The purpose of this document is to define the conversion approach to create conversion for Object 1080 Mixing Ratios.

Mixing Ratios are the ratios which are maintained for mixed costing. Mixing ratios are weighting factors assigned to the procurement alternatives. This weighting factor is obtained from the planning department based on the usage of the procurement alternatives during the planning year. The pre-requisites for maintaining mixing ratios are production version and production alternatives. 

The document details out the field list, extraction criteria, scoping, mapping, transformation logic, generation of the pre-load file and loading of the same with respect to the object 1080 - Mixing Ratios.

Key tables and fields: 

The tables mentioned below are the main tables used for Mixing Ratios in S4.

  • CKMLMV001 – This table in SAP is primarily used to store Procurement Alternatives data. This table contains various fields that hold specific information or linking keys about procurement alternatives such as Procurement alternatives, object type, valuation area etc.
  • CKMLMV003 – This table in SAP stores information related to mixing ratios. The table stores information of mixing ratios with reference to the procurement alternatives and production version.


     Table: CKMLMV001 is the central table for defining procurement alternatives in SAP S/4HANA, which is a pre-requisite for migrating mixing ratios. The key fields of this table are:  

  • MATNR – The MATNR is the material number of the material for which the procurement alternative is being maintained.
  • WERKS – The WERKS is the plant in which the material will be costed.
  • OTYP – The OTYP (Object type) field identifies the object type e.g. “BA – Procurement Alternative”, “PR – Procurement Process”, “EB-Sales Order Stock”, “LA – Activity type” etc.
  • KALNR – This field stores the procurement alternative/Process number. A procurement alternative represents one of a number of different ways of procuring a specific material. You can control the level of detail in which the procurement alternatives are represented through the controlling level. Depending on the processing category, there are single-level and multilevel procurement alternatives. For example, "purchase order" is single-level procurement and "production" is multilevel procurement.
  • BTYP – The process categories differentiate between the different types of procurement or consumption of materials. For example, the process categories "production" and "purchase order" represent two different methods of procuring a material. Since different methods of procurement or consumption are handled by the SAP System in different ways, the system updates different types of data. On the basis of this data, characteristics can be derived and used to create procurement processes, procurement alternatives, and consumption alternatives. E.g. “BB-Purchase Order”, “BF-Production”, “BL-Subcontracting” etc.
  • SEPZ_NAME_ND - This field helps define a user defined name for procurement alternatives / consumption alternative. This can be defined by the user using controlling levels and which can be used to identify transactions in the ML data.


     Table: CKMLMV003 is the central table for defining mixing ratios in relation to procurement alternatives in SAP S/4HANA:  

  • MATNR – The MATNR is the material number of the material for which the procurement alternative and mixing ratio(s) are being maintained.
  • WERKS – The WERKS is the plant in which the material will be costed and for which the mixing ratios will be maintained.
  • KALNR_BAL – This field is a key field and stores the procurement alternative number. A procurement alternative represents one of a number of different ways of procuring a specific material. You can control the level of detail in which the procurement alternatives are represented through the controlling level. Depending on the processing category, there are single-level and multilevel procurement alternatives. For example, "purchase order" is single-level procurement and "production" is multilevel procurement.
  • KALNR_IN – This field is a key field and stores the procurement process number. It is a process in Product Cost Controlling that calculates and displays the costs incurred in the process of procuring materials. A procurement process identifies such a process for one or more materials. A process can produce multiple materials simultaneously (such as when co-products are involved), while a procurement alternative represents the procurement of a single material. Depending on the process category, the procurement process can be single-level or multilevel.
  •  MGTYP – The Quantity structure type is a key field and it is used in costing with quantity structure. When costing, this controls if and how mixed costing is performed. The quantity structure type is used to determine which procurement alternatives will be used with what mixing ratio for the materials involved in the costing.  Therefore, it determines for how long the mixing ratios are valid.
  • GJAHR – The year stores the year information for which the mixing ratio is being maintained. While maintaining mixing ratios, it is important to maintain the year.
  • PERIO – The period stores the period specific information for which the mixing ratio is valid.
  • LOSGR_PC The costing lot size in the material master record is usually used as a basis for costing all materials within one low-level code. If these materials (such as semi-finished products) are used in materials (such as finished products) in the next-highest low-level code, the costing results are converted to the costing lot size of the material costed (in this case, the finished product) to calculate the material costs for the finished product.
  • MEINS_PC – This field displays the unit of measure in which the quantity is displayed.
  • ALDAT_PC – This field displays the date with which the quantity structure is selected for the cost estimate with quantity structure.
  • MISCH_VERH – This field provides the weightage to be applied to individual procurement alternative when the cost estimate is executed using the mixed cost estimate. This can be entered in equivalence numbers or percentages.

The mixing ratios can be extracted from the legacy SAP system and loaded to S4 Hana via Syniti. However, SAP has not provided a standard migration object for migration of mixing ratios and hence, for the conversion of this object, the data/details will be extracted from ECC and transformed as applicable for S4HANA in Syniti and will be loaded to S4, using LTMC or a custom program.

Conversion Scope

The scope of this document covers the approach for converting active Mixing ratios from Legacy Source Systems (ECC) into S/4HANA following the Master Data Design Standard - DD-FUN-050 Master Data Standard_1080 – Mixing ratios.

The data from legacy system includes:

  1. Active and valid records for Mixing ratios which are still in use/valid and have validity date is >= cutover date i.e. CKMLMV003-GJAHR = Cutover year and CKMLMV003-BRDAT is the latest date. To combine tables CKMLMV001 and CKMLMV003 use MATNR (Material), WERKS (Plant) and KALNR_BAL (Procurement Alternative). In CKMLMV001 the procurement alternative field is KALNR whereas in CKMLMV003 it is KALNR_BAL. So the logic would be CKMLMV001-KALNR=CKMLMV003-KALNR_BAL

The data from legacy system excludes:

  1. All Mixing ratio records which have a validity date in the past and are not in use in any exposure

List of source systems and approximate number of records <All plants in PF2 and WP2 for which mixing ratios have been maintained for the cutover year will be relevant for migration. This information will be available in the table CKMLMV003 in PF2 and WP2 system >

Source

Scope

Source Approx No. of Records

Target System

Target Approx

No. of Records

PF2

Active and in use Mixing Ratio Records

72106 for 2025 and 4168 for 11/2025

S4HANA

XXXX

WP2

Active and in use Mixing Ratio Records

14644 for 2025 and 464 for 11/2025

S4HANA

XXXX

Additional Information

Multi-language Requirement

None

Document Management

Not Applicable

Legal Requirement

Not Applicable

Special Requirements

Not Applicable

Target Design


The Target design of the object 1080 – Mixing Ratios is based on the MDS - DD-FUN-050 Master Data Standard_1080 – Mixing Ratios Master Data is as below

The technical design of the target for this conversion approach. 

Table – CKMLMV001: Procurement Alternatives

Table

Field

Data Element

Field Description

Data Type

Length

Requirement

CKMLMV001

MATNR

MATNR

Material Number

CHAR

40

Required

CKMLMV001

WERKS

WERKS_D

Plant

CHAR

4

Required

CKMLMV001

OTYP

CKML_OTYP

Object Type

CHAR

2

Required

CKMLMV001

KALNR

CKML_ALPROCNR

Procurement Alternative/Process

NUMC

12

Required

CKMLMV001

BTYP

CKML_BTYP

Process Category

CHAR

4

Required

CKMLMV001

SEPZ_NAME_ND

CKML_SEPZ_NAME

User defined name

CHAR

30

Optional

Table – CKMLMV003: Process model: Receipts / mixing strategies

Table

Field

Data Element

Field Description

Data Type

Length

Requirement

CKMLMV003

MATNR

MATNR

Material Number

CHAR

40

Required

CKMLMV003

WERKS

WERKS_D

Plant

CHAR

4

Required

CKMLMV003

KALNR_BAL

CKML_N_BALTNR

Procurement Alternative

NUMC

12

Required

CKMLMV003

MGTYP

CKML_MGTYP

Quantity Structure Type

CHAR

5

Required

CKMLMV003

GJAHR

GJAHR

Fiscal Year

NUMC

4

Required

CKMLMV003

PERIO

POPER

Posting Period

NUMC

3

Optional

CKMLMV003

LOSGR_PC

CK_LOSGR

Lot Size

QUAN

13 and 3 Decimals

Required

CKMLMV003

MEINS_PC

MEINH

Unit of Measure

UNIT

3

Required

CKMLMV003

ALDAT_PC

CK_BRDAT

Quantity Structure Date

DATS

8

Required

CKMLMV003

KALNR_IN

CKML_N_PROCNR

Procurement Process

NUMC

12

System Generated

CKMLMV003

MISCH_VERH

CK_CROSSR

Mixing Ratio

DEC

13 and 3 Decimals

Required


Data Cleansing

For the purpose of the Object 1080 – Mixing Ratios, it is expected that only the relevant data will be extracted to the S4 system. Data cleansing is not relevant for extraction. 

Conversion Process

The generic high-level process steps for the conversion are as below:

  1. Extraction:
    1. Extract from the source systems: Apply the selection parameters and data relevancy as mentioned in this specification, from the relevant tables
  2. Transform 
    1. Transform fields by applying the fields and value mapping in the Syniti 
    2. Generate and validate Pre-load files
  3. Load
    1. Load the validated Pre-load file using LSMW or a custom program to upload the mixing ratios to S4.

Data Privacy and Sensitivity

None


Extraction

Extraction of data from a source into S4. There are 2 possibilities:

  1. The data exists in the source. Syniti connects to the source system, then “extracts, transforms and loads” the data into S4. There are 3 approaches:
    1. Perform full data extraction from relevant tables in the source system(s).
    2. Perform extraction through the application layer.
    3. Data is loaded to the repository from the provided source system extract/report. This approach is considered if we cannot connect to the source system.
  2. The extraction will be based on the signed off extraction rules.
  3. The relevancy criteria for mixing ratios (if any) as captured in the relevancy criteria sheet will be considered.

Extraction Run Sheet

Req #Requirement DescriptionTeam Responsible

01

All Active and valid records for mixing ratios will be migrated from WP2 and PF2. The mixing ratio should be active for the cutover year. 

Syniti Team

02

Mixing ratios will be relevant only for materials in scope as per conv spec 2019 and plants as per conv spec 2010

Syniti Team

03

Mixing ratios should be greater  than "0" for them to be migrated.

Syniti Team

Note: Only materials identified as relevant for migration as per conversion spec 2010 and 2019 would be considered as in-scope for mixing ratios. 

Selection Screen

Not Applicable


Data Collection Template (DCT)

Not Applicable


Extraction Dependencies

Item #Step DescriptionTeam Responsible

01

Any period / year end close activities have been fully completed

Business

02

Active and relevant mixing ratio records have been identified

Business

03

Production versions and Procurement alternatives have been configured

Functional team

Transformation

The Target fields are mapped to the applicable Legacy field that will be its source, this is a 3-way activity involving the Business, Functional team and Data team. This identifies the transformation activity required to allow to make the data Target ready:

  1. Perform value mapping and data transformation rules.
    1. Legacy values are mapped to the to-be values (this could include a default value)
    2. Values are transformed according to the rules defined in
  2. Prepare target-ready data in the structure and format that is required for loading via prescribed Load Tool. This step also produces the load data ready for business to perform Pre-load Data Validation

Transformation Run Sheet

Item #Step DescriptionTeam Responsible

1

Ensure all the fields that require value mapping, as stipulated Mapping tables, have the latest signed-off mapping files imported into Syniti

Data team

2

Ensure that signed off value mappings have been maintained in the Syniti 

Syniti team

3

Confirm the value mappings are maintained in Syniti

Data team

4

Ensure that the relevancy rules for extraction are signed off by all relevant business stakeholders.  

Syniti/Data team

5

Execute transformation for the object 

Syniti team

6   

Monitor the transformation progress and ensure performance and completion is within allowed timeframe

Syniti/Data team

7.      

Generate Pre-Load reports.

Syniti team

8.      

Generate data load count.

Syniti team

9.      

Log errors as defects, if any and address resolutions. Close defects.

Syniti/Data team

10.      

Re-transform and re-validate the Pre-load reports if necessary.

Syniti/Data team

11.   

Validate the transformed file as part of pre-load validation, raise data defects or provide the pre-load sign-off.

Business

12.   

Analyse and resolve any pre-load defects logged by business.

Syniti/Data team

13.   

Repeat steps 5 to 11 if necessary

Syniti/Data team

14.   

Proceed to pre-load validations

Data team


Transformation Rules

Rule #Source systemSource TableSource FieldSource DescriptionTarget SystemTarget TableTarget FieldTarget DescriptionTransformation Logic

01

WP2 / PF2

CKMLMV001

MATNR

Material Number

S4 HANA

CKMLMV001

MATNR

Material Number

From Value mapping

02

WP2 / PF2

CKMLMV001

WERKS

Plant

S4 HANA

CKMLMV001

WERKS

Plant

From Value mapping

03

WP2 / PF2

CKMLMV001

OTYP

Object Type

S4 HANA

CKMLMV001

OTYP

Object Type

System Generated 

04

WP2 / PF2

CKMLMV001

KALNR

Procurement Alternative/Process

S4 HANA

CKMLMV001

KALNR

Procurement Alternative/Process

From Value mapping

05

WP2 / PF2

CKMLMV001

BTYP

Process Category

S4 HANA

CKMLMV001

BTYP

Process Category

System Generated 

06

WP2 / PF2

CKMLMV001

SEPZ_NAME_ND

User defined name

S4 HANA

CKMLMV001

SEPZ_NAME_ND

User defined name

Copy As Is 

07

WP2 / PF2

CKMLMV003

MATNR

Material Number

S4 HANA

CKMLMV003

MATNR

Material Number

From Value Mapping

08

WP2 / PF2

CKMLMV003

WERKS

Plant

S4 HANA

CKMLMV003

WERKS

Plant

From Value mapping

09

WP2 / PF2

CKMLMV003

KALNR_BAL

Procurement Alternative

S4 HANA

CKMLMV003

KALNR_BAL

Procurement Alternative

From Value mapping

10

WP2 / PF2

CKMLMV003

MGTYP

Quantity Structure Type

S4 HANA

CKMLMV003

MGTYP

Quantity Structure Type

Copy As is

11

WP2 / PF2

CKMLMV003

GJAHR

Fiscal Year

S4 HANA

CKMLMV003

GJAHR

Fiscal Year

Current Year

12

WP2 / PF2

CKMLMV003

PERIO

Posting Period

S4 HANA

CKMLMV003

PERIO

Posting Period

Copy As Is

13

WP2 / PF2

CKMLMV003

LOSGR_PC

Lot Size

S4 HANA

CKMLMV003

LOSGR_PC

Lot Size

Copy As is

14

WP2 / PF2

CKMLMV003

MEINS_PC

Unit of Measure

S4 HANA

CKMLMV003

MEINS_PC

Unit of Measure

Copy As Is

15

WP2 / PF2

CKMLMV003

ALDAT_PC

Quantity Structure Date

S4 HANA

CKMLMV003

ALDAT_PC

Quantity Structure Date

Copy As Is

16

WP2 / PF2

CKMLMV003

KALNR_IN

Procurement Process

S4 HANA

CKMLMV003

KALNR_IN

Procurement Process

From Value Mapping

17

WP2 / PF2

CKMLMV003

MISCH_VERH

Mixing Ratio

S4 HANA

CKMLMV003

MISCH_VERH

Mixing Ratio

Copy As Is


Transformation Mapping

Below value mapping tables should be constructed in Syniti 
Mapping Table NameMapping Table Description

Controlling Area

Controlling area should be configured and be available in value mapping or as default if only one controlling area is being used

Ledger

Ledger(s) should be configured and should be available.

Version

Version should be configured and should be available.

Production Version

Production Version should be configured and should be available

Production Alternative

Production Alternative should be configured and should be available.

Transformation Dependencies

List the steps that need to occur before transformation can commence
Item #Step DescriptionTeam Responsible

1

Ensure all the fields that require value mapping, as stipulated Mapping tables, have the latest signed-off mapping files imported into Syniti

Data team

2

Ensure that signed off value mappings have been maintained in the Syniti 

Syniti team

3

Confirm the value mappings as maintained in the Syniti

Data team

4

Ensure that Signed off DCT (if any) from business has been received and maintained in Syniti

Syniti/Data team

5

Confirmation and signoff on the extracted values

Syniti, Data and business

Pre-Load Validation

Project Team

The Pre Load validations are performed by Project Team

Completeness

TaskAction

Generation of
Pre-load reports

Mandatory field check.

  • Check if the fiscal year and period is correctly maintained
  • Check if the procurement alternative and production version are maintained correctly.
  • Check the controlling area

Record Count

Record Count

Confirm the record counts in preload summary report

  • Total Records: 
  • Valid Records:

Invalid Records:

Business Confirmation

Data team after the initial validation of Pre-Load validation based on the pre agreed validation checklist

To send the Pre-Load file to the Business Representatives for all plants/valuation area in scope for conversion

Business Representatives to validate the pre-load file

Agree with data team on the next steps for erroneous records

Accuracy

The Pre Load validations are performed by Project Team

TaskAction

Generation of
Pre-load reports

Mandatory field check.

  • Check if the fiscal year and period is correctly maintained
  • Check if the procurement alternative and production version are maintained correctly.
  • Check the controlling area

Record Count

Record Count

Confirm the record counts in preload summary report

  • Total Records: 
  • Valid Records:

Invalid Records:

Business Confirmation

Data team after the initial validation of Pre-Load validation based on the pre agreed validation checklist

To send the Pre-Load file to the Business Representatives for all plants/valuation area in scope for conversion

Business Representatives to validate the pre-load file

Agree with data team on the next steps for erroneous records


Business

Completeness

TaskAction

Check Data load register count

Business Data Owner/s to verify that the total number of relevant records to be converted as per relevancy / DCT is equal to the total number of records in the Preload file.


Accuracy

TaskAction

Conversion accuracy

To check and validate the load files with all the transformation and mapping rules, to be signed off.

Load

The load process includes:

  1. Execute the automated data load into target system using load tool or product the load file if the load must be done manually
  2. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation
  3. Execute the automated data load into target system using load tool or produce the load file if the loading of records to be done using LTMC cockpit object of Mixing ratios.
  4. Once the data is loaded to the target system, it will be extracted and prepared for Post Load Data Validation with side by side check of each fields in scope of the objects with fields to be displayed as XXXX_ECC, XXXX_S4HANA, XXXX_MATCH ( As TRUE or FALSE) with an additional column denoting fields not matching and status of loading in S/4HANA as LOADED_IN_S4HANA ( As TRUE or FALSE) 

Load Run Sheet

Item #Step DescriptionTeam Responsible

1

Go to load file and pick 5 data records, load manually without any tool. See what happens. If all okay, proceed with the next step.

Data team

2

Go to load file and pick 10 records and load them with the tool. No action if the previous step has fallen. If not, then continue to load 10 records with the tool. Check if everything went okay.

Data team

3

Proceed with the full load if steps one and two were succeed else fix the issue with records

Data team

4

Validate few records loaded by accessing standard transactions from S/4HNA e.g. CK94 to check the mixing ratios.

Data team

5

Generate post load report if step 5 is validated

Data team

6

Log errors as defects, if any and address resolutions. Close defects.

Data team

7

Resolve defects by reupload and re-generate post load reports if necessary.

Data team

8

Business to validate the post load files as part of post-load validation, raise data defects or provide the post-load sign-off.

Business

9

Repeat steps 1 to 5 if necessary.

Data team

Load Phase and Dependencies

The load phase for this object is ideally relevant for pre-cutover Phase 4

Configuration

Below configurations must exist to facilitate the conversion of this object.

Item #Configuration Item

01

Controlling Area

02

Company code

03

Production Version

04

Production Alternatives

Conversion Objects

Object #Preceding Object Conversion Approach
CNV-2010Materials - General Plant Data / S.Loc Data
CNV-2019Materials - Basic View
CNV-2012Materials - Accounting 1
CNV-2013Materials - Costing 1
CNV-2014Materials - Accounting 2
CNV-2015Materials - Costing 2

Error Handling

The table below depicts some possible system errors for this data object during data load.  All data load error is to be logged as defect and managed within the Defect Management

Error TypeError DescriptionAction Taken

Procurement Alternative 

Procurement Alternative not maintained

Ensure that all required procurement Alternatives are maintained

Fiscal Year

Enter correct fiscal year

Correct fiscal year

Production Version 

Production Version not maintained

Ensure that all required Production Versions are maintained

Post-Load Validation

Project Team

The following post load validations will be done by Project Team

Completeness

TaskAction

Reconciliation of Record Count

Record Count - Count and check how many records were loaded vs. Records in the load file (Each mock has its own data record count)

Check for logs from Load and fix erroneous records, if any.

Accuracy

TaskAction

Check values in key fields for accuracy

Post-load reports will have the same structure as the load file and some additional columns as required to facilitate the post load validation.

Leverage on tool to create a Post Load report that reports S/4HANA loaded records along with the legacy values side-by-side to allow for 100% check of all these fields in the shortest possible time.

Any mismatch will be reported under the Post Load - Error report.


Business

The following post load validations will be done by business.

Completeness

TaskAction

Record Count Check

Review the record count report from the Data Team and ensure it is correct by cross-checking with the record count confirmed during Pre-load Business Validations

Business may also run transaction code CK94 to cross check the Mixing Ratios 


Accuracy

TaskAction

Field Checks

Check the fields to ensure that Activity Prices have been properly maintained

Value Check

Check the activity prices against activity types and corresponding cost centres.

Key Assumptions

  • Relevancy rules have been thoroughly validated and signed off by business.
  • All relevant configurations have been maintained.

See also

Change log

Version Published Changed By Comment
CURRENT (v. 13) Jan 07, 2026 11:06 GANESAN-ext, Shivkumar
v. 18 Jan 07, 2026 11:00 GANESAN-ext, Shivkumar
v. 17 Dec 12, 2025 12:07 GANESAN-ext, Shivkumar
v. 16 Dec 03, 2025 13:08 GANESAN-ext, Shivkumar
v. 15 Dec 03, 2025 12:54 GANESAN-ext, Shivkumar
v. 14 Nov 28, 2025 17:39 GANESAN-ext, Shivkumar
v. 13 Nov 28, 2025 13:16 GANESAN-ext, Shivkumar
v. 12 Nov 27, 2025 11:34 GANESAN-ext, Shivkumar
v. 11 Nov 27, 2025 11:27 GANESAN-ext, Shivkumar
v. 10 Nov 27, 2025 10:09 GANESAN-ext, Shivkumar

Go to Page History

  • No labels