The purpose of this document is to define the conversion approach to create 1040-Production Versions in S/4 HANA.

Production Version is used to define the product data structure. Meaning PV contains Master Recipe, BOM and Resources. According with lot size, Production version can be defined for each material to be processed in several production units. Usually, all Manufacturing plants need to use Production Versions for planning and scheduling processes. The aim is to migrate all the active Prod. Versions to S/4 HANA.


Conversion Scope

The scope of this document covers the approach for converting active from Legacy Source Systems into S/4HANA following the Master Data Design Standard.


The data from legacy system includes:

  1. All active Production Versions and no more than 3 years of usage.
  2. All active Production Versions W/o locked status
  3. All Active Production Versions W/O Deletion Flag
  4. All active Production Versions related to active material and Plant (Mapped in the To-Be Plant Mapping)

The data from legacy system excludes:

  1. All Production Versions older more than 3 years
  2. All production versions with Locked status
  3. All Production Versions with deletion flag
  4. All Production Versions belonging to Materials flagged for deletion
  5. All Production Versions Belonging to Material-Plant combination not existing in the To-be Plant Mapping


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records





















Additional Information

Multi-language Requirement

Document Management

Legal Requirement

Special Requirements




Target Design

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement






















Data Cleansing

IDCriticalityError Message/Report DescriptionRuleOutputSource System


























Conversion Process

The high-level process is represented by the diagram below:


Data Privacy and Sensitivity


Extraction

Extract data from a source into . There are 2 possibilities:

  1. The data exists. connects to the source and loads the data into . There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible













Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set





















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.

DCT Rules

Field NameField DescriptionRule












Extraction Dependencies

Item #Step DescriptionTeam Responsible













Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible













Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic









































Transformation Mapping

Mapping Table NameMapping Table Description








Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible













Pre-Load Validation

Project Team

Completeness

TaskAction





Accuracy

TaskAction





Business

Completeness

TaskAction





Accuracy

TaskAction





Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible













Load Phase and Dependencies

Configuration

Item #Configuration Item






Conversion Objects

Object #Preceding Object Conversion Approach

list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram)




Error Handling

Error TypeError DescriptionAction Taken










Post-Load Validation

Project Team

Completeness

TaskAction





Accuracy

TaskAction





Business

Completeness

TaskAction





Accuracy

TaskAction





Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • is in scope based on data design and any exception requested by business.


See also

Change log

Version Published Changed By Comment
CURRENT (v. 1) Apr 29, 2026 14:28 ULLAH-ext, Colin
v. 52 Apr 28, 2026 10:00 ULLAH-ext, Colin
v. 51 Apr 27, 2026 10:28 ULLAH-ext, Colin
v. 50 Apr 27, 2026 09:19 ULLAH-ext, Colin
v. 49 Apr 20, 2026 14:07 ULLAH-ext, Colin
v. 48 Apr 14, 2026 11:21 ULLAH-ext, Colin
v. 47 Mar 18, 2026 16:02 ULLAH-ext, Colin
v. 46 Mar 12, 2026 16:03 ULLAH-ext, Colin
v. 45 Mar 12, 2026 15:32 ULLAH-ext, Colin Updated DCT Fields STLAN and PLTYG
v. 44 Feb 24, 2026 10:50 ULLAH-ext, Colin

Go to Page History