Purpose
The purpose of this document is to define the conversion approach for Quota Arrangements to be uploaded into SAP S/4HANA as part of the Procurement Data Migration. Quota Arrangements are used to determine the distribution of procurement quantities across multiple sources of supply, providing control over vendor sourcing allocations.
---CHECKLIST---
- Logical Source and Target Systems are identified.
- Processing Type is specified (i.e. Direct Input, BAPI, IDoc, Web Service, OData API, etc.)
- Standard or custom load program name/BAPI/IDoc is specified to support this functionality.
- Data Mapping is provided for mappings which are not obvious to a suitably-skilled and experienced developer
- All translation requirements are clearly defined (including data validation rules, data derivation/calculation and default values, if applicable)Input and/or Output file layouts are provided for all record types possible
- Transaction volume is specified Execution frequency is specified Restart/Recovery requirements have been defined
- Error handling requirements are specified, including alerting requirement and expected action on failure.
- Application log requirement if applicable to be specified.
--- Additional topics to check---
- Update the Data Volume with a actual figures
- Rules for Data Merging (all systems)
- Mapping Rules & Conversion Rules
Conversion Scope
This conversion approach covers active and relevant Quota Arrangements maintained at the material, plant, and source (vendor or source list) level. Records from legacy ECC systems (e.g., PF2, WP2) will be extracted, validated, transformed, and loaded into the S/4HANA system.
Only quota entries linked to valid material and vendor combinations and with an active allocation percentage will be considered in scope. Obsolete, deleted, or inactive quota records will be excluded. The harmonization process will align multiple legacy records into a consistent target format.
The data from legacy system includes:
- Materials that are in scope for conversion
- Vendors that are valid and active in the target system
- Quota Arrangements with non-zero quota % and valid plant/material/vendor combinations
- Entries with recent procurement activity (last 3–5 years)
The data from legacy system excludes:
- Entries marked for deletion (QMAT-LOEKZ)
- Obsolete vendors or materials not migrated
- Quotas with zero allocation or expired validity period
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
| PF2 | Only open/valid documents will be migrated | 8 | S4/Hana | 4 |
| WP2 | Only open/valid documents will be migrated | 205 | S4/Hana | 42 |
Additional Information
Multi-language Requirement
Descriptions are not applicable for Quota Arrangement, but Plant and Purchasing Organization descriptions may be presented in English and logon language if available.
Document Management
N/A
Legal Requirement
N/A
Special Requirements
Processing Type ETL:
The extraction and transformation will be done by Syniti, while the loading will be executed by a Standard tool of SAP Migration Cockpit.
- E - Extraction: Data will be Extracted from at least two source systems. This process will be executed by Syniti
- T - Transform: Data will be Cleansed by Syensqo / Transformed, Merged, and generate a migration file (CSV - comma delimited) by Syniti
- L - Loading: Data will be Loaded using a custom Z-BAPI, custom function module, or BDC (Batch Data Communication) using MEQ1 that wraps this logic for reusability (no FM / BAPI / IDoc encountered)
Target Design
Quota Arrangement will be loaded into SAP S/4HANA using standard structures:
- Table: QMAT (Quota Arrangement by Material)
- Fields: MATNR, WERKS, LIFNR, KNTTP, KZUST, ANZQU, DATBI, DATAB, etc.
- The data must match the material master, vendor master, and source list configurations.
The technical design of the target for this conversion approach.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| EQUK | MANDT | MANDT | Client | CLNT | 3 | Required Key Field - Automatically updated |
| EQUK | MATNR | MATNR | Material Number | CHAR | 18‑40* | Required Key Field - Automatically updated |
| EQUK | WERKS | WERKS_D | Plant | CHAR | 4 | Required Key Field - Automatically updated |
| EQUK | BDATU | QUOBI | Quota arrangement period valid until | DATS | 8 | Required Key Field - Automatically updated |
| EQUK | VDATU | QUOAB | Quota arrangement period valid from | DATS | 8 | Required |
| EQUK | QUNUM | QUNUM | Number of quota arrangement | CHAR | 10 | Automatic |
| EQUK | ERDAT | ERDAT | Date on which record was created | DATS | 8 | Automatic |
| EQUK | ERNAM | ERNAM | Name of person who created the object | CHAR | 12 | Automatic |
| EQUK | SCMNG | SCMNG | Minimum quantity for splitting quota | QUAN | 15.3 | Conditional. Syensqo user need to specify the minimum quantity that a lot must have in order to be apportioned among several sources of supply in the planning run.
|
| EQUK | CHANGEDON | TIMESTAMPL | UTC timestamp when record was changed | DEC | 21 | Opcional |
| EQUP | MANDT | MANDT | Client | CLNT | 3 | Required Key Field - Automatically updated |
| EQUP | QUNUM | QUNUM | Number of quota arrangement | CHAR | 10 | Required Key Field - Automatically updated |
| EQUP | QUPOS | QUPOS | Quota arrangement item number | NUMC | 3 | Required Key Field - Automatically updated |
| EQUP | BESKZ | QBESK | Procurement type | CHAR | 1 | Required. Allowed procurement type will be based on material master data set-up. So if material master is set-up as External procurement, then user can only choose External procurement during quota arrangement creation. |
| EQUP | SOBES | SOBES | Special procurement type | CHAR | 1 | Conditional. If any special procurement such as consignment or subcontracting exist for a supplier, then choose relevant type in this field. |
| EQUP | LIFNR | ELIFN | Vendor account number | CHAR | 10 | Required |
| EQUP | BEWRK | BEWRK | Plant from which material is procured | CHAR | 4 | Not Required. Syensqo will not need quota arrangement for materials provided within internal production plants |
| EQUP | QUOTE | QUOTE | Quota | DEC | 3 | Required in case of multiple suppliers exist for particular material. Quota will be used to identify portion of quantity to be procured from particular supplier. |
| EQUP | QUBMG | QUBAS | Base quantity of quota arrangement item | QUAN | 15.3 | Conditional. Set quota base quantity if to avoid changes in the quantity to be allocated in case new source is added. If quota base quantity is not specified, then system will automatically allocate quantity to supplier(s). |
| EQUP | QUMNG | QUMNG | Allocated quantity of quota arrangement item | QUAN | 15.3 | Opcional |
| EQUP | MAXMG | QUMAX | Maximum quantity of quota arrangement item | QUAN | 15.3 | Opcional |
| EQUP | VERID | VERID | Production version | CHAR | 4 | Opcional |
| EQUP | MAXLS | MAXLS | Maximum lot size per quota item | QUAN | 13.3 | Opcional |
| EQUP | MINLS | MINLS | Minimum lot size per quota item | QUAN | 13.3 | Opcional |
| EQUP | RDPRF | RDPRF | Rounding profile | CHAR | 4 | Opcional |
| EQUP | KZEIN | KZEIM | Once‑only indicator | CHAR | 1 | Opcional |
| EQUP | ABRMG | ABRMG | Maximum release quantity per period | QUAN | 13.3 | Opcional |
| EQUP | ABPER | ABPER | Period related to release quantity | CHAR | 1 | Opcional |
| EQUP | ABANZ | ABANZ | Number of periods for release quantity | NUMC | 2 | Opcional |
| EQUP | PREIH | PREIH | Priority for determination sequence | NUMC | 2 | Opcional |
| EQUP | EMATN | EMATN | Manufacturer part number's material number | CHAR | 18 | Opcional |
| EQUP | PLIFZ | PLIFZ | Planned delivery time in days | DEC | 3 | Opcional |
Data Cleansing
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
| 001 | Medium | Ensure RFQ types (e.g., AN, ANQ) are valid and configured in S/4HANA | - Delete or correct RFQs using types that are not configured in S/4HANA - Map to valid types if migration logic allows | ||
| 002 | Medium | Consistent numbering scheme, no duplicates | -Identify duplicates via RFQ number (e.g., EBAN-BANFN or custom RFQ ID) - Keep only one version, preferably the most recent - Renumber only if permitted by target system config | ||
| 003 | Medium | RFQ dates (creation, validity from/to) must be consistent and within allowed range | - Correct invalid dates (e.g., validity end before start) - Delete expired RFQs if beyond retention cutoff (e.g., older than 5 years) - Flag records with future-dated creation or unrealistic validity ranges for review | ||
| 004 | Medium | Material (MATNR) not in the approved Material Master scope | Delete the line item from the RFQ | ||
| 005 | Medium | Material flagged for deletion (MARA–LVORM = X or MM03 deletion flag) | Exclude the RFQ line | ||
| 006 | Medium | Material belonging to an obsolete Material Group (MATKL) | Validate with business, likely delete | ||
| 007 | Medium | Non-stock/service items without master data in S/4HANA | Exclude or replace with valid alternatives |
Conversion Process
The high-level process is represented by the diagram below:
Data Privacy and Sensitivity
Extraction
Extract data from a source into . There are 2 possibilities:
- The data exists. connects to the source and loads the data into . There are 3 methods:
- Perform full data extraction from relevant tables in the source system(s).
- Perform extraction through the application layer.
- Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
- The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
Extraction Run Sheet
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| 001 | The material exists and is in scope | Syniti Team |
| 002 | The plant exists and is in scope | Syniti Team |
| 003 | The vendor is active and valid | Syniti Team |
| 004 | The quota is > 0 | Syniti Team |
| 005 | The record is not marked for deletion | Syniti Team |
| 006 | The record has not expired (DATBI >= current date) | Syniti Team |
| 007 | Select records where EQUK-ERDAT >= 01.01.2023 | Syniti Team |
Selection Screen
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
Data Collection Template (DCT)
Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.DCT Rules
| Field Name | Field Description | Rule |
|---|---|---|
Extraction Dependencies
Quota Arrangements depend on the successful migration of the following objects:
| Item # | Step Description | Team Responsible |
|---|---|---|
| 001 | Material Master | |
| 002 | Vendor Master | |
| 003 | Source List (EORD) | |
| 004 | Purchasing Info Records |
These must be loaded prior to the execution of Quota Arrangement upload.
Transformation
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:
- Perform value mapping and data transformation rules.
- Legacy values are mapped to the to-be values (this could include a default value)
- Values are transformed according to the rules defined in
- Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation
Transformation will involve harmonizing supplier codes, plant IDs, and units of measure across systems. Where multiple legacy entries exist for the same material/plant, the most recent or business-prioritized record will be retained.
Quota percentage (ANZQU) will be recalculated if source values are inconsistent or incomplete. Date fields will be reformatted to YYYYMMDD and adjusted to cover valid procurement windows.
Transformation Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
Transformation Mapping
| Mapping Table Name | Mapping Table Description |
|---|---|
Transformation Dependencies
List the steps that need to occur before transformation can commence| Item # | Step Description | Team Responsible |
|---|---|---|
Pre-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Business
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Load
The load process includes:
- Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation;
- The data will be loaded using SAP LSMW leveraging BAPI_QUOTA_CREATE. No standard Migration Cockpit object exists for quota arrangements.
- The BAPI supports creation of records based on target-aligned templates. Staging Tables or Source Files will be handled by Syniti.
Load will occur in mock and production phases, with logs captured and reviewed for consistency, completeness, and errors.
Load Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
Load Phase and Dependencies
Configuration
| Item # | Configuration Item |
|---|---|
Conversion Objects
| Object # | Preceding Object Conversion Approach |
|---|---|
| list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram) | |
Error Handling
| Error Type | Error Description | Action Taken |
|---|---|---|
Post-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Business
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Key Assumptions
- Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
- is in scope based on data design and any exception requested by business.
See also
Change log
Workflow history
| Title | Last Updated By | Updated | Status | |
|---|---|---|---|---|
| There are no pages at the moment. | ||||