Purpose
The purpose of this document is to define the conversion approach to create Conversion Specification Document CNV-2009 Material Master – QM View in S/4HANA.
The QM View in the Material Master contains quality-related settings that control how a material is handled in Quality Management processes. These settings include inspection types (e.g., goods receipt, in-process, delivery), quality control keys, certificate requirements, preferred inspection plans or material specifications, and the status of quality management activation for the material. Maintaining the QM View ensures that materials are consistently subjected to the correct inspection processes during procurement, production, and sales.
In SAP S/4HANA, the structure and usage of the Material Master QM View remain consistent with SAP ECC. The QM View is defined by material (MARA-MATNR), plant (MARC-WERKS), and the associated quality-related fields. These include inspection setup (QMAT), inspection types (QMAT-ART), active status, and assignment of task lists or material specifications.
In SAP ECC, aside from the standard fields, additional legacy configurations may exist, such as:
- Materials with inactive or obsolete inspection types still marked in the QM View.
- Materials assigned to inspection types without corresponding inspection plans or specifications.
- Redundant or duplicate plant-level QM settings for the same material.
- Materials with blocked or obsolete quality control keys.
These cases will need to be validated and cleansed as part of the Master Data Services (MDS) process prior to migration.
This conversion aims to migrate active and relevant Material Master QM View data from existing ECC systems into S/4HANA by applying the required transformation logic using Syniti as the data migration and transformation platform. The converted records will be loaded into the target S/4HANA system using standard SAP mechanisms such as BAPIs (e.g., BAPI_OBJCL_CREATE or BAPI_MATERIAL_SAVEDATA), IDOCs, or direct table loads where applicable, ensuring that all materials in scope have consistent and accurate QM-related setup in the target system.
Conversion Scope
The scope of this document covers the approach for converting active Material Master – QM View data from Legacy Source Systems into S/4HANA following the Material Master QM View Design Standard.
From the current system landscape, Material Master QM View data exists separately in the legacy systems (PF2 and WP2), with potential discrepancies in both systems. Harmonization and validation are required to ensure accurate and consolidated data in S/4HANA. While PF2 and WP2 serve as source systems, extensive mapping and transformation logic will be necessary to produce properly formatted load templates in line with the target design.
The data from legacy system includes: Final relevancy rule pending MDS
Active Material Master QM Views that are in use within the last three (3) years in inspection lots, quality certificates, or inspection plans.
QM Views without Deletion Flag, i.e., not blocked or obsolete.
QM Views assigned to plants that are in-scope for S/4HANA migration, based on the To-Be Plant Mapping.
Materials with at least one valid inspection type (e.g., 01, 04, 09) configured and active in the QM View.
Materials where control key, inspection setup, and certificate requirements are consistent with S/4HANA target design.
The data from legacy system excludes:
Inactive QM Views for materials not used in inspection lots or quality processes for more than three (3) years.
QM Views marked for deletion or with inspection types blocked in ECC.
QM Views belonging to plants that are out of scope or deleted as per To-Be Plant Mapping.
Obsolete inspection types or settings that are not supported in S/4HANA.
Duplicate or conflicting QM Views for the same material/plant combination, where only one harmonized record should remain.
List of source systems and approximate number of records
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
PF2/WP2 | Material Master QM views will be extracted from source systems. An initial extract of the relevant data will be provided in Google Sheet format to assist business in decision making on including any relevant data from Source Systems. | 500,000 | S4 HANA | 400,000 After cleansing |
Additional Information
Multi-language Requirement
Not applicable
Document Management
Not applicable
Legal Requirement
Not applicable
Special Requirements
Not applicable
Target Design
The technical design of the target for this conversion approach.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
Data Cleansing
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
Conversion Process
The high-level process is represented by the diagram below:
Data Privacy and Sensitivity
Extraction
Extract data from a source into . There are 2 possibilities:
- The data exists. connects to the source and loads the data into . There are 3 methods:
- Perform full data extraction from relevant tables in the source system(s).
- Perform extraction through the application layer.
- Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
- The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
Extraction Run Sheet
| Req # | Requirement Description | Team Responsible |
|---|---|---|
Selection Screen
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
Data Collection Template (DCT)
Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.DCT Rules
| Field Name | Field Description | Rule |
|---|---|---|
Extraction Dependencies
| Item # | Step Description | Team Responsible |
|---|---|---|
Transformation
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:
- Perform value mapping and data transformation rules.
- Legacy values are mapped to the to-be values (this could include a default value)
- Values are transformed according to the rules defined in
- Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation
Transformation Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
Transformation Mapping
| Mapping Table Name | Mapping Table Description |
|---|---|
Transformation Dependencies
List the steps that need to occur before transformation can commence| Item # | Step Description | Team Responsible |
|---|---|---|
Pre-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Business
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Load
The load process includes:
- Execute the automated data load into target system using load tool or product the load file if the load must be done manually
- Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation
Load Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
Load Phase and Dependencies
Configuration
| Item # | Configuration Item |
|---|---|
Conversion Objects
| Object # | Preceding Object Conversion Approach |
|---|---|
| list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram) | |
Error Handling
| Error Type | Error Description | Action Taken |
|---|---|---|
Post-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Business
Completeness
| Task | Action |
|---|---|
Accuracy
| Task | Action |
|---|---|
Key Assumptions
- Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
- is in scope based on data design and any exception requested by business.