Status

  Revision in Progress

Owner
StakeholdersWELENSKY-ext, DaveERGUIZA-ext, Pinky Love TEE-ext, Paul  JOSHI-ext, Aditya VILARES, ines LEIGHTON-ext, Dean Anirudh Lakkad; Aurelia Stefanescu ; [Syniti POD Lead]; [Syniti Consultant]

Purpose

The purpose of this document is to define the conversion approach to create PM Assembly / Construction Type in S/4 HANA. For the purpose of this document, the term Construction Type shall refer to the object PM Assembly / Construction Type.

In SAP Plant Maintenance (SAP S/4 HANA EAM), the Construction Type is a material master reference assigned to a technical object (equipment or functional location) to represent its standard design or assembly structure. This allows the system to link standard data such as Bills of Materials (BOM), Task Lists, and Catalogs to multiple technical objects that share the same physical construction 

The Catalog profile assigned to the construction type is used to define the Object Parts, Causes, Damages of the asset.

Below are the guiding principles of the Construction Type:

  • Grouping Similar Assets:
    A Construction Type (CT) is created to group assets that share similar construction characteristics and are built using the same components.
  • Standardized Maintenance Strategy:
    Each CT is linked to a specific maintenance strategy. If the maintenance strategy differs, a separate CT is required.
  • BOM-Based Structuring:
    CTs are defined based on Bill of Materials (BOMs) that apply across similar asset types. These BOMs outline the construction hierarchy using sub-assemblies.
  • FMECA-Driven Classification:
    CTs also take into account Failure Modes, Effects, and Criticality Analysis (FMECA) codes relevant to the construction of the asset, supporting reliability-centered maintenance planning for all similar types of Assets.

Construction Type needs to be constructed as a logical grouping based on the above.

Conversion Scope

The scope of this document covers the approach for creation of Construction Type in S/4 HANA following the PM Assembly / Construction Type Master Data Design Standard. 

The creation of Construction Type follows the endorsed EAM Core Data Design describing the Asset Identification Methodology.

Legacy system did not have the concept of using PM Assembly in the similar manner as S/4 Hana. Hence there is no extraction of Construction Type required from Legacy.

The data from legacy system includes:

  1. All active Material Master with the Material Type from the below list:
    1. IBAU-Maintenance Assembly
    2. Z750-0 Aggregates PM IBAU (PF1 only)
    3. ZZ90-Maintenance Assembly (PF1 only)
    4. ZIBA-Maintenance Assembly (WP1 Only)

The data from legacy system excludes:

  1. Construction Types marked for deletion (Deletion Indicator = X)


List of source systems and approximate number of records 

SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2, WP2

Construction Type will be collected via DCT. An initial extract of the relevant Construction Type will be provided in google sheet format to assist business in decision making on including any relevant Construction Type from PF2 and WP2 as Construction Type in S/4 HANA.

Any additional Construction Type that need to be created to support the new design may be added in the DCT.

A review and standardization will be done across all Construction Type in the DCT. 

Please see an indication of what will be baselined from source systems below and what will be constructed in the DCT. 

150,000S/4 HANA150,000

Additional Information

Multi-language Requirement

Construction Type description will be made available in English.

Multi language is supported for Construction Type. Login via a different language will have its description displayed in the logon language if the language key is maintained in the Construction Type.

Document Management

Not Applicable

Legal Requirement

Not Applicable

Special Requirements

Not Applicable

Target Design

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement






















Data Cleansing

No data cleansing is required for Construction Type in the legacy system. If any cleansing is deemed necessary, it will be performed outside of the system.

As a result, the cleansed Catalog Profile data will be populated directly in the Data Collection Template (DCT).

IDCriticalityError Message/Report DescriptionRuleOutputSource System


Not Applicable




Conversion Process

The high-level process is represented by the diagram below:

 Collection will be done manually in the Data Collection Template for the following scenarios:

  • For sites not on SAP-PF2 or WP2 systems
  • For new Construction Types that need to be created to support the to-be design

Data Privacy and Sensitivity

Not Applicable


Extraction

Extract data from a source into Syniti Migrate. There are 2 possibilities:

  1. The data exists.Syniti Migrate connects to the source and loads the data into Syniti Migrate. There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if Syniti Migrate; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in Syniti Migrate. This is to be conducted using DCT (Data Collection Template) in Syniti Migrate

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible
1

Extract data from source system based on relevancy rule

SyWay Data Team
2

Google Sheet report pre-populated with PF2 and WP2 information to be generated based on relevancy criteria. 

SyWay Data Team

Selection Screen


Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set
Not Applicable



















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.

DCT Rules

Field NameField DescriptionRule












Extraction Dependencies

Item #Step DescriptionTeam Responsible

Not Applicable


Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow Syniti Migrate to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in Syniti Migrate
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible

1

Obtain DCT Sign-off from Business.

SyWay Data Team

2

In dspMigrate, select the wave – S4/HANA – Plant Maintenance

Syniti

3

Go to Process Area Launch and Process the Object – Catalog Profile

Syniti

4

Review and Validate Error and Preload Reports

Syniti

5

Execute the transformation to prepare the target tables

Syniti

6

Validate data from pre-load and error reports

Business/Data owner

7

Generate load files

SyWay Data Team


Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic









































Transformation Mapping

Mapping Table NameMapping Table Description








Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible













Pre-Load Validation

Project Team

Completeness

TaskAction

Verify Record Count 

Data team to verify that the total number of relevant records from the source systems is equal to the total number of records in the Preload and Load Sheets.


Accuracy

TaskAction

Conversion Accuracy

Data team to verify that all fields below meet pass the checks:

1. Mandatory Fields

2. Field and Value Mapping Correctness

3. Null Checks

4. Text Length Checks

Review error reports

Review and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data.


Business

Completeness

TaskAction

Verify Record Count 

Business team to verify that the total number of relevant records from the source systems is equal to the total number of records in the Preload and Load Sheets.


Accuracy

TaskAction

Conversion Accuracy

Business  to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off data) 


Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible













Load Phase and Dependencies

Configuration

Item #Configuration Item
1Number Range
2Class Types
3Units of Measurement
4

Material Types

5

Industries for materials

Conversion Objects

Object #Preceding Object Conversion Approach
1008Catalog Profile
1015Characteristics
1009Class

Error Handling

Error TypeError DescriptionAction Taken










Post-Load Validation

Project Team

Completeness

TaskAction

Verify Count

Data team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA.

Verify Logs

Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue, or attempt to load the record again, etc.).


Accuracy

TaskAction

Conversion Accuracy

Data team to verify that the Construction Type data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. 


Business

Completeness

TaskAction

Verify Count

Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file.


Accuracy

TaskAction

Conversion Accuracy

Verify that the Measuring Point data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA.


Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • Data cleansing has met the required percentage threshold for the specified mock cycle and all preparation activities have been completed.
  • Data entries in DCT are target-ready data unless a specific transformation rule is stated for that field in the transformation rules.
  • Not all legacy Construction Type need to be mapped to S/4 HANA Construction Type. If any of the successor objects is dependent on a Construction Type field with no mapped values, this will be an enrichment activity or manual transformation for the successor object to derive the Construction Type.


See also

Change log

Version Published Changed By Comment
CURRENT (v. 13) Apr 08, 2026 14:57 PUN-ext, Eddy
v. 134 Feb 10, 2026 12:25 PUN-ext, Eddy
v. 133 Feb 05, 2026 13:55 PUN-ext, Eddy CR0280-Additional DCTs for Approved Conversion Specs
v. 132 Feb 05, 2026 13:10 PUN-ext, Eddy
v. 131 Feb 05, 2026 11:42 PUN-ext, Eddy
v. 130 Feb 03, 2026 15:45 PUN-ext, Eddy
v. 129 Feb 03, 2026 15:44 PUN-ext, Eddy
v. 128 Nov 25, 2025 11:51 PUN-ext, Eddy Replaced KSML-POSNR with AUSP-POSNR
v. 127 Nov 17, 2025 16:11 PUN-ext, Eddy Replaced Allowed TOT Characteristics with A_ALLOWED_TOT
v. 126 Nov 17, 2025 16:09 PUN-ext, Eddy Characteristic name change from Sub Assembly to A_SUB_ASSEMBLY, new mapping table Old to New Characteristic A2D

Go to Page History

  • No labels