Status

  Update in progress

OwnerPUN-ext, Eddy 
Stakeholders

Purpose

The purpose of this document is to define the conversion approach to create Measurement Document in S/4 HANA.


Conversion Scope

The scope of this document covers the approach for converting active Measurement Document from Legacy Source Systems into S/4HANA.

The approach is to migrate the last Measurement Document for each active Measuring Point which is driving the active Maintenance Plans and Items in order to start the Maintenance Plan in S/4 HANA with the objective to continue with the cycle.

The data from legacy system includes:

  1. Latest Measuring Document without reversal indicator for relevant Measuring Point that is a counter, OR
  2. Historical Data for associated Measuring Points for relevant Functional Locations and Equipment for the past 3 years, limited to specific Technical Object Type (list to be confirmed in Mapping Table) and list of Maintenance Plants.

The data from legacy system excludes:

  1. Measuring Document with reversal indicator


List of source systems and approximate number of records
SourceScope

Source Approx No. of Records

Target SystemTarget Approx

No. of Records

PF2, WP2Last Reading of Measurement Documents will be extracted from PF1 and WP16,000

S/4HANA

6,000
PF2, WP2Historical Measurement Documents will be extracted from PF1 and WP1nnnS/4HANAnnn
DCTMeasurement Documents for plants which do not have data existing from PF2 and PF2nnnS/4HANAnnn
DCTHistorical Measurement Documents for plants which do not have data existing from PF2 and PF2nnnS/4HANAnnn

Additional Information

Multi-language Requirement

Measurement document does not have multi language support. Measurement document text will be migrated using EN logon.

Document Management

Not Applicable

Legal Requirement

Not Applicable

Special Requirements






Target Design

The technical design of the target for this conversion approach.

TableFieldData ElementField DescriptionData TypeLengthRequirement
IMRGMDOCMIMRC_MDOCMMeasurement DocumentCHAR30Internal Number
IMRGPOINTIMRC_POINTMeasuring PointCHAR12Mandatory
IMRGIDATEIMRC_IDATEDate of the MeasurementDATS8Mandatory
IMRGITIMEIMRC_ITIMETime of MeasurementTIMS6Mandatory
IMRGMDTXTIMRC_MDTXTMeasurement Document TextCHAR40Optional
IMRGMLANGSPRASLanguage KeyLANG1Mandatory
IMRGCNTRRIMRC_CNTRRCounter Reading in SI UnitFLTP16Mandatory
IMRGREADGIMRC_READGMeasurement Reading/Total Counter Reading in SI UnitFLTP16Mandatory


Data Cleansing

IDCriticalityError Message/Report DescriptionRuleOutputSource System
9002-001

C3

Missing Measurement Document for Measuring Points assigned to Maintenance Plan


If the Measuring Point is assigned to an ACTIVE Maintenance Plan, it must have valid and relevant Measurement Documents.


This is the pre-requisite for Start PM Plan.

All key fieldsPF2, WP2




















Conversion Process

The high-level process is represented by the diagrams below.


The following represents the high-level process for Source System Extraction:

The following represents the high-level process for DCT:

Data Privacy and Sensitivity



Extraction

Extract data from a source into . There are 2 possibilities:

  1. The data exists. connects to the source and loads the data into . There are 3 methods:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Only if ; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
  2. The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly in . This is to be conducted using DCT (Data Collection Template) in

The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible
1Extract data from source system based on relevancy ruleData Team
2Google Sheet report pre-populated with PF2 and WP2 information to be generated based on relevancy criteria. Data Team







Selection Screen

Selection Ref ScreenParameter NameSelection TypeRequirementValue to be entered/set
Not Applicable



















Data Collection Template (DCT)

Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.

DCT Rules

Field NameField DescriptionRule
MDOCMMeasurement DocumentMust be unique
POINTMeasuring PointMust be an existing Measuring Point
IDATEDate of the MeasurementValid Date in the past, within 1 year from now
ITIMETime of MeasurementValid Time
MDTXTMeasurement Document TextNo Illegal Characters
MLANGLanguage KeyDefault "EN"
CNTRRCounter Reading in SI Unit

Counter reading cannot be 0

Counter Reading cannot be greater than overflow reading of Measuring Point

READGMeasurement Reading/Total Counter Reading in SI UnitTotal Counter Reading cannot be 0



Extraction Dependencies

Item #Step DescriptionTeam Responsible
1

Only measurement documents linked to relevant measuring points should be extracted.

Data Team










Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible

1

Ensure all mapping tables are up to date.

Syniti

2

In dspMigrate, select the wave –R3 S4/HANA – Plant Maintenance

Syniti

3

Go to Process Area Launch and Process the Object – Measurement Document

Syniti

4

Review and Validate Error and Preload Reports

Syniti

5

Execute the transformation to prepare the target tables

Syniti

6

Validate data from pre-load and invalid reports by region 

Business/Data owner

7

Generate export(load) file (If load tool is not dspIntergrate)

Data Team





 

 


Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic
1PF2/WP2/DCT

IMRG

POINT

Measuring Point

S/4 HANA

IMRG

POINT

Measuring Point

Value Mapping: Measuring Point

Use POINT to map from old to new Measuring Point


2PF2/WP2/DCT

IMRG

IDATE

Date of the Measurement

S/4 HANA

IMRG

IDATE

Date of the Measurement

Direct Mapping

3PF2/WP2/DCT

IMRG

ITIME

Time of Measurement

S/4 HANA

IMRG

ITIME

Time of Measurement

Direct Mapping

4PF2/WP2/DCT

IMRG

MDTXT

Measurement Document Text

S/4 HANA

IMRG

MDTXT

Measurement Document Text

Direct Mapping

5



S/4 HANA

IMRGMLANG

Language Key

Default to "EN"

6PF2/WP2/DCTIMRG

CNTRR

Counter Reading in SI Unit

S/4 HANAIMRG

CNTRR

Counter Reading in SI Unit

If total Counter Reading and Counter Reading is the same (IMRG-READG=IMRG-CNTRR):

Direct Mapping

Floating point conversion to apply for loading, including conversion to/from SI unit. Consider the unit from the Measuring Point characteristics and compare against table T006 for conversion.


Validation Rule: Counter reading cannot be 0


Validation Rule: Counter Reading cannot be greater than overflow reading of Measuring Point


If total Counter Reading and Counter Reading is not the same (IMRG-READG<>IMRG-CNTRR) – Counter Replacement Scenario


Direct Mapping.

Floating point conversion to apply for loading, including conversion to/from SI unit. Consider the unit from the Measuring Point characteristics and compare against table T006 for conversion.


7PF2/WP2/DCTIMRG

READG

Measurement Reading/Total Counter Reading in SI Unit

S/4 HANAIMRG

READG

Measurement Reading/Total Counter Reading in SI Unit

Direct Mapping.

Floating point conversion to apply for loading, including conversion to/from SI unit. Consider the unit from the Measuring Point characteristics and compare against table T006 for conversion.


This step can be achieved by setting the total counter reading externally upon counter replacement.


Validation Rule: Total Counter Reading cannot be 0

Transformation Mapping

Mapping Table NameMapping Table Description

 

INC-Equipment_Tecnical Object Type_APM


List of Functional Location and Equipment TOTs required for migrating historical Measurement Documents and Notifications


Measuring Point

Mapping of legacy Measuring Point to new Measuring Point





Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible

1.      

Measuring point XREF table should be available after measuring point loaded.

Data Team











Pre-Load Validation

Project Team

Completeness

TaskAction

Verify Record Count 

Data team to verify that the total number of relevant records from the source systems is equal to the total number of records in the Preload and Load Sheets.






Accuracy

TaskAction

Conversion Accuracy

Data team to verify that all fields below meet pass the checks:

1. Mandatory Fields

2. Field and Value Mapping Correctness

3. Null Checks

4. Text Length Checks

Review error reports

Review and correct the errors.  Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data.




Business

Completeness

TaskAction

Verify Record Count 

Business team to verify that the total number of relevant records from the source systems is equal to the total number of records in the Preload and Load Sheets. 






Accuracy

TaskAction

Conversion Accuracy

Business  to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off data) 






Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation

Load Run Sheet

Item #Step DescriptionTeam Responsible













Load Phase and Dependencies

  1. Relevant Measurement Document is loaded as part of Cutover phase.
  2. All Historical Data for Measurement Document is loaded as part of Pre-Cutover phase once Master Data Loaded

Configuration

Item #Configuration Item
1Language Key




Conversion Objects

Object #Preceding Object Conversion Approach
1012Measuring Point




Error Handling

Error TypeError DescriptionAction Taken

Invalid Data

Invalid Measurement Document

Expedite whether the master data is available in the system








Post-Load Validation

Project Team

Completeness

TaskAction

Verify Count

Data team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA.

Verify Logs

Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue, or attempt to load the record again, etc.).




Accuracy

TaskAction

Conversion Accuracy

Data team to verify that the Measurement Document data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. 






Business

Completeness

TaskAction

Verify Count

Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file.






Accuracy

TaskAction

Conversion Accuracy

Verify that the Measurement Document data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA.






Key Assumptions

  • Master Data Standard for Measuring Point is up to date as on the date of documenting this conversion approach and data load. 
  • Measurement Document is in scope based on data design and any exception requested by business.
  • Data cleansing has met the required percentage threshold for the specified mock cycle and all preparation activities have been completed.


See also

Change log

Version Published Changed By Comment
CURRENT (v. 28) Apr 23, 2026 07:06 PUN-ext, Eddy
v. 144 Apr 07, 2026 16:51 PUN-ext, Eddy
v. 143 Apr 06, 2026 10:45 PUN-ext, Eddy
v. 142 Mar 17, 2026 10:15 PUN-ext, Eddy CR0282-Update in Relevancy Criteria: 1. The logic used to identify APM-related Measurement Documents needs to be revised so that the relevancy assessment does not depend on S/4 data.
v. 141 Mar 17, 2026 10:12 PUN-ext, Eddy
v. 140 Mar 12, 2026 09:41 PUN-ext, Eddy
v. 139 Mar 12, 2026 09:40 PUN-ext, Eddy
v. 138 Mar 12, 2026 09:39 PUN-ext, Eddy
v. 137 Mar 12, 2026 09:34 PUN-ext, Eddy CR0282