

?

Discontinued

Dup Use

Invalid

Pls Use

@

Disposable

DUPLICATE

New

Previously

^

DNU

-DUPLICATE

NOT ACTIVE

Replace

+

Do Not

DUPLICATION

not in use

Replaced

++

Do Not Re

Duplicidad

Not Used

RESERVED

£

Do Not Sell

Duplikat

NOT VALID

Retired

Defective

Do Not Use

Former

Obsolete

ZZDEL

Conversion Process

The high-level process is represented by the diagram below:

For sites that are not on SAP-PF2 and WP2 systems, collection will be done manually in the data collection template.


Data Privacy and Sensitivity


Extraction

Extract data from a source into . There are 2 possibilities:

  1. The data exists. connects to the source and loads the data into . There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible
1Extract data from source system based on relevancy ruleSyWay Data Team
2Google Sheet report pre-populated with PF2 and WP2 information to be generated based on relevancy criteria. SyWay Data Team


Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set
Not Applicable




Data Collection Template (DCT)

Target Ready Data Collection Template will be created for Work Order data with exception of some fields which require transformation as mentioned in the transformation rule.

Work Order DCT Rules

Field NameField DescriptionRule












Extraction Dependencies

Item #Step DescriptionTeam Responsible

1

Ensure Syniti has the necessary connection and access to legacy servers 

Data

2

Ensure that the necessary cleansing activities in legacy sources are complete 

Data / Business 

3

Ensure that create, change and deletion of master data is freeze in legacy Production system 

Legacy IT 


Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible
1Obtain DCT Sign-off from BusinessSyWay A2D Data Team
2<Add steps from Syniti Migrate here>SyWay A2D Data Team
3Review and Validate Error and Preload ReportsSyWay A2D Data Team
4

Generate Load Files

SyWay A2D Data Team


Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic









































Transformation Mapping

Mapping Table NameMapping Table Description

IFLOT

Functional Locations

T003O

Order Type & Priority

TQ80

Notification Type

EQUI

Equipment

CRHD

Work Centres

CSKU

Cost Centre

Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible
1Ensure DCT tables completenessSyWay A2D Data Team
2Value Mappings are according to the latest design - <List of Value Mappings>SyWay A2D Data Team


Pre-Load Validation

Project Team

Completeness

TaskAction

Verify Record Count

SyWay A2D Data Team to verify that the total number of relevant records from legacy systems and DCTs (if any) is equal to the total number of records in the Preload and Load Sheets.

Verify Data Integrity

SyWay A2D Data Team to verify that the total number of Operations per Work Oder header extracted from legacy systems and DCTs (if any) should be equal to the total number of operations identified in the Preload and Load Sheets


Accuracy

TaskAction

Conversion Accuracy

SyWay A2D Data Team to verify that all fields below meet pass the checks:

  1. Mandatory Fields
  2. Field and Value Mapping Correctness
  3. Null Checks
  4. Text Length Checks

Review Error Reports

Review and correct the errors. Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data.


Business

Completeness

TaskAction

Verify Record Count

Business Data Owner/s to verify that the total number of relevant records from legacy systems and DCTs (if any) is equal to the total number of records in the Preload and Load Sheets.


Accuracy

TaskAction
Conversion AccuracyBusiness Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data).


Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible

1

Syniti will provide load file

Syniti











Load Phase and Dependencies

Configuration

Item #Configuration Item

1

Planner Groups

2

Planning Plants

3

Maintenance Plants

4

Order Type to Maintenance Plant

5

System Condition

6

Purchasing Group

7

Purchasing Organization

8

Number Ranges for Work Order

9

Material Group

Conversion Objects

Object #Preceding Object Conversion Approach

1003

Functional location

1002

Equipment


WBS Element (where applicable)

9003

Revision

2019

Material Master


Vendors


Cost Elements

Error Handling

Error TypeError DescriptionAction Taken










Post-Load Validation

Project Team

Completeness

TaskAction

Verify Count

SyWay A2D Data Team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA.

Verify Logs

Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.).


Accuracy

TaskAction

Conversion Accuracy

Verify that the Reference Functional Location data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA.


Business

Completeness

TaskAction

Verify Count

Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file.


Accuracy

TaskAction

Conversion Accuracy

Verify that the Reference Functional Location data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA.


Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • Data is in scope based on data design and any exception requested by business.
  • All data cleansing and preparation has been completed.
  • Only valid Legacy outstanding Work Orders that have been supplied by the CIT in the Identified List of Work Order will be converted
  • All Work Orders will be forward scheduled and outstanding (not TECO), as the cut off day for Work Orders will be seven days prior to the Legacy system close date, and be valid “work” (i.e. not used as a PO generation point for items such as travel, payment reminders, etc).


See also

Change log

Version Published Changed By Comment
CURRENT (v. 3) Apr 29, 2026 13:34 ERGUIZA-ext, Pinky Love
v. 357 Apr 29, 2026 10:38 ERGUIZA-ext, Pinky Love
v. 356 Apr 29, 2026 10:32 ERGUIZA-ext, Pinky Love
v. 355 Apr 29, 2026 10:29 ERGUIZA-ext, Pinky Love
v. 354 Apr 29, 2026 05:58 ERGUIZA-ext, Pinky Love
v. 353 Apr 27, 2026 08:22 ERGUIZA-ext, Pinky Love
v. 352 Apr 27, 2026 08:19 ERGUIZA-ext, Pinky Love
v. 351 Apr 27, 2026 08:19 ERGUIZA-ext, Pinky Love
v. 350 Apr 27, 2026 08:18 ERGUIZA-ext, Pinky Love
v. 349 Apr 27, 2026 08:16 ERGUIZA-ext, Pinky Love

Go to Page History

Workflow history

Title Last Updated By Updated Status  
There are no pages at the moment.

  • No labels