| Status | Revision in Progress |
|---|---|
| Owner | |
| Stakeholders | WELENSKY-ext, Dave ERGUIZA-ext, Pinky Love VILARES, ines LEIGHTON-ext, Dean Anirudh Lakkad; Aurelia Stefanescu ; [Syniti POD Lead]; [Syniti Consultant] |
Purpose
The purpose of this document is to define the conversion approach to create Maintenance Strategy in S/4 HANA.
Legacy Plant Maintenance Maintenance Strategy is using a diverse range of formats across the different systems. There are instances where the same Maintenance Strategy is duplicated within and across sources, with informal words. This results in data inconsistency. As per SyWay design, Maintenance Strategy will be standardized.
Conversion Scope
The scope of this document covers the approach for converting active Maintenance Strategy from Legacy Source Systems into S/4HANA following the Maintenance Strategy Master Data Design Standard.
A Maintenance Strategy in SAP defines how and when maintenance tasks should be performed. It’s a core concept in SAP Plant Maintenance (PM) that helps organizations plan preventive maintenance activities efficiently.
No data from legacy system will be migrated and all new strategies will be constructed using DCT.
Types of strategy (defined by the first 2 characters of the strategy):
| First 2 characters | Strategy Type | Description | Application | Example |
|---|---|---|---|---|
| 01 | Time-Based | Used for assets that require preventive maintenance at fixed time intervals. | Maintenance cycles defined in days, weeks, months, or years. | Lubrication every 3 months, inspection every 12 months. |
| 02 | Performance-Based | Used for assets that require preventive maintenance based on operational usage or performance. | Maintenance cycles defined in measured units such as operating hours, kilometres, or production counts. | Preventive maintenance every 2,000 operating hours. |
| 03 | Corrective | Used to manage corrective or run-to-failure maintenance and differentiate task lists for repeated corrective activities. | Contains a dummy package and acts as a placeholder to enable reuse of corrective task lists. | Standard repair procedures applied upon failure. |
| 04 | Turnaround/Shutdown | Used for assets undergoing maintenance during planned turnarounds or shutdowns. | Defines repetitive and pre-planned maintenance work during turnaround/shutdown periods. | Boiler overhaul during annual plant shutdown. |
List of source systems and approximate number of records
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
DCT | All Maintenance Strategy will be constructed using DCT | 400 | S/4HANA | 400 |
Additional Information
Multi-language Requirement
Maintenance Strategy description will be made available in English.
Multi language is supported for Maintenance Strategy. Login via a different language will have its description displayed in the logon language if the language key is maintained in the Maintenance Strategy.
To view/edit the record in other languages, in the Menu click Goto > Translation and select the required language.
Document Management
Not Applicable
Legal Requirement
Not Applicable
Special Requirements
Not Applicable
Target Design
The technical design of the target for this conversion approach.
1.Maintenance Strategy
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| T351 | STRAT | STRAT | Maintenance Strategy | CHAR | 6 | Mandatory |
| T351 | ZEIEH | DZEIEH | Unit for the performance of maintenance tasks | UNIT | 3 | Mandatory |
| T351 | TOLE1 | TOLERPLUS | Tolerance for Late Completion (%) | NUMC | 3 | Conditional |
| T351 | TOLE2 | TOLERNEG | Tolerance for Early Completion (%) | NUMC | 3 | Conditional |
| T351 | VERS1 | VERSCHPLUS | Shift Factor for Late Completion | NUMC | 3 | Conditional |
| T351 | VERS2 | VERSCHNEG | Shift Factor for Early Completion | NUMC | 3 | Conditional |
| T351 | TERMK | TERMKNZ | Scheduling indicator | CHAR | 1 | Mandatory |
| T351 | HORIZ | HORIZONT | Call horizon for maintenance plan calls | NUMC | 3 | Conditional |
| T351 | HORIZ_QUALIFIER | EAM_CC_CALLHORIZON_QUALIFIER | Calculation Type of Call Horizon | CHAR | 1 | Conditional |
2. Maintenance Strategy Text
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| T351 | STRAT | STRAT | Maintenance Strategy | CHAR | 6 | Mandatory |
| T351T | SPRAS | SPRAS | Language Key | LANG | 1 | Mandatory |
| T351T | KTEXT | TXWSTRA | Description of maintenance strategy | CHAR | 30 | Mandatory |
3.Maintenance Package
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| T351 | STRAT | STRAT | Maintenance Strategy | CHAR | 6 | Mandatory |
| T351P | ZAEHL | PAKETZAEHL | Maintenance Package Number | NUMC | 2 | Mandatory |
| T351P | ZEIEH | DZEIEH | Unit for the performance of maintenance tasks | UNIT | 3 | Mandatory |
| T351P | OFFZT | DZYK_OFFZT | Start offset of a time-based maintenance package | FLTP | 16(16) | Conditional |
4. Maintenance Package Text
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| T351 | STRAT | STRAT | Maintenance Strategy | CHAR | 6 | Mandatory |
| T351P | ZAEHL | PAKETZAEHL | Maintenance Package Number | NUMC | 2 | Mandatory |
| T351X | SPRAS | SPRAS | Language Key | LANG | 1 | Mandatory |
| T351X | KTEX1 | TXZYKLUS | Text for maintenance package/cycle (time/performance) | CHAR | 30 | Mandatory |
| T351X | KZYK1 | KTEXTZYK | Short text for the maintenance cycle (time/performance) | CHAR | 2 | Mandatory |
| T351X | KTXHI | KTEXTHIER | Short text of the maintenance package hierarchy | CHAR | 2 | Mandatory |
Note: Each Maintenance Strategy and Maintenance Package must have 1 entry for each language in scope: English, French, Italian, Mandarin, Brazilian, Portuguese, German and Spanish
Maintenance Strategy Data strictly adheres to the Master Data Standard. The complete information of the key fields that hold the Maintenance Strategy information follows the Master Data Standard document that is located here.
Data Cleansing
No data cleansing is required for Maintenance Strategy in the legacy system. If any cleansing is deemed necessary, it will be performed outside of the system.
As a result, the cleansed Maintenance Strategy data will be populated directly in the Data Collection Template (DCT).
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
| Not Applicable |
Conversion Process
All data will be constructed for Maintenance Strategy using DCT.
The high-level process for DCT is represented by the diagram below:
Data Privacy and Sensitivity
Extraction
Extract data from a source into the . There are 2 possibilities:
- The data exists. connects to the source and loads the data into the repository. There are 3 methods:
- Perform full data extraction from relevant tables in the source system(s).
- Perform extraction through the application layer.
- Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
- The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in the repository. This is to be conducted using DCT (Data Collection Template) in
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
Extraction Run Sheet
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| 1 | Extract all legacy Maintenance Strategy data. This includes Maintenance Strategy, Maintenance Strategy Texts, Maintenance Package, Maintenance Strategy Package Texts (T351, T351T, T351P, T351X). The data will not be migrated but used for mapping of old to new Maintenance Strategy. | SyWay Data Team |
Selection Screen
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
Not Applicable |
Data Collection Template (DCT)
Target Ready Data Collection Template will be created for Maintenance Strategy data with exception of some fields which require transformation as mentioned in the transformation rule.Maintenance Strategy DCT Rules
1.Maintenance Strategy
| Field Name | Field Description | Rule |
|---|---|---|
| STRAT | Strategy | Maintenance Strategies shall follow the below Mask
XXX = Sequential Number starting 001 |
| ZEIEH | Unit for the performance of maintenance tasks | Must not be blank Must reference active Units of Measurement in config (T006) |
| TOLE1 | Tolerance for Late Completion (%) | Default to "0" unless provided by business |
| TOLE2 | Tolerance for Early Completion (%) | Default to "0" unless provided by business |
| VERS1 | Shift Factor for Late Completion | Default to "0" unless provided by business |
| VERS2 | Shift Factor for Early Completion | Default to "0" unless provided by business |
| TERMK | Scheduling indicator | If the Maintenance Strategy is Time Based then Scheduling Indicator = "TIME" If the Maintenance Strategy is Performance Based then the Scheduling Indicator = "Activity" The Time Based or Performance based can be identified based on the Naming Convention of the strategy |
| HORIZ | Call horizon for maintenance plan calls | Default to "100" unless provided by business |
| HORIZ_QUALIFIER | Calculation Type of Call Horizon | Default to "%" |
2.Strategy Text
| Field Name | Field Description | Rule |
|---|---|---|
| STRAT | Strategy | Must reference STRAT from Maintenance Strategy |
| SPRAS | Language Key | Must not be blank. Must reference active Language Key in config (T002) |
| KTEXT | Description | Must not be blank |
3.Maintenance Package
| Field Name | Field Description | Rule |
|---|---|---|
| STRAT | Strategy | Must reference STRAT from Maintenance Strategy |
| ZAEHL | Maintenance Package Number | Must not be blank. Numeric values only. Sequential ascending values only. |
| ZEIEH | Unit for the performance of maintenance tasks | Must not be blank. Must reference active Units of Measurement in config (T006) |
| OFFZT | Start offset of a time-based maintenance package | |
| KTEX1 | Text for maintenance package/cycle (time/performance) | Must not be blank. Refer FLOC and EQUIP MDS for Multilingual Description rules |
| KZYK1 | Short text for the maintenance cycle (time/performance) | Must not be blank. Refer FLOC and EQUIP MDS for Multilingual Description rules |
| KTXHI | Short text of the maintenance package hierarchy | Must not be blank. Refer FLOC and EQUIP MDS for Multilingual Description rules |
4.Maintenance Package Texts
| Field Name | Field Description | Rule |
|---|---|---|
| STRAT | Strategy | Must reference STRAT from Maintenance Strategy |
| PAKET | Maintenance Package Number | Must not be blank. Numeric values only. Sequential ascending values only. |
| SPRAS | Language Key | Must not be blank. Must reference active Language Key in config (T002) |
| KTEX1 | Text for maintenance package/cycle (time/performance) | Must not be blank |
| KZYK1 | Short text for the maintenance cycle (time/performance) | Must not be blank |
| KTXHI | Short text of the maintenance package hierarchy | Must not be blank |
Extraction Dependencies
No extraction of legacy data will be done as all data will be constructed.
| Item # | Step Description | Team Responsible |
|---|---|---|
Not Applicable |
Transformation
All data will be constructed with the target values. No transformation is required.
The data is maintained in Syniti Data Construction page.
Transformation Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
Not Applicable |
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | DCT | T351T | KTEXT | Description | S/4HANA | T351T | KTEXT | Description | Value Mapping: OTH_Informal Words and OTH_Informal Characters Review the value mappings for the presence of informal words or invalid characters. If any are identified, replace them with the appropriate standardized values as specified in the mappings. Validation:
|
| 2 | DCT | T351X | KTEX1 | Description | Value Mapping: OTH_Informal Words and OTH_Informal Characters Review the value mappings for the presence of informal words or invalid characters. If any are identified, replace them with the appropriate standardized values as specified in the mappings. Validation:
|
List of Custom Target Reports for this object is maintained here: Conversion Specification - Custom Reports Register.
Transformation Mapping
All data will be constructed with the target values. Data entries in DCT are target-ready data unless a specific transformation rule is stated for that field in the transformation rules.
| Mapping Table Name | Mapping Table Description |
|---|---|
| Maintenance Strategy | Old to new Maintenance Strategy |
| Language Keys | Old to New Language Key |
| OTH_Informal Words | List of Informal Words and the words used to replace |
| OTH_Informal Characters | List of Informal Characters |
Transformation Dependencies
All data will be constructed with the target values. No transformation is required.| Item # | Step Description | Team Responsible |
|---|---|---|
Not Applicable |
Pre-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Verify Record Count | SyWay A2D Data Team to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets. |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | SyWay A2D Data Team to verify that all fields below meet pass the checks:
|
Review Error Reports | Review and correct the errors. Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data. |
Business
Completeness
| Task | Action |
|---|---|
Verify Record Count | Business Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets. |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | Business Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data). |
Load
The load process includes:
- Execute the automated data load into target system using load tool or produce the load file if the load must be done manually
- Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation
Load Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Obtain DCT Sign-off from Business | SyWay A2D Data Team |
| 2 | Syniti will provide load file | Syniti |
| 3 | Go to <Load Tool> | SyWay A2D Data Team/Syniti |
| 4 | Load 3 records for Maintenance Strategy for function (IP11) to validate if data is loaded successfully without errors | SyWay A2D Data Team/Syniti |
| 5 | Proceed with full load if step 4 is validated | SyWay A2D Data Team/Syniti |
| 6 | Validate few records loaded by accessing standard transactions from S/4HNA E.g. IP12 | SyWay A2D Data Team/Syniti |
| 7 | Generate post load report if step 6 is validated | SyWay A2D Data Team/Syniti |
Load Phase and Dependencies
Configuration
| Item # | Configuration Item |
|---|---|
| 1 | Unit of Measure |
Conversion Objects
| Object # | Preceding Object Conversion Approach |
|---|---|
| Not Applicable |
Error Handling
| Error Type | Error Description | Action Taken |
|---|---|---|
Configuration | Invalid Unit of Measure | Engage Functional team to expedite and fix the error in the system |
Configuration | Invalid Language Key | Engage Functional team to expedite and fix the error in the system |
Invalid Data | Maintenance Package: Invalid Maintenance Strategy | Check whether the Maintenance Strategy exist in Maintenance Strategy table |
Post-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Verify Count | SyWay A2D Data Team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA. |
Verify Logs | Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.). |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | SyWay A2D Data Team to verify that the Maintenance Strategy data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. |
Business
Completeness
| Task | Action |
|---|---|
Verify Count | Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file. |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | Verify that the Maintenance Strategy data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. |
Key Assumptions
- Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
- Data cleansing has met the required percentage threshold for the specified mock cycle and all preparation activities have been completed.
- Data entries in DCT are target-ready data unless a specific transformation rule is stated for that field in the transformation rules.
- Valid legacy data objects dependent on S4/HANA Maintenance Strategy have relevant S4/HANA strategy/packages mapped
See also
Change log
Workflow history
| Title | Last Updated By | Updated | Status | |
|---|---|---|---|---|
| There are no pages at the moment. | ||||
