You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 12 Next »

Status

  Revision in Progress

Owner
Stakeholders

Purpose

The purpose of this document is to define the conversion approach to create Material Master-General Plant Data / S.Loc Data in S/4 HANA.

The General Plant Data/Storage view is one of the key views in the Material Master. It contains information about a material that is specific to a particular plant and storage location. This view is essential for plant-level operations and inventory management. Currently, in both ECC systems PF2 and WP2, materials are extended to specific plants and their respective storage locations. Source and Target structures mapping are provided below.

Conversion Scope

The scope of this document covers the approach for converting active Material Master-General Plant Data / S.Loc Data from Legacy Source Systems into S/4HANA following the DD-FUN-050 Master Data Standard - Material General Plant and Storage Data Master Data Design Standard.

As per KDD011 - Material Master Numbering Alignment All Syensqo's materials (finished, semi-finished, raw materials, spares etc.) will be represented by a unique material master number which will be assigned from a new number range


The data from legacy system includes:

  1. Materials which are created from Past 3 Years
  2. Materials with Maintenance Status (MARA-PSTAT = L)
  3. Materials without Deletion Flag (MARC-LVORM = NO)
  4. Materials with Plant Specific Status (MMSTA=NULL)

The data from legacy system excludes:

  1. To Be Confirmed
List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2

The Material Master Records will be extracted/collected via DCT. An initial extract of the relevant data will be provided in Google Sheet format to assist business in decision making on including any relevant data from Source Systems.

1.2 Million  (Depending on Plant consolidation)S4HTBC depending on Plant Consolidation
WP2

The Material Master Records will be extracted/collected via DCT. An initial extract of the relevant data will be provided in Google Sheet format to assist business in decision making on including any relevant data from Source Systems.

1.2 Million (Depending on Plant consolidation)S4HConsolidation










Additional Information

Multi-language Requirement

As per KDD055 - Multi-Language Support there are 8 languages in scope: English, French, Italian and Mandarin and Brazilian Portuguese, German, Spanish and Thai.

Legacy text for applicable records at Plant level are in-scope for Migration to support system functionalities (If anything is getting printed on output documents then the Text would be in scope



Language KeyInternational VersionLanguage description

Notes

ENEEnglish
FRFFrench
ITIItalian
ZH1Mandarin
??Brazilian PortugueseLanguage key for Brazilian Portuguese need to be confirmed by functional team
DEDGerman
ESSSpanish
TH2Thai

Document Management

Not applicable

Legal Requirement

Not applicable

Special Requirements

Not applicable




Target Design

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthZDIRZINDHERSIBAUNLAGPIPEUNBWVERPZLEIZLEHZLERZABFZSER
MARCAUSMEUnit of issueCHAR18CCN/AN/AN/AN/ACN/ACCCCC
MARDLGPBELGPBEStorage BinCHAR10CCN/AN/AN/AN/ACN/ACCCCC
MARDLWMKB

MARD_KOBER

Picking AreaCHAR3N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARA TEMPBTEMPBTemp. ConditionsCHAR2N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARA RAUBERAUBEStorage conditionsCHAR2R
N/AN/A
N/A
N/ARRRRR
MARA BEHVOBEHVOContainer reqmtsCHAR2N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARA STOFFSTOFFHaz.material numberCHAR18N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARCABCINABCINCC phys. inv. ind.CHAR1RRN/AN/AN/AN/ARN/ARRRRR
MARCCCFIXCCFIXCC fixedCHAR1RRN/AN/AN/AN/ARN/ARRRRR
MARA WESCHWESCHNumber of GR slipsQUAN13(3dec)N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARA ETIARETIARLabel typeCHAR2N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARA ETIFOETIFOLab.formCHAR2N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARA XGCHPXGCHPAppr.batch rec. req.CHAR1N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARAXCHPFXCHPFBatch ManagementCHAR1CN/AN/AN/AN/AN/AN/AN/ACCCCC
MARCXCHPFXCHPFBatch Management (Plant)CHAR1CN/AN/AN/AN/AN/AN/AN/ACCCCC
MARCMAXLZMAXLZMax. Storage PeriodDEC5N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARCLZEIHLZEIHTime UnitUNIT3N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARA MHDRZMHDRZMin. Rem. Shelf LifeDEC4CN/AN/AN/AN/AN/AN/AN/ACCCCC
MARA MHDHBMHDHBTotal shelf lifeDEC4CN/AN/AN/AN/AN/AN/AN/ACCCCC
MARA IPRKZDATTPPeriod Ind. for SLEDCHAR1CN/AN/AN/AN/AN/AN/AN/ACCCCC
MARA RDMHDRDMHDRounding rule SLEDCHAR1
N/AN/AN/AN/AN/AN/AN/A




MARA MHDLPMHDLPStorage percentageDEC3N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARASLED_BBDSLED_BBDExpiration DateCHAR1RN/AN/AN/AN/AN/AN/AN/ARRRRR
MARASCM_MATURITY_DUR/SAPAPO/MATURITY_DURMaturation TimeDEC11N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARASCM_SHLF_LFE_REQ_MAX/SAPAPO/SHELF_LIFE_REQ_MAXRequired Maximum Shelf LifeDEC11N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARCSGT_COVSSGT_COVSSegmentation StrategyCHAR8N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARCSGT_DEFSCSGT_DEFSCLogistics handling group for workload calculationCHAR40N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARCXMCNGXMCNGNegative stocks allowed in plantCHAR1N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARCLOGGRLOGGRLogistics handling group for workload calculationCHAR4N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARCSERNPSERAILSerial Number ProfileStock determination group4CN/AN/AN/AN/AN/AN/AN/ACCCCC
MARA SERLVSERLVLevel of Explicitness for Serial NumberCHAR1CN/AN/AN/AN/AN/AN/AN/ACCCCC
MARCFPRFMFPRFMDistribution profile of material in plantCHAR3N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARCPRCTRPRCTRProfit CenterCHAR10RequiredN/AN/AN/AN/AN/AN/AN/ARequiredRequiredRequiredRequiredRequired
MARCEPRIOBF_GROUPStock determination groupCHAR4CN/AN/AN/AN/AN/AN/AN/ACCCCC
MARCIUID_RELEVANTIUID_RELEVANTIUID-RelevantCHAR1N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARCUID_IEAUID_IEAExternal Allocation of UIICHAR1N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
MARCIUID_TYPEIUID_TYPEStructure Type of UIICHAR10N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A


Data Cleansing

IDCriticalityError Message/Report DescriptionRuleOutputSource System



As a part of this option, the material masters are de-duplicated, and one material master is created per valid material. The material numbers are automatically assigned by the system and are sequential with no intelligence





















Conversion Process

The high-level process is represented by the diagram below:


Data Privacy and Sensitivity


Extraction

Extract data from a source into . There are 2 possibilities:

  1. The data exists. connects to the source and loads the data into . There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible
1) Screen Records against MARA -ERSA to get the materials created in the last 3 yearsSynity
2) Screen Records against Maintenance Status MARA -PSTAT ='L'Synity
3)Screen Records against  plant specific Deletion Flag in MARC-LVORM ='NO'Synity
4)Screen Records against Plant Status where MMSTA is NullSynity


Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set
N/A



















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.

DCT Rules

Field NameField DescriptionRule
TBC method for Material deduplication (KD011) If xref will be used to map old/new









Extraction Dependencies

Item #Step DescriptionTeam Responsible
1)Collect needs to happen for Both MARA &MARC tables before ST* can be populated.Synity
2) Connection needs to be setup with the correct authorisation for extractSynity
3)Possible Scheduling of snapshot as MARC tables are generally big and may take some timeSynity
3)Plant/ Storage location design/consolidation needs to be finalised Business/Functionals


Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible

Transformation Rules to be determined










Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
001PF2/WG2MARCAUSMEUnit of issueS4/ HanaMARCAUSMEUnit of issueCopy from Source to target system
002PF2/WG2MARDLGPBEStorage BinS4/ HanaMARDLGPBEStorage BinCopy from Source to target system
003PF2/WG2MARDLWMKBPicking AreaS4/ HanaMARDLWMKBPicking AreaCopy from Source to target system
004PF2/WG2MARA TEMPBTemp. ConditionsS4/ HanaMARA TEMPBTemp. ConditionsCopy from Source to target system
005PF2/WG2MARA RAUBEStorage conditionsS4/ HanaMARA RAUBEStorage conditionsCopy from Source to target system
006PF2/WG2MARA BEHVOContainer reqmtsS4/ HanaMARA BEHVOContainer reqmtsCopy from Source to target system
007PF2/WG2MARA STOFFHaz.material numberS4/ HanaMARA STOFFHaz.material numberCopy from Source to target system
008PF2/WG2MARCABCINCC phys. inv. ind.S4/ HanaMARCABCINCC phys. inv. ind.Copy from Source to target system
009PF2/WG2MARCCCFIXCC fixedS4/ HanaMARCCCFIXCC fixedCopy from Source to target system
010PF2/WG2MARA WESCHNumber of GR slipsS4/ HanaMARA WESCHNumber of GR slipsCopy from Source to target system
011PF2/WG2MARA ETIARLabel typeS4/ HanaMARA ETIARLabel typeCopy from Source to target system
012PF2/WG2MARA ETIFOLab.formS4/ HanaMARA ETIFOLab.formCopy from Source to target system
013PF2/WG2MARA XGCHPAppr.batch rec. req.S4/ HanaMARA XGCHPAppr.batch rec. req.Copy from Source to target system
014PF2/WG2MARAXCHPFBatch ManagementS4/ HanaMARAXCHPFBatch ManagementCopy from Source to target system
015PF2/WG2MARCXCHPFBatch Management (Plant)S4/ HanaMARCXCHPFBatch Management (Plant)Copy from Source to target system
016PF2/WG2MARCMAXLZMax. Storage PeriodS4/ HanaMARCMAXLZMax. Storage PeriodCopy from Source to target system
017PF2/WG2MARCLZEIHTime UnitS4/ HanaMARCLZEIHTime UnitCopy from Source to target system
018PF2/WG2MARA MHDRZMin. Rem. Shelf LifeS4/ HanaMARA MHDRZMin. Rem. Shelf LifeCopy from Source to target system
019PF2/WG2MARA MHDHBTotal shelf lifeS4/ HanaMARA MHDHBTotal shelf lifeCopy from Source to target system
020PF2/WG2MARA IPRKZPeriod Ind. for SLEDS4/ HanaMARA IPRKZPeriod Ind. for SLEDCopy from Source to target system
021PF2/WG2MARA RDMHDRounding rule SLEDS4/ HanaMARA RDMHDRounding rule SLEDCopy from Source to target system
022PF2/WG2MARA MHDLPStorage percentageS4/ HanaMARA MHDLPStorage percentageCopy from Source to target system
023PF2/WG2MARASLED_BBDExpiration DateS4/ HanaMARASLED_BBDExpiration DateCopy from Source to target system
024PF2/WG2MARASCM_MATURITY_DURMaturation TimeS4/ HanaMARASCM_MATURITY_DURMaturation TimeCopy from Source to target system
025PF2/WG2MARASCM_SHLF_LFE_REQ_MAXRequired Maximum Shelf LifeS4/ HanaMARASCM_SHLF_LFE_REQ_MAXRequired Maximum Shelf LifeCopy from Source to target system
026PF2/WG2MARCSGT_COVSSegmentation StrategyS4/ HanaMARCSGT_COVSSegmentation StrategyCopy from Source to target system
027PF2/WG2MARCSGT_DEFSCLogistics handling group for workload calculationS4/ HanaMARCSGT_DEFSCLogistics handling group for workload calculationCopy from Source to target system
028PF2/WG2MARCXMCNGNegative stocks allowed in plantS4/ HanaMARCXMCNGNegative stocks allowed in plantCopy from Source to target system
029PF2/WG2MARCLOGGRLogistics handling group for workload calculationS4/ HanaMARCLOGGRLogistics handling group for workload calculationCopy from Source to target system
030PF2/WG2MARCSERNPSerial Number ProfileS4/ HanaMARCSERNPSerial Number ProfileCopy from Source to target system
031PF2/WG2MARA SERLVLevel of Explicitness for Serial NumberS4/ HanaMARA SERLVLevel of Explicitness for Serial NumberCopy from Source to target system
032PF2/WG2MARCFPRFMDistribution profile of material in plantS4/ HanaMARCFPRFMDistribution profile of material in plantCopy from Source to target system
033PF2/WG2MARCPRCTRProfit CenterS4/ HanaMARCPRCTRProfit CenterCopy from Source to target system
034PF2/WG2MARCEPRIOStock determination groupS4/ HanaMARCEPRIOStock determination groupCopy from Source to target system
035PF2/WG2MARCIUID_RELEVANTIUID-RelevantS4/ HanaMARCIUID_RELEVANTIUID-RelevantCopy from Source to target system
036PF2/WG2MARCUID_IEAExternal Allocation of UIIS4/ HanaMARCUID_IEAExternal Allocation of UIICopy from Source to target system
037PF2/WG2MARCIUID_TYPEStructure Type of UIIS4/ HanaMARCIUID_TYPEStructure Type of UIICopy from Source to target system


Transformation Mapping

Mapping Table NameMapping Table Description
Transformation Rules to be determined






Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible
Transformation Rules to be determined

1)In General MARC records should be screened against MARA Target Table to ensure only Records that pass Validation in Header filters down to Plant view.Synity
2)Check Tables for fields are up to date & complete




Pre-Load Validation

Project Team

Completeness

TaskAction
Verify Record CountsRow counts in PREP (Relevancy) should tie back to Count in Target Table





Accuracy

TaskAction
Conversion Accuracy

SyWay P2F Data Team to verify that all fields pass the following checks:

  1. All Mandatory Fields filled out
  2. Field and Value Mapping Complete and correct. 
  3. Nulls need to be verified 
  4. Field Lengths and data types should be compatible with upload Template
Review Error ReportsFields that fail checks due to Target Readiness etc. should be highlighted in error reports. These reports need to be flagged & decision can be made to Remediate values in initial Mock cycles but no remediation should be applied when doing final dress rehearsal.



Business

Completeness

TaskAction
Verify Record CountsBusiness Data Owner/s to verify that the total number of relevant records from the the Relevancy Reports is equal to the total number of records in the Preload and Load Sheets.





Accuracy

TaskAction
Conversion AccuracyBusiness Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data).





Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible
1.Go to Load tool (Migrate your Data)
2.Run Simulation & validate if any Errors are encountered
3.If No errors encountered proceed with Prepare & simulate
4.Once Approval has been given proceed with Migration
5.Any Migration Errors need to be highlighted & and depending on volume & criticality of Mock cycle either be fixed & reloaded or Marked for correcting in subsequent Mocks
6.

Generate all Post-load Reports with summary information with counts that clearly show :

  1. To be loaded Count (In Target Table)
  2. Loaded
  3. Failures with meaningful error descriptions

7.

Check a sample of a few materials in S/4 HANA


8. 

Garner validations/signoffs.



Load Phase and Dependencies

Configuration

Item #Configuration Item






Conversion Objects

Object #Preceding Object Conversion Approach

list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram)




Error Handling

Error TypeError DescriptionAction Taken










Post-Load Validation

Project Team

Completeness

TaskAction
Verify CountSyWay P2FData Team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA





Accuracy

TaskAction
Verify LogsCheck if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.).





Business

Completeness

TaskAction
Verify CountDownload Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file.





Accuracy

TaskAction
Conversion AccuracyVerify that the Material data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA.





Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • is in scope based on data design and any exception requested by business.


See also

Change log

Version Published Changed By Comment
CURRENT (v. 12) Apr 16, 2026 11:03 VAN NIEKERK-ext, ivan
v. 24 Apr 16, 2026 11:01 VAN NIEKERK-ext, ivan
v. 23 Jan 13, 2026 12:18 VAN NIEKERK-ext, ivan
v. 22 Jan 13, 2026 12:16 VAN NIEKERK-ext, ivan
v. 21 Dec 08, 2025 14:52 VAN NIEKERK-ext, ivan Added DCT as per CR0209
v. 20 Nov 20, 2025 08:17 VAN NIEKERK-ext, ivan
v. 19 Nov 20, 2025 08:12 VAN NIEKERK-ext, ivan Serial Number Profile Updated
v. 18 Oct 23, 2025 11:50 VAN NIEKERK-ext, ivan Updated PSTAT
v. 17 Oct 17, 2025 13:41 VAN NIEKERK-ext, ivan Removed MMSTA NULL
v. 16 Oct 16, 2025 16:34 VAN NIEKERK-ext, ivan Added Material Types to Relevancy as per Matrix

Go to Page History

  • No labels