The purpose of this document is to define the conversion approach to create Batch Classes (Class Type: 023) in S/4 HANA.

Currently, in the legacy systems, batch classes are created and assigned to materials to capture logistics and quality-related information through characteristic values. However, there may be multiple duplicate classes existing within the system, which need to be standardized across both legacy systems as part of the SyWay Design.

Batch Class 023 in SAP is designed to store and manage characteristics relevant to batches, supporting both logistics and quality requirements for effective batch management and traceability.


Conversion Scope

The scope of this document covers the approach for converting active and valid Batch Classes from Legacy Source Systems (PF2 & WP2) into S/4HANA following the Batch Class (Class Type: 023) Master Data Design Standard.

Standardizing these Batch Classes ensures a consistent structure for batch data across materials and processes.

The data from legacy system includes:

  1. Batch Class of Class Type: 023
  2. Class Validity (Valid From and Valid To), Valid Date to be considered as Data of Extraction.
  3. Class Groups
  4. Characteristics Assignment 
  5. Status as "1" - Released

The data from legacy system excludes:

  1. Status as "0" - In Preparation
  2. Status as "2" - Locked
  3. No Characteristics Assignment


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2Only Valid Batch Class and with Characteristics Assignment1816SyWay - ERDTBD
WP2Only Valid Batch Class and with Characteristics Assignment34SyWay - ERDTBD

Additional Information

Multi-language Requirement

Not Applicable

Document Management

Not Applicable

Legal Requirement

Not Applicable

Special Requirements




Target Design

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement






















Data Cleansing

IDCriticalityError Message/Report DescriptionRuleOutputSource System


























Conversion Process

The high-level process is represented by the diagram below:


Data Privacy and Sensitivity


Extraction

Extract data from a source into . There are 2 possibilities:

  1. The data exists. connects to the source and loads the data into . There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible













Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set





















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.

DCT Rules

Field NameField DescriptionRule












Extraction Dependencies

Item #Step DescriptionTeam Responsible













Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible













Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic









































Transformation Mapping

Mapping Table NameMapping Table Description








Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible













Pre-Load Validation

Project Team

Completeness

TaskAction





Accuracy

TaskAction





Business

Completeness

TaskAction





Accuracy

TaskAction





Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible













Load Phase and Dependencies

Configuration

Item #Configuration Item






Conversion Objects

Object #Preceding Object Conversion Approach

list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram)




Error Handling

Error TypeError DescriptionAction Taken










Post-Load Validation

Project Team

Completeness

TaskAction





Accuracy

TaskAction





Business

Completeness

TaskAction





Accuracy

TaskAction





Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • is in scope based on data design and any exception requested by business.


See also

Change log

Version Published Changed By Comment
CURRENT (v. 5) Nov 18, 2025 18:07 RAYUDU-ext, Narasimha Kumar
v. 22 Nov 18, 2025 17:59 RAYUDU-ext, Narasimha Kumar Tooltip Updated.
v. 21 Oct 15, 2025 13:58 RAYUDU-ext, Narasimha Kumar
v. 20 Oct 15, 2025 13:50 RAYUDU-ext, Narasimha Kumar Language & Chars Assignment
v. 19 Oct 08, 2025 14:18 RAYUDU-ext, Narasimha Kumar Added Config Item dependencies
v. 18 Oct 02, 2025 14:56 RAYUDU-ext, Narasimha Kumar Updated Peer Review comments
v. 17 Oct 02, 2025 00:35 RAYUDU-ext, Narasimha Kumar
v. 16 Oct 01, 2025 15:10 RAYUDU-ext, Narasimha Kumar
v. 15 Oct 01, 2025 13:27 RAYUDU-ext, Narasimha Kumar
v. 14 Oct 01, 2025 11:31 RAYUDU-ext, Narasimha Kumar

Go to Page History

  • No labels