Purpose

The purpose of this document is to define the conversion approach to create EAM Work Centres in S/4 HANA.

Legacy Work Centre is using a diverse range of formats across the different systems. There may be instances where the same Work Centres are duplicated within and across sources. This results in data inconsistency. As per SyWay design, EAM Work Centres will be standardized.


Conversion Scope

The scope of this document outlines the approach for converting active Work Centres from the legacy systems (PF2, WP2) and for creating new Work Centres in S/4HANA, in alignment with the SyWay Work Centre Master Data Design Standard.

A Work Centre is an organizational element that identifies the resource - whether a person, machine, or group - responsible for performing maintenance activities. Each Work Centre has a defined capacity to perform work, and the activities carried out can be costed by assigning activity rates.

Main Work Centre

Main Work Centres define the execution and organizational ownership of work management objects such as Notifications, Work Orders and Maintenance Plans within a Maintenance Plant.

They represent the work group team leaders or supervisors who organize and manage the maintenance workforce on a day-to-day basis. This includes coordinating both planned maintenance and unplanned breakdown work and effectively merging the two based on daily priorities and resource availability.

Work Centre Category Consideration

Work Centres are distinguished by their Work Centre category (e.g. Production Work Centre or Maintenance Work Centre). The category selected determines which data fields can be maintained in the Work Centre master record.

For Plant Maintenance purposes, the default Work Centre category will be Maintenance Work Centre. 

Within the Work Centre master data, the Work Centre category is used to identify it as a Plant Maintenance Work Centre. Additionally, a Control Key is maintained to specify the business transactions (i.e. such as scheduling or costing) that are applicable to the Work Centre when used in maintenance task lists or maintenance orders.

The data from legacy system includes:

  1. Object Type (CRHD-OBTY) = A (Work Centre)
  2. Work Centres (CRHD-ARPBL) within Maintenance Plants (CRHD-WERKS) in scope (Value Mapping: Plant where Maintenance Plant = Yes)
  3. Work Centres (CRHD-ARPBL) assigned to any of the below PM Objects in the Legacy Systems:
    1. Active Legacy Functional Location (IFLOT-TPLR) ** (System Status TJ02T-TXT04 <> INAC)
    2. Active Legacy Equipment (EQUI-EQUNR) ** (System Status TJ02T-TXT04 <> INAC)
    3. Active Legacy Task List
      • Task List Type (PLKO-PLNTY) can be any of: A - General Maintenance Task List; E - Equipment Task List; T - Task List for Functional Location
      • Task List Status (PLKO-STATU) can be any of: 2 - Released for Order; 3 - Released for Costing; 4 - Released (General)
      • Task List Usage (PLKO-VERWE) = "004"
    4. Legacy Maintenance Items (MPOS-WAPOS) linked to Active Legacy Functional Location **
    5. Legacy Maintenance Items (MPOS-WAPOS) linked to Active Legacy Equipment **
    6. Open Legacy Work Orders (AUFK-AUFNR)

The data from legacy system excludes:

  1. Work Centre for Deletion (Deletion Indicator (CRHD-LVORM) = "X")

List of Tables to extract for this object is maintained here: Extract Table Register.


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2, WP2

Work Centres will be collected via DCT. An initial extract of the relevant Work Centres will be provided in google sheet format to assist business in decision making on including any relevant classes from PF2 and WP2 as EAM Work Centres.

Any additional Work Centres that need to be created to support the new design may be added in the DCT.

A review and standardization will be done across all classes in the DCT. 

Please see an indication of what will be baselined from source systems below and what will be constructed in the DCT. 

Note: A full Data Construct will be created for Work Centre, as the SyWay design is changing and a complete standardization will be performed. While data may already exist, it cannot be easily transformed to align with the new SyWay data setup.

4,500
2,000

Additional Information

Multi-language Requirement

EAM Work Centre description will be made available in English.
Multi language is supported for EAM Work Centre. Login via a different language will have its description displayed in the logon language if the language key is maintained in the Work Centre.

Document Management

Not Applicable

Legal Requirement

Not Applicable

Special Requirements

Not Applicable


Target Design

The technical design of the target for this conversion approach.

1. Work Centre Header

TableFieldData ElementField DescriptionData TypeLengthRequirement
CRHDWERKSWERKS_DPlantCHAR4Mandatory
CRHDARBPLARBPLWork CentreCHAR8Mandatory
CRHDVERWEAP_VERWEWork Centre CategoryCHAR4Mandatory
CRHDVERANAP_VERANPerson ResponsibleCHAR3Conditional
CRHDPLANVAP_PLANVUsageCHAR3Mandatory
CRHDVGWTSVORGSCHLStandard Value KeyCHAR4Mandatory
CRHDSTEUSSTEUSControl KeyCHAR4Mandatory
CRHDSTEUS_REFSTEUS_REFRef Ind for Control KeyCHAR1Mandatory
CRHDPDESTCR_PDESTPrinterCHAR4Mandatory
CRHDFORTNAP_FORM_TNInt. Proc. DurationCHAR6Mandatory

2. Work Centre Description

TableFieldData ElementField DescriptionData TypeLengthRequirement
CRHDARBPLARBPLWork CentreCHAR8Mandatory
CRTXKTEXTCR_KTEXTWork Centre DescriptionCHAR40Mandatory
CRTXSPRASSPRASLanguage KeyLANG1Mandatory

Note: Each Work Centre Description must include one entry in English and one entry in the language of the country where the plant is located.

3. Work Centre Capacity

TableFieldData ElementField DescriptionData TypeLengthRequirement
CRHDARBPLARBPLWork CentreCHAR8Mandatory
CRCAFORKNAP_FORM_KNOther Formula (Capacity)CHAR6Mandatory
KAKOKAPARKAPARTCapacity CategoryCHAR3Mandatory
KAKOPLANRKAPPLANERCapacity ResponsibleCHAR3Mandatory
KAKOKALIDCR_WFCIDFactory CalendarCHAR2Mandatory
KAKOVERSAKAPVERSAKTActive VersionNUMC2Mandatory
KAKOMEINSKAPBASISCapacity Base UnitUNIT3Mandatory
KAKOBEGZTKAPBEGZTStart TimeINT410Mandatory
KAKOENDZTKAPENDZTEnd TimeINT410Mandatory
KAKOPAUSEKAPPAUSELength of breaksINT410Mandatory
KAKONGRADNUTZGRADCapacity UtilizationNUMC3Mandatory
KAKOAZNORKAPANZAHLNo. Ind. CapacitiesINT25Mandatory
KAKOKAPEHCR_KAPEHCapacity Unit of MeasureUNIT3Mandatory
KAKOKAPAVOKAP_KZAVOSeveral operations can use capacityCHAR1Mandatory
KAKOKAPLPLKAP_KZLPLLong-term planning takes capacity into accountCHAR1Mandatory

Note: Each Work Centre must have a corresponding Work Centre Capacity Entry

4. Work Centre Cost Center

TableFieldData ElementField DescriptionData TypeLengthRequirement
CRHDARBPLARBPLWork CentreCHAR8

Mandatory

(When Control Key = PM01)

CRCOKOSTLKOSTLCost CentreCHAR10

Mandatory

(When Control Key = PM01)

CRCOLSTARLSTARActivity TypeCHAR6

Mandatory

(When Control Key = PM01)

CRCOFORMLAP_FORM_C1Formula (Costing)CHAR6

Mandatory

(When Control Key = PM01)

Note: Each Work Centre must have a corresponding Cost Center, Activity Type and Formula (Costing) entries if Work Centre Control Key = PM01

Work Centre Data strictly adheres to the Master Data Standard. The complete information of the key fields that hold the Work Centre information follows the Master Data Standard document that is located here.


Data Cleansing

No data cleansing is required for Work Centre in the legacy systems. If any cleansing is deemed necessary, it will be performed outside of the system.

As a result, the cleansed Work Centre data will be populated directly in the Data Collection Template (DCT).

IDCriticalityError Message/Report DescriptionRuleOutputSource System


Not Applicable



Conversion Process

The high-level process is represented by the diagram below:

Collection will be done manually in the Data Collection Template for the following scenarios:

  • For sites not on SAP-PF2 or WP2 systems
  • For new PM Work Centres that need to be created to support the to-be design

Data Privacy and Sensitivity

Not Applicable


Extraction

Extract data from a source into Syniti Migrate. There are 2 possibilities:

  1. The data exists. Syniti Migrate connects to the source and loads the data into  Syniti Migrate. There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if  Syniti Migrate; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in Syniti Migrate. This is to be conducted using DCT (Data Collection Template) in Syniti Migrate

The agreed Relevancy criteria is applied to the extracted records as reference point to identify the records that are applicable for the data construction in the DCT.

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible
1Extract data from source system based on relevancy ruleSyWay Data Team
2Google Sheet report pre-populated with PF2 and WP2 information to be generated based on relevancy criteria. SyWay Data Team

Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set
Not Applicable



Data Collection Template (DCT)

Target Ready Data Collection Template will be created for EAM Work Centre data with exception of some fields which require transformation as mentioned in the transformation rule.

  1. The extracted report will be loaded into the required structure using the DCT.
  2. Standardization activities (including deduplication, standardization and additions)  will be carried out within the DCT.

Delta Data Management: Initial collection will be done via the report and one-time load to the DCT will be performed. Any delta after the initial collection within the DCT will require business to take due diligence to ensure any subsequent delta cleansing is verified and aligned within the DCT.

Note: All rules specified below should be documented as a tooltip in the DC Page.

Format:

  • Line 1: Mandatory / Conditional
  • Line 2: Remaining text

1. Work Centre Data Construction Rules

Field NameField DescriptionRule
WERKSPlant

Mandatory.

Allowed values: List from Value Mapping - Plant where Maintenance Plant = Yes

ARBPLWork Centre

Mandatory.

The naming convention for Work Centres will follow the structure:

Internal Work Centre format: SXXXXNNN
S = Syensqo
XXXX = Discipline: Indicates the type of work (e.g. MECH for Mechanical, ELEC for Electrical)
NNN = A three-digit sequential number (e.g. 001, 002, 003) to ensure uniqueness and allow multiple Work Centres within the same plant/discipline/function grouping.

External Work Centre format: EXXXXNNN
E = External Resource (Contractor)
XXXX = Discipline: Indicates the type of work (e.g. MECH for Mechanical, ELEC for Electrical)
NNN = A three-digit sequential number (e.g. 001, 002, 003) to ensure uniqueness and allow multiple Work Centres within the same plant/discipline/function grouping.

T = Tools and Equipment 
XXXX = T&E Type: Indicates the type of tool or equipment (e.g. CRNE for Crane, FKLT for Forklift)
NNN = A three-digit sequential number (e.g. 001, 002, 003) to ensure uniqueness and allow multiple Work Centres within the same plant/discipline/function grouping.

VERANPerson Responsible

Conditional.

  • Must be a valid Person Responsible
  • Needs to be selected from value list (TC24)
  • Select supervisor who manages the performing Work Centre. Otherwise, leave the field blank.
PDEST

Printer

Mandatory.

  • Must be a valid Printer (TSP03)
KTEXT_ENWork Centre Description (English)

Mandatory.

Ensure that this Description is in English.

Ensure that it does not include any of below characters: 
;        Semi-colon
:        Colon
::        Double Colon
?        Question Mark
/        Forward Slash
@        At sign
&        Ampersand
=        Equal Sign
+        Plus Sign
$        Dollar Sign
%        Percent
|        Vertical Bar
[]        Left or Right Square Bracket
"        Double Quotes

KTEXT_FRWork Centre Description (French)

Conditional (Required only if the language of the country where the plant is located is French).

Ensure that this Description is in French.

Ensure that it does not include any of below characters: 
;        Semi-colon
:        Colon
::        Double Colon
?        Question Mark
/        Forward Slash
@        At sign
&        Ampersand
=        Equal Sign
+        Plus Sign
$        Dollar Sign
%        Percent
|        Vertical Bar
[]        Left or Right Square Bracket
"        Double Quotes

KTEXT_ITWork Centre Description (Italian)

Conditional (Required only if the language of the country where the plant is located is Italian).

Ensure that this Description is in Italian.

Ensure that it does not include any of below characters: 
;        Semi-colon
:        Colon
::        Double Colon
?        Question Mark
/        Forward Slash
@        At sign
&        Ampersand
=        Equal Sign
+        Plus Sign
$        Dollar Sign
%        Percent
|        Vertical Bar
[]        Left or Right Square Bracket
"        Double Quotes

KTEXT_ZHWork Centre Description (Mandarin)

Conditional (Required only if the language of the country where the plant is located is Mandarin).

Ensure that this Description is in Mandarin.

Ensure that it does not include any of below characters: 
;        Semi-colon
:        Colon
::        Double Colon
?        Question Mark
/        Forward Slash
@        At sign
&        Ampersand
=        Equal Sign
+        Plus Sign
$        Dollar Sign
%        Percent
|        Vertical Bar
[]        Left or Right Square Bracket
"        Double Quotes

KTEXT_PTWork Centre Description (Brazilian Portuguese)

Conditional (Required only if the language of the country where the plant is located is Portuguese).

Ensure that this Description is in Portuguese.

Ensure that it does not include any of below characters: 
;        Semi-colon
:        Colon
::        Double Colon
?        Question Mark
/        Forward Slash
@        At sign
&        Ampersand
=        Equal Sign
+        Plus Sign
$        Dollar Sign
%        Percent
|        Vertical Bar
[]        Left or Right Square Bracket
"        Double Quotes

KTEXT_DEWork Centre Description (German)

Conditional (Required only if the language of the country where the plant is located is German).

Ensure that this Description is in German.

Ensure that it does not include any of below characters: 
;        Semi-colon
:        Colon
::        Double Colon
?        Question Mark
/        Forward Slash
@        At sign
&        Ampersand
=        Equal Sign
+        Plus Sign
$        Dollar Sign
%        Percent
|        Vertical Bar
[]        Left or Right Square Bracket
"        Double Quotes

KTEXT_ESWork Centre Description (Spanish)

Conditional (Required only if the language of the country where the plant is located is Spanish).

Ensure that this Description is in Spanish.

Ensure that it does not include any of below characters: 
;        Semi-colon
:        Colon
::        Double Colon
?        Question Mark
/        Forward Slash
@        At sign
&        Ampersand
=        Equal Sign
+        Plus Sign
$        Dollar Sign
%        Percent
|        Vertical Bar
[]        Left or Right Square Bracket
"        Double Quotes

KALIDFactory Calendar

Mandatory.

  • Must be a valid Factory Calendar
  • Needs to be selected from value list (TFACD).
    The factory calendar must correspond to the geographical location of the plant linked to the work centre
BEGZTStart Time

Mandatory.

  • Must follow time format "HH:MM:SS"
ENDZTEnd Time

Mandatory.

  • Must follow time format "HH:MM:SS"
PAUSELength of breaks

Mandatory.

  • Must follow time format "HH:MM:SS"
AZNORNo. Ind. Capacities

Mandatory.

  • Must be an integer value
KOSTLCost Centre

Conditional.

If Work Centre begins with "S", populate with relevant Cost Centre.  
Otherwise, leave the field blank.

LSTARActivity Type

Conditional.

If Work Centre begins with "S", populate with relevant Activity Type.  
Otherwise, leave the field blank.

FORMLFormula (Costing)

Conditional.

If Work Centre begins with "S", populate with Costing Formula from the value list (TC25).  
Otherwise, leave the field blank.

Note: List of DCTs is maintained here: Conversion Specs Register (DCT & Cleansing Report).

Extraction Dependencies

Item #Step DescriptionTeam Responsible

Not Applicable


Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible

1

Obtain DCT Sign-off from Business.

SyWay Data Team

2

In dspMigrate, select the wave – S4/HANA – Plant Maintenance

Syniti

3

Go to Process Area Launch and Process the Object – Work Centre

Syniti

4

Review and Validate Error and Preload Reports

Syniti

5

Execute the transformation to prepare the target tables

Syniti

6

Validate data from pre-load and error reports

Business/Data owner

7

Generate load files

Syniti


Transformation Rules

1. Work Centre Header

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1DCTCRHDWERKSPlantS/4 HanaCRHDWERKSPlantDirect Mapping
2DCTCRHDARBPLWork CentreS/4 HanaCRHDARBPLWork CentreDirect Mapping
3----S/4 HanaCRHDVERWEWork Centre CategoryDefault to "0005"
4DCTCRHDVERANPerson ResponsibleS/4 HanaCRHDVERANPerson ResponsibleDirect Mapping
5----S/4 HanaCRHDPLANVUsageDefault to "004"
6----S/4 HanaCRHDVGWTSStandard Value KeyDefault to "SAP0"
7----S/4 HanaCRHDSTEUSControl Key
  • If Work Centre begins with "S", set to "PM01".
  • If Work Centre begins with "E", set to "PM02"
  • If Work Centre begins with "T", set to "PM04"
8----S/4 HanaCRHDSTEUS_REFRef Ind for Control KeyDefault to " " (Unchecked)
9DCTCRHDPDESTPrinterS/4 HanaCRHDPDESTPrinterDirect Mapping
10----S/4 HanaCRHDFORTNInt. Proc. DurationDefault to "SAP004"

2. Work Centre Description

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1DCTCRHDARBPLWork CentreS/4 HanaCRHDARBPLWork CentreDirect Mapping
2DCTCRTXKTEXT_ENWork Centre Description (English)S/4 HanaCRTXKTEXTWork Centre DescriptionDirect Mapping
3----S/4 HanaCRTXSPRASLanguage KeyDefault to "E"

UNION

(Select Data where KTEXT_FR is populated in the DCT)

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1DCTCRHDARBPLWork CentreS/4 HanaCRHDARBPLWork CentreDirect Mapping
2DCTCRTXKTEXT_FRWork Centre Description (French)S/4 HanaCRTXKTEXTWork Centre DescriptionDirect Mapping
3----S/4 HanaCRTXSPRASLanguage KeyDefault to "F"

 UNION

(Select Data where KTEXT_IT is populated in the DCT)

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1DCTCRHDARBPLWork CentreS/4 HanaCRHDARBPLWork CentreDirect Mapping
2DCTCRTXKTEXT_ITWork Centre Description (Italian)S/4 HanaCRTXKTEXTWork Centre DescriptionDirect Mapping
3----S/4 HanaCRTXSPRASLanguage KeyDefault to "I"

 UNION

(Select Data where KTEXT_ZH is populated in the DCT)

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1DCTCRHDARBPLWork CentreS/4 HanaCRHDARBPLWork CentreDirect Mapping
2DCTCRTXKTEXT_ZHWork Centre Description (Mandarin)S/4 HanaCRTXKTEXTWork Centre DescriptionDirect Mapping
3----S/4 HanaCRTXSPRASLanguage KeyDefault to "1"

UNION

(Select Data where KTEXT_PT is populated in the DCT)

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1DCTCRHDARBPLWork CentreS/4 HanaCRHDARBPLWork CentreDirect Mapping
2DCTCRTXKTEXT_PTWork Centre Description (Brazilian Portuguese)S/4 HanaCRTXKTEXTWork Centre DescriptionDirect Mapping
3----S/4 HanaCRTXSPRASLanguage KeyDefault to "P"

UNION

(Select Data where KTEXT_DE is populated in the DCT)

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1DCTCRHDARBPLWork CentreS/4 HanaCRHDARBPLWork CentreDirect Mapping
2DCTCRTXKTEXT_DEWork Centre Description (German)S/4 HanaCRTXKTEXTWork Centre DescriptionDirect Mapping
3----S/4 HanaCRTXSPRASLanguage KeyDefault to "D"

UNION

(Select Data where KTEXT_ES is populated in the DCT)

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1DCTCRHDARBPLWork CentreS/4 HanaCRHDARBPLWork CentreDirect Mapping
2DCTCRTXKTEXT_ESWork Centre Description (Spanish)S/4 HanaCRTXKTEXTWork Centre DescriptionDirect Mapping
3----S/4 HanaCRTXSPRASLanguage KeyDefault to "S"

Note: Each Work Centre Description must include one entry in English and one entry in the language of the country where the plant is located.


3. Work Centre Capacity

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1DCTCRHDARBPLWork CentreS/4 HanaCRHDARBPLWork CentreDirect Mapping
2----S/4 HanaCRCAFORKNOther Formula (Capacity)

Default to "SAP008"

3----S/4 HanaKAKOKAPARCapacity CategoryDefault to "002"
4----S/4 HanaKAKOPLANRCapacity Responsible

Default to "PM"

5DCTKAKOKALIDFactory CalendarS/4 HanaKAKOKALIDFactory CalendarDirect Mapping
6----S/4 HanaKAKOVERSAActive Version

Default to "01"

7----S/4 HanaKAKOMEINSCapacity Base Unit

Default to "H"

8DCTKAKOBEGZTStart TimeS/4 HanaKAKOBEGZTStart Time

Direct Mapping

(Note: Front end Format is HH:MM:SS but needs to be stored in INT4 version in the backend table)

9DCTKAKOENDZTEnd TimeS/4 HanaKAKOENDZTEnd Time

Direct Mapping

(Note: Front end Format is HH:MM:SS but needs to be stored in INT4 version in the backend table)

10DCTKAKOPAUSELength of breaksS/4 HanaKAKOPAUSELength of breaks

Direct Mapping

(Note: Front end Format is HH:MM:SS but needs to be stored in INT4 version in the backend table)

11----S/4 HanaKAKONGRADCapacity Utilization

Default to "100"

12DCTKAKOAZNORNo. Ind. CapacitiesS/4 HanaKAKOAZNORNo. Ind. CapacitiesDirect Mapping
13----S/4 HanaKAKOKAPEHCapacity Unit of MeasureDefault to "H"
14----S/4 HanaKAKOKAPAVOSeveral operations can use capacity

Default to "X"

15----S/4 HanaKAKOKAPLPLLong-term planning takes capacity into accountDefault to "X"

Note: Each Work Centre must have a corresponding Work Centre Capacity Entry


4. Work Centre Cost Center

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1DCTCRHDARBPLWork CentreS/4 HanaCRHDARBPLWork CentreDirect Mapping
2DCTCRCOKOSTLCost CentreS/4 HanaCRCOKOSTLCost Centre

Value Mapping: Cost Centre

3DCTCRCOLSTARActivity TypeS/4 HanaCRCOLSTARActivity TypeValue Mapping: Activity Type
4DCTCRCOFORMLFormula (Costing)S/4 HanaCRCOFORMLFormula (Costing)

Direct Mapping

Note: Each Work Centre must have a corresponding Cost Center, Activity Type and Formula (Costing) entries if Work Centre Control Key = PM01

List of Custom Target Reports for this object is maintained here: Conversion Specification - Custom Reports Register.

Transformation Mapping

Mapping Table NameMapping Table Description
Activity TypeOld to New Activity Type
Cost CenterOld to New Cost Center
PlantOld to New Plant

List of Transformation Mappings with additional details is maintained here: Transformation Mappings

Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible
1Ensure DCT tables completenessSyWay A2D Data Team

2

Ensure all Transformation mappings are up to date.

SyWay Data Team


Pre-Load Validation

Project Team

Completeness

TaskAction
Verify Record CountSyWay A2D Data Team to verify that the total number of relevant records from the  DCT is equal to the total number of records in the Preload and Load Sheets.

Accuracy

TaskAction
Conversion Accuracy

SyWay A2D Data Team to verify that all fields below meet pass the checks:

  1. Mandatory Fields
  2. Field and Value Mapping Correctness
  3. Null Checks
  4. Text Length Checks
Review Error ReportsReview and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data.

Business

Completeness

TaskAction
Verify Record CountBusiness Data Owner/s to verify that the total number of relevant records from the the DCT is equal to the total number of records in the Preload and Load Sheets.

Accuracy

TaskAction
Conversion AccuracyBusiness Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data).


Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible

1

Ensure Pre-load sign-offs are obtained.

SyWay Data team

2

Go to the load tool and select the correct load Program.

SyWay Data team

3

Proceed with Data load.

SyWay Data team

4

Validate few records loaded by accessing standard transactions

SyWay Data team

5

Generate the post load reports in the tool.

SyWay Data team

6

Log errors as defects, if any and address resolutions. Close defects.

SyWay Data team

7

Resolve defects by reupload and re-generate post load reports if necessary.

SyWay Data team

8

Business to validate the post load files as part of post-load validation, raise data defects or provide the post-load sign-off.

Business

9

Repeat steps 5 to 7 if necessary.

SyWay Data team


Load Phase and Dependencies

PreCutover

Configuration

Item #Configuration Item
1T001W-Plants/Branches
2T002-Language Keys
3T006-Units of Measurement
4T430-Operation/Activity control key
5TC21-Standard value key
6TC23-Key for use of the Work Centre in the task lists
7TC24-Person responsible for the Work Centre
8TC25-Work Centre formulas
9TC26-Capacity category
10TC27-Capacity planner groups
11TC30-Work Centre category
12TC36-Available capacity version
13TFACD-Factory calendar definition
14TSP03-Spool: Printer declaration

Conversion Objects

Object #Preceding Object Conversion Approach
1071Activity Type
1074Cost Centre

Error Handling

Error TypeError DescriptionAction Taken

Configuration

Invalid Plant

Engage Functional team to expedite and fix the error in the system

ConfigurationInvalid Language KeyEngage Functional team to expedite and fix the error in the system
ConfigurationInvalid Unit of MeasurementEngage Functional team to expedite and fix the error in the system

Configuration

Invalid Operation/Activity control key

Engage Functional team to expedite and fix the error in the system

ConfigurationInvalid Standard value keyEngage Functional team to expedite and fix the error in the system
ConfigurationInvalid Key for use of the Work Centre in the task listsEngage Functional team to expedite and fix the error in the system

Configuration

Invalid Person responsible for the Work Centre

Engage Functional team to expedite and fix the error in the system

ConfigurationInvalid Work Centre formulaEngage Functional team to expedite and fix the error in the system
ConfigurationInvalid Capacity categoryEngage Functional team to expedite and fix the error in the system

Configuration

Invalid Capacity planner group

Engage Functional team to expedite and fix the error in the system

ConfigurationInvalid Work Centre categoryEngage Functional team to expedite and fix the error in the system
ConfigurationInvalid Available capacity versionEngage Functional team to expedite and fix the error in the system
ConfigurationInvalid Factory calendar definitionEngage Functional team to expedite and fix the error in the system
ConfigurationInvalid Spool: Printer declarationEngage Functional team to expedite and fix the error in the system

Invalid Data

Invalid Activity Type assigned

Expedite whether the master data is changed in the system

Invalid Data

Invalid Cost Centre assigned

Expedite whether the master data is changed in the system


Post-Load Validation

Project Team

Completeness

TaskAction

Verify Count

SyWay A2D Data Team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA.

Verify Logs

Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.).

Accuracy

TaskAction
Conversion Accuracy

Verify that the EAM Work Centre data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA.

Business

Completeness

TaskAction

Verify Count

Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file.

Accuracy

TaskAction

Conversion Accuracy

Verify that the EAM Work Centre data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA.


Key Assumptions

  • Master Data Standard is up to date as on the date of documenting this conversion approach and data load.
  • Data cleansing has met the required percentage threshold for the specified mock cycle and all preparation activities have been completed.
  • Data entries in DCT are target-ready data unless a specific transformation rule is stated for that field in the transformation rules.
  • Not all legacy PM Work Centres need to be mapped to S/4 HANA Work Centres. If any of the successor objects is dependent on a Work Centre field with no mapped values, this will be an enrichment activity or manual transformation for the successor object to derive the the Work Centre.


See also

Change log

Version Published Changed By Comment
CURRENT (v. 90) Apr 20, 2026 08:51 ERGUIZA-ext, Pinky Love
v. 126 Apr 16, 2026 14:28 ERGUIZA-ext, Pinky Love
v. 125 Mar 13, 2026 12:34 ERGUIZA-ext, Pinky Love
v. 124 Mar 09, 2026 13:34 ERGUIZA-ext, Pinky Love
v. 123 Mar 05, 2026 07:39 ERGUIZA-ext, Pinky Love
v. 122 Mar 05, 2026 07:38 ERGUIZA-ext, Pinky Love
v. 121 Mar 05, 2026 07:01 ERGUIZA-ext, Pinky Love
v. 120 Mar 05, 2026 06:52 ERGUIZA-ext, Pinky Love CR0368: Added INC-Legacy Work Center Category in Relevancy Criteria and Transformation Mapping
v. 119 Mar 04, 2026 09:20 ERGUIZA-ext, Pinky Love
v. 118 Feb 23, 2026 12:12 ERGUIZA-ext, Pinky Love

Go to Page History

Workflow history

Title Last Updated By Updated Status  
There are no pages at the moment.

  • No labels