Purpose
The purpose of this document is to define the conversion approach to create Measurement Document in S/4 HANA.
Measurement documents are used to record measurement readings on the condition of an equipment e.g. temperature. It is also used to record counter readings of an equipment e.g. Engine Running hours. This counter readings will be the trigger for maintenance plan to initiate maintenance and/or inspection work.
Conversion Scope
The scope of this document covers the approach for converting active Measurement Document from Legacy Source Systems into S/4HANA.
At Syensqo, Measurement Documents are created for Measuring Points to monitor the condition and usage of assets. They provide critical input to support condition-based and usage-based maintenance strategies. Measuring Points are created on either Functional Locations or Equipment, depending on the asset structure and monitoring requirement. The Measurement Documents are also a core component of Asset Performance Management (APM) used to monitor asset health, detect trends, and trigger condition-based or predictive maintenance actions.
The approach is to migrate the last Measurement Document for each active Measuring Point which is driving the active Maintenance Plans and Items in order to start the Maintenance Plan in S/4 HANA with the objective to continue with the cycle. For Measurement Documents related to APM, up to three years of historical data will be migrated from legacy systems to ensure seamless continuity in asset monitoring, trend analysis, and maintenance decision-making within the S/4 HANA.
The data from legacy system includes:
- Latest Measurement Document for relevant Measuring Point that is a counter (IMPTT-INDCT)
- where the Measurement Date (IMRG-IDATE) is before the Start Date of the linked Maintenance Plan Start for Time Based Plan
- where the Counter Reading (IMRG-CNTRR) is before the Start Counter Reading of the linked Maintenance Plan for Counter Based Plan
- Measurement Document for associated relevant Measuring Points for Functional Locations and Equipment for the past 3 years (IMRG-IDATE), limited to:
- specific Technical Object Type (EQUI-EQART/IFLOT-EQART) based on Value Mapping: OTH_Technical Object Type_APM and
The data from legacy system excludes:
- Measuring Document with reversal indicator (IMRG-CANCL)
- Long Text for Measurement Document
List of Tables to extract for this object is maintained here: Extract Table Register.
Illustration of relevant Measurement Document for extraction (Point 1 of relevancy criteria):
| Measuring Point | Measurement Document | Date | Time | Counter Reading | Reversal Indicator |
|---|---|---|---|---|---|
| A1 | 001 | 23 Feb 2026 | 10 am | 2010 | |
| A1 | 002 | 1 Mar 2026 | 2 am | 2040 | |
| A1 | 003 | 1 Mar 2026 | 4 am | 2050 | |
| A1 | 004 | 25 Feb 2026 | 5 pm | 2020 | |
| A1 | 005 | 2 Mar 2026 | 3 pm | 2060 | X |
| A1 | 006 | 26 Feb 2026 | 4 pm | 2021 | X |
Based on the above sample data, the following scenario and conclusion apply:
| Scenario | Maintenance Plan Start Date / Start Counter | Conclusion | Rationale |
|---|---|---|---|
| 1 | Not provided (blank) | Measurement Document 003 is to be extracted | Latest date and time without reversal indicator |
| 2 | Maintenance Plan Start Date = 27 February 2026 | Measurement Document 004 is to be extracted | Latest date and time without reversal indicator, closest and before 27 February 2026 |
| 3 | Maintenance Plan Start Counter = 2025 | Measurement Document 004 is to be extracted | Latest counter reading without reversal indicator, closest and before 2025 |
The following are not in scope for Measurement Document Conversion:
- Measurement Document Long Text
- Digital Local Indicators (eg Sensor Data available in Startek) as these will be mass created via Custom Development Program (ERP-582)
List of source systems and approximate number of records
| Source | Scope | Source Approx No. of Records | Target System | Target Approx No. of Records |
|---|---|---|---|---|
| PF2, WP2 | Relevant Measurement Documents will be extracted from PF2 and WP2 | 10,000 | S/4HANA | 10,000 |
| DCT | Measurement Documents for plants which do not have data existing from PF2 and PF2 | TBD | S/4HANA | TBD |
Additional Information
Multi-language Requirement
Measurement document does not have multi language support. Measurement document text will be migrated using EN logon.
Document Management
Not Applicable
Legal Requirement
Not Applicable
Special Requirements
Not Applicable
Target Design
The technical design of the target for this conversion approach.
| Table | Field | Data Element | Field Description | Data Type | Length | Requirement |
|---|---|---|---|---|---|---|
| IMRG | MDOCM | IMRC_MDOCM | Measurement Document | CHAR | 30 | Internal Number |
| IMRG | POINT | IMRC_POINT | Measuring Point | CHAR | 12 | Mandatory |
| IMRG | IDATE | IMRC_IDATE | Date of the Measurement | DATS | 8 | Mandatory |
| IMRG | ITIME | IMRC_ITIME | Time of Measurement | TIMS | 6 | Mandatory |
| IMRG | MDTXT | IMRC_MDTXT | Measurement Document Text | CHAR | 40 | Conditional |
| IMRG | MLANG | SPRAS | Language Key | LANG | 1 | Conditional |
| IMRG | CNTRR | IMRC_CNTRR | Counter Reading in SI Unit | FLTP | 16 | Mandatory |
| IMRG | READG | IMRC_READG | Measurement Reading/Total Counter Reading in SI Unit | FLTP | 16 | Mandatory |
| IMRG | VLCOD | IMRC_VLCOD | Valuation Code | CHAR | 4 | Conditional |
Data Cleansing
| ID | Criticality | Error Message/Report Description | Rule | Output | Source System |
|---|---|---|---|---|---|
| 9002-001 | C3 | Info Report: Missing Measurement Document for Measuring Points assigned to Maintenance Plan | If the Measuring Point is assigned to an relevant Maintenance Plan, it must have valid and relevant Measurement Documents. This is the pre-requisite for Start PM Plan. | Maintenance Plan, Maintenance Plan Text, Measuring Point, Measuring Point Description | PF2, WP2 |
Conversion Process
The high-level process is represented by the diagrams below.
The following represents the high-level process for Source System Extraction:
The following represents the high-level process for DCT:
Collection will be done manually in the Data Collection Template for the following scenarios:
- For sites not on SAP-PF2 or WP2 systems
Data Privacy and Sensitivity
Not Applicable.Extraction
Extract data from a source into Syniti Migrate. There are 2 possibilities:
- The data exists.Syniti Migrate connects to the source and loads the data into Syniti Migrate. There are 3 methods:
- Perform full data extraction from relevant tables in the source system(s).
- Perform extraction through the application layer.
- Only if Syniti Migrate; cannot connect to the source, data is loaded to the repository from the provided source system extract/report.
- The data does not exist (or cannot be converted from its current state). The data is manually collected by the business directly inSyniti Migrate. This is to be conducted using DCT (Data Collection Template) inSyniti Migrate
The agreed Relevancy criteria is applied to the extracted records to identify the records that are applicable for the Target loads
Extraction Run Sheet
| Req # | Requirement Description | Team Responsible |
|---|---|---|
| 1 | Extract data from source system based on relevancy rule | Data Team |
Selection Screen
| Selection Ref Screen | Parameter Name | Selection Type | Requirement | Value to be entered/set |
|---|---|---|---|---|
| Not Applicable |
Data Collection Template (DCT)
Target Ready Data Collection Template will be created for data with exception of some fields which require transformation as mentioned in the transformation rule.DCT Rules
| Field Name | Field Description | Rule |
|---|---|---|
| MDOCM | Measurement Document | Must be unique |
| POINT | Measuring Point | Must be an existing Measuring Point |
| IDATE | Date of the Measurement | Valid Date in the past, within 1 year from now |
| ITIME | Time of Measurement | Valid Time |
| MDTXT | Measurement Document Text | No Illegal Characters |
| MLANG | Language Key | Default "EN" |
| CNTRR | Counter Reading in SI Unit | Counter reading cannot be 0 Counter Reading cannot be greater than overflow reading of Measuring Point |
| READG | Measurement Reading/Total Counter Reading in SI Unit | Total Counter Reading cannot be 0 |
Extraction Dependencies
| Item # | Step Description | Team Responsible |
|---|---|---|
| 1 | Only measurement documents linked to relevant measuring points should be extracted. | Data Team |
Transformation
The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:
- Perform value mapping and data transformation rules.
- Legacy values are mapped to the to-be values (this could include a default value)
- Values are transformed according to the rules defined in
- Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation
Transformation Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
1 | Ensure all mapping tables are up to date. | Syniti |
2 | In dspMigrate, select the wave –R3 S4/HANA – Plant Maintenance | Syniti |
3 | Go to Process Area Launch and Process the Object – Measurement Document | Syniti |
4 | Review and Validate Error and Preload Reports | Syniti |
5 | Execute the transformation to prepare the target tables | Syniti |
6 | Validate data from pre-load and invalid reports by region | Business/Data owner |
7 | Generate export(load) file (If load tool is not dspIntergrate) | Data Team |
|
|
Transformation Rules
| Rule # | Source system | Source Table | Source Field | Source Description | Target System | Target Table | Target Field | Target Description | Transformation Logic |
|---|---|---|---|---|---|---|---|---|---|
| 1 | PF2/WP2/DCT | IMRG | POINT | Measuring Point | S/4 HANA | IMRG | POINT | Measuring Point | Value Mapping: Measuring Point Use POINT to map from old to new Measuring Point |
| 2 | PF2/WP2/DCT | IMRG | IDATE | Date of the Measurement | S/4 HANA | IMRG | IDATE | Date of the Measurement | Direct Mapping |
| 3 | PF2/WP2/DCT | IMRG | ITIME | Time of Measurement | S/4 HANA | IMRG | ITIME | Time of Measurement | Direct Mapping |
| 4 | PF2/WP2/DCT | IMRG | MDTXT | Measurement Document Text | S/4 HANA | IMRG | MDTXT | Measurement Document Text | Direct Mapping |
| 5 | S/4 HANA | IMRG | MLANG | Language Key | Default to "EN" | ||||
| 6 | PF2/WP2/DCT | IMRG | CNTRR | Counter Reading in SI Unit | S/4 HANA | IMRG | CNTRR | Counter Reading in SI Unit | If total Counter Reading and Counter Reading is the same (IMRG-READG=IMRG-CNTRR): Direct Mapping Floating point conversion to apply for loading, including conversion to/from SI unit. Consider the unit from the Measuring Point characteristics and compare against table T006 for conversion. Validation Rule: Counter reading cannot be 0 Validation Rule: Counter Reading cannot be greater than overflow reading of Measuring Point If total Counter Reading and Counter Reading is not the same (IMRG-READG<>IMRG-CNTRR) – Counter Replacement Scenario Direct Mapping. Floating point conversion to apply for loading, including conversion to/from SI unit. Consider the unit from the Measuring Point characteristics and compare against table T006 for conversion. |
| 7 | PF2/WP2/DCT | IMRG | READG | Measurement Reading/Total Counter Reading in SI Unit | S/4 HANA | IMRG | READG | Measurement Reading/Total Counter Reading in SI Unit | Direct Mapping. Floating point conversion to apply for loading, including conversion to/from SI unit. Consider the unit from the Measuring Point characteristics and compare against table T006 for conversion. This step can be achieved by setting the total counter reading externally upon counter replacement. |
Transformation Mapping
| Mapping Table Name | Mapping Table Description |
|---|---|
OTH_Technical Object Type_APM | List of Functional Location and Equipment TOTs required for migrating historical Measurement Documents and Notifications |
| Measuring Point | Mapping of legacy Measuring Point to new Measuring Point |
Transformation Dependencies
List the steps that need to occur before transformation can commence| Item # | Step Description | Team Responsible |
|---|---|---|
1. | Measuring point XREF table should be available after measuring point loaded. | Data Team |
Pre-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Verify Record Count | Data team to verify that the total number of relevant records from the source systems is equal to the total number of records in the Preload and Load Sheets. |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | Data team to verify that all fields below meet pass the checks: 1. Mandatory Fields 2. Field and Value Mapping Correctness 3. Null Checks 4. Text Length Checks |
Review error reports | Review and correct the errors. Achieve a zero-error record count as much as possible. Raise defects for data remediated and requiring a correction in the source data. |
Business
Completeness
| Task | Action |
|---|---|
Verify Record Count | Business team to verify that the total number of relevant records from the source systems is equal to the total number of records in the Preload and Load Sheets. |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | Business to verify that all the data in the load table/file is accurate as per endorsed transformation/mapping rules (and signed-off data) |
Load
The load process includes:
- Execute the automated data load into target system using load tool or product the load file if the load must be done manually
- Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation
Load Run Sheet
| Item # | Step Description | Team Responsible |
|---|---|---|
Load Phase and Dependencies
- Relevant Measurement Document is loaded as part of Cutover phase.
- All Historical Data for Measurement Document is loaded as part of Pre-Cutover phase once Master Data Loaded
Configuration
| Item # | Configuration Item |
|---|---|
| 1 | Language Key |
Conversion Objects
| Object # | Preceding Object Conversion Approach |
|---|---|
| 1012 | Measuring Point |
Error Handling
| Error Type | Error Description | Action Taken |
|---|---|---|
Invalid Data | Invalid Measurement Document | Expedite whether the master data is available in the system |
Post-Load Validation
Project Team
Completeness
| Task | Action |
|---|---|
Verify Count | Data team to verify the record count created in target S/4 HANA by accessing post load reports in dspMigrate or standard reports from S/4 HANA. |
Verify Logs | Check if there is data that failed to load and perform the necessary actions (e.g. register as post load issue, or attempt to load the record again, etc.). |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | Data team to verify that the Measurement Document data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. |
Business
Completeness
| Task | Action |
|---|---|
Verify Count | Download Post Load Reports from dspMigrate and verify that the record count loaded in the target S/4 HANA is the same count as of the endorsed load file. |
Accuracy
| Task | Action |
|---|---|
Conversion Accuracy | Verify that the Measurement Document data in target S/4 HANA were loaded correctly via dspMigrate post load reports or standard reports from S/4 HANA. |
Key Assumptions
- Master Data Standard for Measuring Point is up to date as on the date of documenting this conversion approach and data load.
- Measurement Document is in scope based on data design and any exception requested by business.
- Data cleansing has met the required percentage threshold for the specified mock cycle and all preparation activities have been completed.