The purpose of this document is to define the conversion approach for Quota Arrangements to be uploaded into SAP S/4HANA as part of the Procurement Data Migration. Quota Arrangements are used to determine the distribution of procurement quantities across multiple sources of supply, providing control over vendor sourcing allocations.


---CHECKLIST---

  • Logical Source and Target Systems are identified. 
  • Processing Type is specified (i.e. Direct Input, BAPI, IDoc, Web Service, OData API, etc.)
  • Standard or custom load program name/BAPI/IDoc is specified to support this functionality.
  • Data Mapping is provided for mappings which are not obvious to a suitably-skilled and experienced developer
  • All translation requirements are clearly defined (including data validation rules, data derivation/calculation and default values, if applicable)Input and/or Output file layouts are provided for all record types possible
  • Transaction volume is specified Execution frequency is specified Restart/Recovery requirements have been defined
  • Error handling requirements are specified, including alerting requirement and expected action on failure. 
  • Application log requirement if applicable to be specified. 



--- Additional topics to check---

  • Update the Data Volume with a actual figures
  • Rules for Data Merging (all systems)
  • Mapping Rules & Conversion Rules




Conversion Scope

This conversion approach covers active and relevant Quota Arrangements maintained at the material, plant, and source (vendor or source list) level. Records from legacy ECC systems (e.g., PF2, WP2) will be extracted, validated, transformed, and loaded into the S/4HANA system.

Only quota entries linked to valid material and vendor combinations and with an active allocation percentage will be considered in scope. Obsolete, deleted, or inactive quota records will be excluded. The harmonization process will align multiple legacy records into a consistent target format.


The data from legacy system includes:

  1. - Materials that are in scope for conversion
  2. Vendors that are valid and active in the target system
  3. Quota Arrangements with non-zero quota % and valid plant/material/vendor combinations
  4. Entries with recent procurement activity (last 3–5 years)

The data from legacy system excludes:

  1. Entries marked for deletion (QMAT-LOEKZ)
  2. Obsolete vendors or materials not migrated
  3. Quotas with zero allocation or expired validity period


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records





















Additional Information

Multi-language Requirement

Document Management

Legal Requirement

Special Requirements




Target Design

Quota Arrangement will be loaded into SAP S/4HANA using standard structures:

  • Table: QMAT (Quota Arrangement by Material)
  • Fields: MATNR, WERKS, LIFNR, KNTTP, KZUST, ANZQU, DATBI, DATAB, etc.
  • The data must match the material master, vendor master, and source list configurations. 


The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement
EQUKMANDTMANDTClientCLNT3Chave
EQUKMATNRMATNRMaterial NumberCHAR18‑40*Chave
EQUKWERKSWERKS_DPlantCHAR4Chave
EQUKBDATUQUOBIQuota arrangement period valid untilDATS8Chave
EQUKVDATUQUOABQuota arrangement period valid fromDATS8Opcional
EQUKQUNUMQUNUMNumber of quota arrangementCHAR10Opcional
EQUKERDATERDATDate on which record was createdDATS8Opcional
EQUKERNAMERNAMName of person who created the objectCHAR12Opcional
EQUKSCMNGSCMNGMinimum quantity for splitting quotaQUAN15.3Opcional
EQUKCHANGEDONTIMESTAMPLUTC timestamp when record was changedDEC21Opcional

EQUPMANDTMANDTClientCLNT3Chave
EQUPQUNUMQUNUMNumber of quota arrangementCHAR10Chave
EQUPQUPOSQUPOSQuota arrangement item numberNUMC3Chave
EQUPBESKZQBESKProcurement typeCHAR1Opcional
EQUPSOBESSOBESSpecial procurement typeCHAR1Opcional
EQUPLIFNRELIFNVendor account numberCHAR10Opcional
EQUPBEWRKBEWRKPlant from which material is procuredCHAR4Opcional
EQUPQUOTEQUOTEQuotaDEC3Opcional
EQUPQUBMGQUBASBase quantity of quota arrangement itemQUAN15.3Opcional
EQUPQUMNGQUMNGAllocated quantity of quota arrangement itemQUAN15.3Opcional
EQUPMAXMGQUMAXMaximum quantity of quota arrangement itemQUAN15.3Opcional
EQUPVERIDVERIDProduction versionCHAR4Opcional
EQUPMAXLSMAXLSMaximum lot size per quota itemQUAN13.3Opcional
EQUPMINLSMINLSMinimum lot size per quota itemQUAN13.3Opcional
EQUPRDPRFRDPRFRounding profileCHAR4Opcional
EQUPKZEINKZEIMOnce‑only indicatorCHAR1Opcional
EQUPABRMGABRMGMaximum release quantity per periodQUAN13.3Opcional
EQUPABPERABPERPeriod related to release quantityCHAR1Opcional
EQUPABANZABANZNumber of periods for release quantityNUMC2Opcional
EQUPPREIHPREIHPriority for determination sequenceNUMC2Opcional
EQUPEMATNEMATNManufacturer part number's material numberCHAR18Opcional
EQUPPLIFZPLIFZPlanned delivery time in daysDEC3Opcional


Data Cleansing

IDCriticalityError Message/Report DescriptionRuleOutputSource System


























Conversion Process

The high-level process is represented by the diagram below:


image-2025-6-20_9-51-38.png

Data Privacy and Sensitivity


Extraction

Extract data from a source into . There are 2 possibilities:

  1. The data exists. connects to the source and loads the data into . There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible













Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set





















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.

DCT Rules

Field NameField DescriptionRule












Extraction Dependencies

Item #Step DescriptionTeam Responsible













Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation


Transformation will involve harmonizing supplier codes, plant IDs, and units of measure across systems. Where multiple legacy entries exist for the same material/plant, the most recent or business-prioritized record will be retained.

Quota percentage (ANZQU) will be recalculated if source values are inconsistent or incomplete. Date fields will be reformatted to YYYYMMDD and adjusted to cover valid procurement windows.

Transformation Run Sheet

Item #Step DescriptionTeam Responsible













Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic









































Transformation Mapping

Mapping Table NameMapping Table Description








Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible













Pre-Load Validation

Project Team

Completeness

TaskAction





Accuracy

TaskAction





Business

Completeness

TaskAction





Accuracy

TaskAction





Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible













Load Phase and Dependencies

Configuration

Item #Configuration Item






Conversion Objects

Object #Preceding Object Conversion Approach

list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram)




Error Handling

Error TypeError DescriptionAction Taken










Post-Load Validation

Project Team

Completeness

TaskAction





Accuracy

TaskAction





Business

Completeness

TaskAction





Accuracy

TaskAction





Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • is in scope based on data design and any exception requested by business.


See also

Change log

Version Published Changed By Comment
CURRENT (v. 10) Apr 29, 2026 06:54 SICONOLFI-ext, Michael
v. 142 Apr 22, 2026 13:17 SICONOLFI-ext, Michael
v. 141 Apr 20, 2026 13:07 SICONOLFI-ext, Michael
v. 140 Mar 13, 2026 07:13 SICONOLFI-ext, Michael
v. 139 Mar 13, 2026 06:48 MADHOK-ext, Jasleen
v. 138 Mar 12, 2026 19:26 MADHOK-ext, Jasleen
v. 137 Mar 12, 2026 18:56 MADHOK-ext, Jasleen
v. 136 Mar 12, 2026 18:49 MADHOK-ext, Jasleen
v. 135 Mar 12, 2026 18:43 MADHOK-ext, Jasleen
v. 134 Mar 12, 2026 12:56 SICONOLFI-ext, Michael

Go to Page History

Workflow history

Title Last Updated By Updated Status  
There are no pages at the moment.

  • No labels