| Status | Revision in Progress |
|---|---|
| Owner | |
| Stakeholders |
| Team Involved | Area |
| Metawat Sawasdee | Business |
| Umesh Mudri | Technical |
| Shivang Dala | Technical |
| Ravindra Mantri | Functional |
| Eluard Montineira | Functional |
Purpose
The purpose of this document is to define the conversion approach to migrate Vendor Doc Attachments to S/4 HANA.
This allows to associate relevant documents, like contracts or certifications, with specific vendors.
Attachment Functionality in SAP ECC
- Storage Method: Attachments are typically stored using Generic Object Services (GOS), which allow users to link files to sales documents (via transaction codes like ME21N, ME22N, ME23N).
- Technical Reference: The attachments are managed via the Business Object Repository (BOR) object. The Business Object Repository (BOR) in SAP is a central access point for SAP business object types and their corresponding Business Application Programming Interfaces (BAPIs). It provides an object-oriented view of data and processes within an SAP system and is crucial for integrating SAP with external applications. The BOR also plays a role in SAP Business Workflow, ArchiveLink, and output control.
Below are the object names with their document types. There could be more that are applicable
BUS2009 - Purchase Requisition Item
BUS2010 - Vendor Quotation Request
BUS2011 - Vendor Quotation
BUS2012 - Purchase Order
BUS2013 - Purchase Scheduling Agreement
BUS2014 - Purchase Contract
BUS2015 - Inbound Delivery
BUS2020 - Vendor Document
BUS2025 - Purchasing Contract
BUS2052 - Purchase Outline Agreement
BUS2105 - Purchase Requisition
BUS2125 - Vendor related Customer Billing Document
BUS2126 - Vendor Billing Document
BUS2126001 Single Vendor Billing Document
BUS3003 Purchasing information
BUS3008 - Vendor Account
etc
Changes in SAP S/4HANA
- Attachments are linked using the Attachment List Service (also used in Fiori apps).
- Technically embedded in the Business Object Processing Framework (BOPF) or handled by Object Page Layout for Fiori views
- User Experience Enhancements: Drag-and-drop uploads via Fiori.
Attachment Types
Any type of document can be an attachment, and can be attached when the user creates a PO from the shopping cart.
In most cases this is a PDF type attachment, and includes Invoices, Specs, Emails....
Conversion Scope
The scope of this document covers the approach for converting active from Legacy Source Systems into S/4HANA following the Master Data Design Standard.
The data from legacy system includes:
The data from legacy system excludes:
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
Additional Information
Multi-language Requirement
Document Management
Legal Requirement
Special Requirements
Target Design
The technical design of the target for this conversion approach.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
Data Cleansing
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
Conversion Process
The high-level process is represented by the diagram below:
Data Privacy and Sensitivity
Extraction
Extract data from a source into . There are 2 possibilities:
- The data exists. connects to the source and loads the data into . There are 3 methods:
- Perform full data extraction from relevant tables in the source system(s).
- Perform extraction through the application layer.
- Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
- The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
Extraction Run Sheet
| Req # | Requirement Description | Team Responsible |
|---|---|---|
Selection Screen
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
Data Collection Template (DCT)
Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.DCT Rules
| Field Name | Field Description | Rule |
|---|---|---|
Extraction Dependencies
| Item # | Step Description | Team Responsible |
|---|---|---|
Transformation
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:
- Perform value mapping and data transformation rules.
- Legacy values are mapped to the to-be values (this could include a default value)
- Values are transformed according to the rules defined in
- Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation
Transformation Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
Transformation Mapping
| Mapping Table Name | Mapping Table Description |
|---|---|
Transformation Dependencies
List the steps that need to occur before transformation can commence| Item # | Step Description | Team Responsible |
|---|---|---|
Pre-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Business
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Load
The load process includes:
- Execute the automated data load into target system using load tool or product the load file if the load must be done manually
- Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation
Load Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
Load Phase and Dependencies
Configuration
| Item # | Configuration Item |
|---|---|
Conversion Objects
| Object # | Preceding Object Conversion Approach |
|---|---|
| list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram) | |
Error Handling
| Error Type | Error Description | Action Taken |
|---|---|---|
Post-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Business
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Key Assumptions
- Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
- is in scope based on data design and any exception requested by business.