Purpose
The purpose of this document is to define the conversion approach to create WBS - CAPEX/OPEX Settlement Rule in S/4 HANA.
Settlement rule is a set of parameters that defines how costs are transferred from a project's sender like a WBS element to receivers, such as a General Ledger account, Cost Centre, Asset Under Construction, fixed Asset, Profitability Segment, Superior WBS element.
Conversion Scope
The scope of this document covers the approach for converting applicable active WBS - CAPEX/OPEX Settlement Rule from Legacy Source Systems into S/4HANA following the WBS - CAPEX/OPEX Settlement Rule Master Data Design Standard.
The data being sourced using DCT (Data Collection Template).
Relevancy criteria
The data from legacy system includes:
- Settlement rules for Migrated WBS as per the scope of object 1026 - WBS - CAPEX, OPEX, Statistical.
The data from legacy system excludes:
- Capex WBS Settlement Rule for AUC generation - Rule generated automatically
- Settlement rule to superior WBS - Rule generated automatically
- Settlement rule to fixed asset - Rule generated automatically
- Recharged Project (with project profile ZPS0004) WBS - No settlement required
- Capex / Opex WBS workorder - Rule generated automatically
- Settlement Rule to PSG - Rule generated automatically
- Opex IT ??
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
| DCT | All Records | S/4HANA | TBD |
Additional Information
Multi-language Requirement
Document Management
Not applicable
Legal Requirement
Not applicable
Special Requirements
Not applicable
Target Design
The technical design of the target for this conversion approach.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| COBRB | OBJNR | J_OBJNR | WBS element | CHAR | 22 | Mandatory |
| COBRB | KONTY | KONTY | Account Assignment Category | CHAR | 2 | Mandatory |
| DKOBR | EMPGE | ABR_EMP | Settlement Receiver | CHAR | 40 | |
| COBRB | PROZS | BRGPROZS | Percent | DEC | 5 | |
| COBRB | AQZIF | AQZIF | Equivalence No. | DEC | 10 | |
| COBRB | BETRR | BETRR | Amount | CURR | 23 | |
| COBRB | BRTYP | BRTYP | Amount Rule Type | CHAR | 2 | |
| COBRB | PERBZ | PERBZ_LD | Settlement Type | CHAR | 3 | |
| COBRB | EXTNR | COBR_EXTNR | Distribution Rule No. | NUMC | 7 | |
| COBRB | SRSTRAT | SR_STRAT | Strategy | CHAR | 3 | |
| COBRB | GABPE | GABPE | From Period- Valid From Period | NUMC | 3 | |
| COBRB | GABJA | GABJA | From Fiscal Year- Valid From Year | NUMC | 4 | |
| COBRB | GBISJ | GBISJ | To Period- Valid To | NUMC | 4 | |
| COBRB | GBISP | GBISP | To Fiscal Year- Valid to Year | NUMC | 3 | |
| COBRA | APROF | Settlement Profile | ||||
| COBRB- | KOSTL | BRGKOSTL | Settlement Receiver- Cost Center | CHAR | 10 | |
| COBRB | PAOBJNR | RKEOBJNR | Settlement Receiver- Profitability Segment | CHAR | 10 | |
| COBRB | HKONT | SAKNR | Settlement Receiver- G/L Account | CHAR | 10 |
Data Cleansing
Data object WBS - Capex, Opex, Settlement Rule will be collected specifically for data migration.
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
| Not applicable |
Conversion Process
The high-level process is represented by the diagram below:
Data Privacy and Sensitivity
Not applicableExtraction
The data is manually collected by the business directly in Syniti Migrate. This is to be conducted using DCT (Data Collection Template) in Syniti Migrate. The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
Extraction Run Sheet
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| 1 | Ensure DCT is collected | Data Team |
| 2 | Perform preliminary completeness check, data quality check. | Data Team |
| 3 | Raise issues as defects if Req # 1 to 2 are not met | Data Team |
| 4 | Repeat Req # 1 to 3 if required | Data Team |
Selection Screen
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
| Not Applicable |
Data Collection Template (DCT)
Target Ready Data Collection Template will be created for WBS - Capex, Opex, Settlement Rule data with exception of some fields which require transformation as mentioned in the transformation rule.WBS - Capex, Opex, Settlement Rule DCT Rules
| Field Name | Field Description | Rule |
|---|---|---|
Extraction Dependencies
No Dependencies for Extract
| Item # | Step Description | Team Responsible |
|---|---|---|
| Not applicable |
Transformation
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:
- Perform value mapping and data transformation rules.
- Legacy values are mapped to the to-be values (this could include a default value)
- Values are transformed according to the rules defined in
- Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation
Transformation Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
1 | Obtain DCT Sign-off from Business | Data Team |
2 | Execute and Load and perform Transformation | Data Team |
3 | Monitor the transformation progress and ensure performance and completion is within allowed timeframe | Data team |
4 | Review and Validate Error and Preload Reports | Data Team |
5 | Generate data load count. | Data team |
6 | Generate Load Files | Data Team |
7 | Log errors as defects, if any and address resolutions. Close defects. | Data team |
| 8 | Re-transform and re-validate the Pre-load reports if necessary. | Data team |
| 9 | Validate the transformed file as part of pre-load validation, raise data defects or provide the pre-load sign-off. | Business |
| 10 | Analyze and resolve any pre-load defects logged by business. | Data team |
| 11 | Repeat steps 7 to 10 if necessary | Data team |
| 12 | Proceed to pre-load validations | Data team |
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
Transformation Mapping
| Mapping Table Name | Mapping Table Description |
|---|---|
| Not applicable |
Transformation Dependencies
List the steps that need to occur before transformation can commence| Item # | Step Description | Team Responsible |
|---|---|---|
| Not applicable |
Pre-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Verify Record Count | SyWay I2M Data Team to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets. |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | SyWay I2M Data Team to verify that all fields below meet pass the checks:
|
Review Error Reports | Review and correct the errors. Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source (DCT) data. |
Business
Completeness
| Task | Action |
|---|---|
Verify Record Count | Business Data Owner/s to verify that the total number of relevant records from the DCT is equal to the total number of records in the Preload and Load Sheets. |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | Business Data Owner/s to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off DCT data). |
Load
The load process includes:
- Execute the automated data load into target system using load tool or product the load file if the load must be done manually
- Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation
Load Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
1 | Load using transaction custom upload / custom fiori app | Data Team |
2 | Load 3 records for < > to validate if data is loaded successfully without errors | Data Team |
3 | Load 3 records for < > to validate if data is loaded successfully without errors | Data Team |
4 | Proceed with full load if steps 2 and 3 are validated | Data Team |
5 | Validate few records loaded by accessing | Data Team |
6 | Generate post load report if step 5 is validated | Data Team |
Load Phase and Dependencies
Configuration
| Item # | Configuration Item |
|---|---|
Conversion Objects
| Object # | Preceding Object Conversion Approach |
|---|---|
| list the exact title of the conversion object of only the immediate predecessor – this will then confirm the DDD (Data Dependency Diagram) | |
Error Handling
| Error Type | Error Description | Action Taken |
|---|---|---|
Post-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Verify Count | SyWay I2M Data Team to verify the record count created in target S/4 HANA by accessing post load reports from S/4 HANA. |
Verify Logs | Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue or attempt to load the record again, etc.). |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | Verify that the tables in target S/4 HANA were loaded correctly via SE16 download |
Business
Completeness
| Task | Action |
|---|---|
| Verify Count | Extract data in S/4 Hana via fiori tile and verify the count |
Accuracy
| Task | Action |
|---|---|
| Verify Count | Extract data in S/4 Hana via fiori tile and verify the count |
Key Assumptions
- Master Data Standard is up to date as on the date of documenting this conversion approach and data load.